行情中心 沪深京A股 上证指数 板块行情 股市异动 股圈 专题 涨跌情报站 盯盘 港股 研究所 直播 股票开户 智能选股
全球指数
数据中心 资金流向 龙虎榜 融资融券 沪深港通 比价数据 研报数据 公告掘金 新股申购 大宗交易 业绩速递

中国中铁:中国中铁2025年度环境、社会和公司治理报告暨可持续发展报告(英文)

上海证券交易所 03-31 00:00 查看全文

About This Report

This report is the 18th consecutive Environmental Social and Governance (ESG) Report and Sustainability Report

issued by China Railway Group Limited (CREC) aiming to disclose the Company's ESG strategy management

systems practical initiatives and key performance while addressing key ESG issues of various stakeholders.Reporting frequency

The Report is an annual report covering the period from January 1 2025 to December 31 2025. To enhance

comparability and forward-looking perspective certain content extends beyond this timeframe.Reporting scope

The scope of this report encompasses CREC and all its subsidiaries.Title description

In this report China Railway Group Limited is also referred to as "CREC" "the Company" and "we/us". Please

refer to the Appendix "Terms and Definitions" for the full names and short names of CREC's subsidiaries.References

2030 Agenda for Sustainable Development released by the United Nations

Reference Indicator System for the ESG Special Report of Listed Companies Controlled by Central Enterprises

issued by the State-owned Assets Supervision and Administration Commission of the State Council ("SASAC")

Sustainability Disclosure Standards for Business Enterprise-Basic Standard (Trial) issued by the Ministry of

Finance of the People's Republic of China

Appendix C2 Environmental Social and Governance Reporting Code to the Hong Kong Exchanges and

Clearing Limited's Listing Rules

Guidelines No.14 of Shanghai Stock Exchange for Self-Regulation of Listed Companies-Sustainability Report

(Trial) and Guide No.4 for Self-Regulatory Supervision on Listed Companies of the SSE-Compilation of

Sustainable Development Reports issued by Shanghai Stock Exchange

Guidelines on Sustainable Development Reporting for Chinese Enterprises (CASS-ESG 6.0) issued by Chinese

Academy of Social Sciences

Access to the report

This report is published in both Chinese and English. In case of discrepancies the Chinese version shall prevail.The electronic version is available for download in the Sustainability section of CREC's website: http://www.crecg.com.2025 Environmental Social and Governance Report and Sustainability Report

Chairman's Statement

Secretary of the Party Committee

and Chairman of China Railway

Group Limited

Chen Wenjian

The year 2025 was both extraordinary and challenging. Through persistent efforts CREC delivered

remarkable accomplishments. Guided by Xi Jinping Thought on Socialism with Chinese Characteristics

for a New Era we fully implemented the guiding principles from the 20th CPC National Congress and its

subsequent plenary sessions. Staying committed to high-quality development as our core mission we

upheld national priorities and fulfilled our responsibilities as a central SOE. Despite navigating strong

headwinds and overcoming numerous challenges we achieved tangible results in adapting to changes

stabilizing operations and forging new paths forward. Together we wrote a new chapter in building a

"High-Quality CREC".

01Chairman's Statement

This year we strengthened our ideological foundation production lines in batches improving both work efficiency

to guide development. We upheld the "Two Upholds" as and project quality. In the past year we won a total of 343

the highest political principle and fundamental discipline provincial- and ministerial-level science and technology

throughout Party building reform and development. We progress awards and 2 China Patent Awards and led

promptly studied General Secretary Xi Jinping's directives on the release of 3 ISO international standards elevating

central SOE work and launched campaigns to implement the innovation capacity to new heights. We highlighted the

spirit of the Fourth Plenary Session of the 20th CPC Central "baton" of performance evaluation improved positive

Committee. Developing the 15th Five-Year Plan became a incentive mechanisms and established a clear high-quality

practical exercise to enhance political competencies. We development orientation fostering a stronger company-

intensified education on the Central Committee's Eight- wide atmosphere of entrepreneurship and excellence.Point Decision fostering a culture rooted in integrity. The

"Three Transformations" initiative crystallized into five major This year we demonstrated our dedication to serving

development reforms and ten innovation achievements. the people through concrete actions. We upheld the

We established a new corporate value system centered people-centered development philosophy embodying

on "Creation Quality and Brand" embedding high-quality the responsibility and compassion of a central SOE.development into our organizational DNA. Through grassroots Actively participating in the capital market's "market-

Party building initiatives we deepened the integration of stabilizing initiative" we helped stabilize expectations

Party work with business operations turning political and and safeguarded the shared interests of the enterprise

organizational strengths into competitive advantages. and its shareholders. We cultivated rural revitalization

initiatives receiving the highest "Excellent" rating for

This year we advanced enterprise growth through seven consecutive years in central authorities' targeted

practical actions demonstrating the responsibility of a assistance programs. One case study was included in the

central SOE. Prioritizing national strategies we took the lead Blue Book on Environmental Social and Governance (ESG)

and made significant contributions to major infrastructure of Listed Central State-Owned Enterprises (2025) . We

projects. Landmark projects—including the Shenyang-Baihe recruited 7187 college graduates contributing to national

High-Speed Railway Xi'an-Yan'an High-Speed Railway employment stability. We strengthened specialized

and Chengdu Metro Line 13—were completed and entered emergency rescue teams and responded swiftly to crises

service. The Changtai Yangtze River Bridge now connects including the Dingri Earthquake in Xizang the Myanmar

north and south while Chongqing East Station rises from Earthquake and the Junlian Landslide in Yibin Sichuan.the ground injecting strong momentum into high-quality Through responsibility and perseverance we built lifelines.economic and social development. Breakthroughs on the We carried out public welfare initiatives—including Golden

Xihoumen Bridge and steady progress on the Gaoligongshan Autumn Student Aid Love Blood Donation and Summer

Tunnel laid a solid foundation for building China into a "Little Migratory Birds" programs—turning small acts of

country with strong transport strength. We deepened high- kindness into warm currents and conveying great love

quality Belt and Road cooperation and Chairman Zhao Leji’s through genuine care. We implemented the principle that

inspection of the Hungary-Serbia Railway earned high praise. "lucid waters and lush mountains are invaluable assets"

Landmark projects-such as the Railway from Morebaya Port striving to build green ecological projects. We selected

to Simandou Mining Areay Argentina’s Salar de Mariana 100 green engineering projects and 51 energy-saving and

Lithium Plant and Pakistan’s Gwadar New International low-carbon technologies setting strong examples and

Airport—achieved continuous successes further burnishing contributing to a Beautiful China where humanity and

the "China Construction" brand worldwide. nature coexist harmoniously.This year we pursued reforms to unlock internal dynamism. Looking ahead to 2026 the clarion call for a new journey

We resolutely advanced reform initiatives with dividends has sounded. We will continue to study and implement

continuing to emerge. CREC ranked among the top 30 central General Secretary Xi Jinping’s important instructions on

SOEs in brand-building capability and three subsidiaries central SOE work and the spirit of the Fourth Plenary

were recognized as "benchmarks" or "excellent performers" Session of the 20th CPC Central Committee. Guided by

in SASAC's "Science & Technology Reform" and "Double high-quality Party building we will ensure high-quality

Hundred" Actions. We proactively adapted to market development focus on our core responsibilities boldly

changes deepened reforms of regional headquarters and advance into deeper stages of reform and balance

investment companies optimized resource allocation development with security. Anchored in the corporate

and fully unleashed development vitality. Anchored in the values of "Innovation Quality and Brand" we will strive

strategy of strengthening the enterprise through technology with greater enthusiasm more pragmatic approaches and

we built the "Pioneer Large Model" innovation system and stronger measures to ensure a successful and strong start

implemented eight "AI + Smart Construction" scenarios. to the 15th Five-Year Plan. We are determined to become

Major national equipment—such as the world's largest- a pioneer in advancing Chinese modernization and a

diameter vertical shaft boring machine and the world's first leading enterprise in the high-quality development of the

in-situ variable-diameter shield tunneling machine—rolled off construction industry.

022025 Environmental Social and Governance Report and Sustainability Report

About CREC

Company Profile

China Railway Group Limited (hereinafter referred to as "CREC")

is a super-large enterprise group integrating survey and design

construction and installation industrial manufacturing real

estate development resource utilization financial investment

and other emerging businesses. Headquartered in Beijing China

CREC currently has 60 secondary subsidiaries and over 289250

employees. It operates and implements projects in over 100

countries and regions worldwide.CREC traces its origins to the Engineering Bureau and Design

Bureau of the Ministry of Railways of China established in March

1950. These were later restructured into the Capital Construction

Bureau of the Ministry of Railways. In July 1989 the Ministry of

Railways dissolved the Capital Construction Bureau and officially

established China Railway Engineering Corporation. In September

2000 China Railway Engineering Corporation was separated from

the Ministry of Railways and placed under the management of the

Central Large Enterprise Work Committee. In May 2003 SASAC

assumed the role of investor. In September 2007 China Railway

Engineering Corporation exclusively initiated the establishment of

China Railway Group Limited which was listed on the Shanghai

Performance

Over

289250 employees

Ranked

9th in the Fortune China 500

Ranked

2nd in the ENR Top 250 Global Contractors

03About CREC

Stock Exchange on December 3 2007 and on the Hong Kong Stock

Exchange on December 7 2007. As the controlling shareholder Portion of cumulative railway construction

of CREC China Railway Engineering Corporation completed its participation by CREC in China’s total railway

corporate restructuring on December 28 2017 and was registered mileage

with the industrial and commercial authorities as China Railway

Engineering Group Co. Ltd. Over 2/3

CREC's business scope covers infrastructure sectors including

railways highways municipal works housing construction urban Percentage of electrified railways built by

rail transit water conservancy and hydropower airports ports and CREC in China's electrified railways

docks. The Company has participated in the construction of over

two-thirds of China's total railway mileage built 90% of China's 90%

electrified railways and contributed to approximately one-eighth of

China's total expressway mileage. It has constructed three-fifths of Percentage of China's total expressway

China's urban rail transit projects. mileage constructed by CREC

As one of the world's largest construction contractors CREC has

been ranked among the Fortune Global 500 for 20 consecutive 1/8

years. In 2025 CREC ranked 43rd on the Fortune Global 500 9th on

the Fortune China 500 2nd on the ENR Top 250 Global Contractors Percentage of China's urban rail transit

14th on the ENR Top 250 International Contractors and 30th on the projects constructed by CREC

ENR Top 150 Global Design Firms.Services provided in over One of the World's

100 Largest Construction countries and regions worldwide Engineering Contractors

Ranked Ranked among the Fortune Global 500 for

43rd in the Fortune Global 500 20 Consecutive Years

Ranked Ranked

14th among the Top 250 International 30th in the ENR Top 150 Global Design Firms

Engineering Contractors

042025 Environmental Social and Governance Report and Sustainability Report

CREC 2025

Highlight Performance

Economic

Total assets Operating revenue

RMB 2470.58 billion RMB 1093.49 billion

Amount of newly signed contracts Total profit

RMB 2750.9 billion RMB 33.54 billion

Net profit Total tax payment

RMB 26.347 billion RMB 35.078 billion

Environmental

Total GHG emissions (Scope 1 + Scope 2) GHG emission intensity (Scope 1 + Scope 2)

141540000.1319

tons of CO2 equivalent tons of CO2 equivalent / RMB 10000

Green technology R&D investment Environmental protection investment

RMB 196 million RMB 1938 million

Total energy consumption Water consumption

3944602 371839400 m3

tons of standard coal equivalent

Hazardous waste intensity Recycled water volume

0.018 kg/RMB 10000 148736000 m3

05CREC 2025

Social

Total R&D investment Number of patents held

RMB 22.52 billion 48029 items

Total number of employees Female employees

289250 persons 47780 persons

Total training investment Total number of employees trained

RMB 378.968 million 289250 persons

Total number of suppliers Total investment amount in poverty alleviation

97966 and rural revitalization suppliers

RMB 87.6 million

Governance

Number of Board Meetings held Number of Shareholders' Meetings held

11 times 1 time

Number of directors Number of female directors

7 persons 1 person

Number of employees participating in anti-bribery and anti-corruption training

136216 persons

062025 Environmental Social and Governance Report and Sustainability Report

Awards and Recognition

Ranked 43rd Ranked 9th Ranked 2nd

in the Fortune Global 500 in the Fortune China 500 in the ENR Top 250 Global Contractors

Ranked 14th Ranked 30th Maintained Shanghai Stock

in the ENR Top 150 Global among the ENR Top 150 Global Exchange (SSE) "A" rating

Design Firms Design Firms for 17 consecutive years

Received SSE "A" rating Awarded Best IR Hong Kong Honored as "Best Practice Case

for information disclosure Listed Company by New for Board Office of Listed

for 12 consecutive years Fortune magazine for 7 Companies" by China Association for Public

consecutive years

Companies (CAPCO) for 4 consecutive years

Ranked among the TOP 30 Honored as "Best Practice Case for the Board of

Central SOEs in Brand Building Capability

by the State-owned Assets Supervision Directors of Listed Companies" by China Association for

and Administration Commission of the Public Companies (CAPCO) for 3 consecutive years

State Council (SASAC)

Ranked 47th in the "TOP 100 Chinese Corporate Brand Value" and

19th in the "TOP 60 Central SOEs Brand Value" by the China Association for Quality

Ranked 114th in Brand Finance's "Global 500 Most Valuable Brands" and

23rd in "China 500 Most Valuable Brands"

Listed in CCTV's "Top 100 ESG Pioneers Among Listed Companies"

Listed in CCTV's "Top 100 ESG Pioneers Among Listed Central SOEs"

CSI ESG Rating: AA Wind ESG Rating: BBB MSCI ESG Rating: BB

07ESG governance

ESG Governance

CREC comprehensively integrates ESG concepts into its strategic planning and business operations and continuously

improves the ESG governance mechanism. Through deepening efficient communication with stakeholders CREC

is consistently enhancing the quality and effectiveness of ESG governance and striving to boost high-quality and

sustainable development.ESG Governance Structure

The Company is continuously enhancing its ESG governance by establishing a three-tier framework spanning the Board

Executive Management and Operations. This structure clearly delineates responsibilities and accountabilities across all

levels ensuring efficient management and driving ESG initiatives toward tangible results.CREC ESG Governance Structure

Board of Directors

Governance

Strategy and Investment Committee

Management Party Building Work Department

Headquarters

Subsidiaries

Execution departments

The Board of Directors serving as the highest decision-making body for corporate ESG matters is responsible for:

reviewing ESG strategies and targets; overseeing ESG governance strategies policies and progress toward objectives;

reviewing material ESG topics; assessing and defining ESG-related risks and opportunities; reviewing the annual ESG

report.The Strategy and Investment Committee established under the Board of Directors oversees the formulation of the ESG

governance framework and provides recommendations monitors progress on ESG targets regularly reviews relevant

work reports and reports to the Board.The Party Building Department is responsible for formulating the Company's ESG strategies and targets coordinating and

advancing the implementation of daily ESG management tasks and organizing the preparation of the annual ESG report.Departments at the Company headquarters and affiliated subsidiaries are responsible for the specific execution and

implementation of ESG-related work promoting the achievement of ESG targets.The Company integrates ESG performance into the executive compensation framework with key metrics spanning

technological innovation safety and quality among others. This linkage ensures the effective attainment of sustainable

development goals.

082025 Environmental Social and Governance Report and Sustainability Report

ESG Practices and Initiatives

The Company has systematically built a comprehensive multi-tiered ESG capability framework. By driving internal

upskilling and external expansion in parallel we have solidified the foundation for high-quality ESG development.Internally the Company has developed a diverse and structured ESG training curriculum focusing on core areas such as

ESG principles industry trends regulatory updates peer benchmarks and strategic management. In 2025 we delivered

a specialized information disclosure training program to nearly 700 ESG leads across headquarters and subsidiaries.Delivered via a blended online and offline model this initiative significantly enhanced participants' professional

competence and practical application skills.Externally the Company is actively engaging with the broader ESG ecosystem. We have participated in specialized

training and exchange forums hosted by key regulators and industry bodies—including the Shanghai Stock Exchange

Social Responsibility Bureau of the State-owned Assets Supervision and Administration Commission of the State Council

(SASAC) Beijing Listed Companies Association China Enterprise Reform and Development Society China Association of

Communication Enterprise Management Beijing Institute of Certified Public Accountants—to stay abreast of regulatory

developments and industry trends.Furthermore the Company actively participated in prestigious ESG award programs this year. Recognized for our robust

management and innovative sustainability initiatives we received multiple awards and honors—a testament to the

industry and capital markets' acknowledgment of our ESG performance.Awards and Honors

Listed in CCTV's "Top 100 ESG Pioneers Listed in CCTV's "Top 100 ESG Pioneers

Among Listed Companies" Among Listed Central SOEs"

Listed in CCTV "China ESG Listed

Companies Beijing-Tianjin-Hebei Awarded the Shanghai Securities News 2025

Pioneer Top 50 (2025)" SSE Eagle Golden Quality ESG Award

Awarded Responsibility Cloud's Recognized as "Ernst & Young

"Responsibility Whale Award" for Sustainability Award 2025 Winner for

Overseas ESG Pioneer Outstanding Enterprise"

Awarded the China Communications and The case study—"Efficient Treatment of

Transportation Association's Transportation Shield Muck to Support Zero-Waste City

Enterprise Social Responsibility (ESG) Excellence Construction"—was selected as 2025 ESG

Report with 8 cases rated as Excellent Cases Exemplary Practice by the Ministry of

and 14 cases rated as Outstanding Cases Ecology and Environment.Two cases—"Red Rucheng White Tea Fragrance: Whole-Industry-Chain Support for

the Rucheng White Tea Industry" and "Chongtai Yangtze River Tunnel: Pioneering

Intelligent Tunnel Construction Technology in China"—were selected for inclusion in two

publications by the State-owned Assets Supervision and Administration Commission:

the Blue Book on Environmental Social and Governance (ESG) of Listed Central State-Owned

Enterprises and the "Blue Book on Social Responsibility of Central SOEs (2025)".

09ESG governance

Material Topic Identification

In line with global sustainability trends international ESG standards and regulatory expectations the Company has

systematically identified its key stakeholders' priorities. Taking into account our business development and industry

characteristics we have established the CREC 2025 ESG Materiality List. Through double-materiality assessment

across financial materiality and impact materiality dimensions the priority of topics is determined resulting in the 2025

Materiality Matrix with key responses to relevant issues provided in this Report.Double Materiality Assessment Process

1 Establishment of ESG topics list

In compliance with the Appendix C2 Environmental Social and Governance Reporting Guide of the Listing Rules of The

Stock Exchange of Hong Kong Limited as well as the Guidelines No.14 of Shanghai Stock Exchange for Self-Regulation

of Listed Companies—Sustainability Report (Trial) and the SSE Self-Regulatory Guidelines for Listed Companies No. 4 –

Preparation of Sustainability Reports the Company refined its ESG agenda. By integrating macro policies rating criteria

and industry best practices we prioritized a focused list of 25 core ESG issues across the three pillars of ESG serving as a

strategic roadmap for our future initiatives.

2 Materiality assessment and confirmation

Impact materiality assessment

Through a combination of questionnaire surveys and face-to-face interviews the Company engaged internal

and external stakeholders to systematically assess the impact materiality of each ESG issue. The evaluation was

conducted across four key dimensions: scale scope irremediability and likelihood. The exercise yielded 299 valid

responses. Following comprehensive data analysis the Company reached its final conclusions regarding impact

materiality.Financial materiality assessment

The Company engaged heads of relevant internal departments and external ESG experts to identify the potential

financial impacts of each ESG issue. We focused on four key areas: business operations financial position operating

results and cash flows. By assessing the likelihood and severity of these financial impacts the Company reached its

final financial materiality assessment conclusions.

3 Prioritization of material topics

Based on the materiality assessment results the Company prioritized the topics around the two dimensions of financial

materiality and impact materiality presenting the overall importance priority of each topic in a matrix visualization

format forming the CREC 2025 ESG Materiality Matrix.

102025 Environmental Social and Governance Report and Sustainability Report

CREC 2025 ESG Materiality Matrix

9

1119

13

15

1822

17255

3

6

2710

1412

16

1

4

2420

23

821

Financial materiality

Environmental Social Governance

1 Responding to climate change 10 Rural revitalization & social contributions 22 Anti-commercial bribery and anti-

2 corruptionPollutant emission 11 Science and technology innovation

3 23 Anti-unfair competitionWaste disposal 12 Supply chain management

4 24 ESG governanceEcological and biodiversity 13 Product and service safety and quality

conservation 25 Operating in compliance with laws

14 Data security and customer privacy and regulations

5 Environmental management protection

6 Utilization of energy 15 Employee's rights and interests

7 Utilization of water resources 16 Training and development

8 Circular economy 17 Employee care

9 Green construction 18 Occupational health and safety (OHS)

19 Serving national strategies

20 Overseas development

21 Stakeholder engagement

4 Material topic review and disclosure

The Company has determined that the financially material topics are product and service safety and quality supply chain

management overseas development and responding to climate change. The resulting CREC 2025 ESG Materiality Matrix

has been reviewed and approved by the Board of Directors and is hereby disclosed.

11

Impact materialityESG governance

Stakeholder Communication

The Company has established a structured and multi-channel stakeholder engagement framework. This system enables

us to promptly address the concerns of internal and external stakeholders deepen mutual trust build consensus and

secure broad understanding and support. A dedicated sustainability column has been set up on the official website to

regularly update ESG initiatives practical achievements and benchmark cases establishing an efficient communication

bridge through transparent information dissemination.Stakeholder Expectations & Concerns Engagement & Responses

● Responding to national strategies

● Policy implementation

● Operating in compliance with laws and

● Compliance with laws and regulations

regulations

● Prudent operation

Governments/ ● Promoting economic growth

regulatory authorities Participating in local projects● Supporting local development

● Provision of jobs

● Promoting stable employment

● Enhancing business management

● Sustainable profitability

capabilities

● Standardizing corporate governance

● Optimizing internal compliance management

● Information disclosure standards

Shareholders and system

● Protection of shareholder rights and

investors ● Timely and accurate information disclosureinterests

● Convening shareholders' meetings

● Strengthening product quality control

● Ensuring project quality

● Customer satisfaction surveys

● Responding to customer needs

● Protecting customers' privacy

Customers ● Innovating engineering technologies

● Adhering to innovation-driven approaches

● Standardized and equitable employment

● Protecting legitimate rights and interests

● Improving the salary system

● Salary and benefits guarantees

● Strengthening employee training

● Talent cultivation mechanism

● Unblocking promotion pathways

Employees ● Career advancement and development

● Prioritizing employee health

● Ensuring occupational health and safety

● Safe production environment

● Standardizing procurement management ● Implementing open bidding procedures

● Complying with contractual agreements ● Make timely payments

Suppliers ● Maintaining stable cooperative relationships ● Long-term strategic partners

● Compliance with business ethics ● Upholding honesty and integrity

● Practicing win-win cooperation ● Collaborative negotiations

Partners

● Employee volunteer activities

● Focus community development

● Public welfare and charity activities

● Community philanthropy

Community and public ● Social cause support

● Cooperation and communication ● Seminars

● Industry-academia-research projects ● Academic communication

NGOs

122025 Environmental Social and Governance Report and Sustainability Report

Feature The "Three Transformations"

Forging China's Creation Tempering China's

Quality Elevating China's Brand

On May 10 2014 during an inspection of China Railway Engineering Equipment Group General Secretary Xi Jinping

delivered an important directive: "Promote the transformation from 'Made in China' to 'Created in China' from 'China

Speed' to 'China Quality' and from 'Chinese Products' to 'Chinese Brands'". This has charted the course and provided

fundamental guidance for China's high-quality economic development. In 2017 the State Council designated May 10 as

"China Brand Day".As the birthplace of General Secretary Xi Jinping's important directive on the "Three Transformations" and the origin of

"China Brand Day" CREC has over the past eleven years under the correct leadership of SASAC consistently borne in

mind General Secretary Xi's earnest instructions and transformed the "Three Transformations" directive into tangible

practices driving high-quality development. On May 10 2025 marking the eleventh anniversary of General Secretary

Xi's "Three Transformations" directive CREC unveiled its corporate values—"Creation Quality Brand"—providing a clear

answer to what kind of development the enterprise should achieve and how to realize high-quality growth. This initiative

not only demonstrates CREC's commitment to shouldering the responsibility of advancing the "Three Transformations"

but also galvanizes collective momentum to accelerate the building of a world-class enterprise.CREC consistently focuses on national priorities and corporate capabilities

Driving "Created advancing technological innovation and industrial innovation in a coordinated

in China" Through manner. It promotes both the transformation and upgrading of traditional industries and the growth of strategic emerging industries and future industries

Innovation vigorously develops a modern industrial system accelerates the cultivation and

development of new quality productive forces strives for greater self-reliance

and strength in high-level science and technology further enhances core

functions and competitiveness better leverages the "Three Roles" and aims to

become a "Three Vanguards".Upholding Quality CREC vigorously promotes the spirit of craftsmanship and integrates the value pursuit of “Craftsmanship Quality Meticulous Construction” into the entire

as the Foundation industrial chain including product design technological R&D engineeringto Forge “China construction operation services and other links. It continuously optimizes andQuality” improves the quality of products and services striving to erect a monument for

each project completed and become a model of century-lasting quality.CREC adheres to enhancing brand value as a key approach for value creation.Illuminating "China Centering on the "Belt and Road Initiative" it actively promotes the global

Brand" Through expansion of Chinese technologies standards and solutions striving to

Value Orientation establish China's high-speed railways bridges tunnels electrification systems

and equipment as "National Brand" representing China's image and world-

renowned "Golden Brand".

13Feature: The "Three Transformations": Forging China's Creation Tempering China's Quality Elevating China's Brand

The "Three Transformations"

Dadu River Railway Bridge (Plateau Railway): A New Passage Crossing

Natural Barriers

In May 2025 the steel girder closure of the Dadu River

Railway Bridge constructed by China Railway Major Bridge

Engineering Group was completed. Spanning 1293 meters

in total with a main span of 1060 m and a deck height

of about 385 m above the river surface it is the world’s

longest-span mountain railway suspension bridge and

a landmark project along the plateau railway route.The

project overcame technical and environmental challenges

delivering 9 scientific research programs developing 6

sets of first-of-a-kind equipment forming 20 construction

methods filing 81 patents (38 granted). Adopting steel-

based platforms and garden-style construction sites it

achieves coordinated development between engineering

construction and ecological protection.Chongtai Yangtze River Tunnel: A New Milestone

for Non-stop High-speed Railway Crossing of

the Yangtze River

In 2025 construction of Chongtai Yangtze River Tunnel

undertaken by China Railway Tunnel Group progressed rapidly.As a critical control project of the Shanghai-Nanjing-Hefei

High-speed Railway and a key node on the coastal corridor

of China’s national Eight Vertical and Eight Horizontal high-

speed rail network the tunnel has a total length of 14.25 km

and sets multiple world records: (1) World’s longest single-head

excavation at 11.3255 km; (2) World’s highest design speed

of 350 km/h for underwater tunnels; (3) Deepest Yangtze

River tunnel reaching 89 meters below the riverbed. Upon

completion it will drastically shorten travel times between

coastal cities; the journey from Chongming to Shanghai

Baoshan Station will take only 17 minutes enabling high-speed

trains to cross the Yangtze River without speed reduction.

142025 Environmental Social and Governance Report and Sustainability Report

Xi’an-Yan’an High-Speed Railway: A New Chapter

for the Old Revolutionary Base Areas in Northern

Shaanxi in the High-Speed Rail Era

On December 26 2025 the Xi’an-Yan’an High-Speed

Railway constructed with the participation of CREC was

officially opened to traffic. This milestone marks the entry

of the old revolutionary base areas in Northern Shaanxi into

the high-speed rail era injecting new impetus into the high-

quality economic and social development of the region.

15Feature: The "Three Transformations": Forging China's Creation Tempering China's Quality Elevating China's Brand

Antarctic Research Stations: Writing a New

Chapter in Polar Engineering Construction

S ince 2002 Ch ina Ra i lway

Construction Engineering Group

has dispatched 569 construction

personnel and joined Chinese

Antarctic expeditions 22 times

successfully undertaking key

tasks including maintenance of

the Great Wall Station expansion

and upgrading of Zhongshan

Station the construction of

supporting logistics facilities at

Taishan Station and construction

of Qinling Station continuously

writing new chapters in polar

engineering construction.Feilong Service Area (Nan-Heng

Expressway): A New Model for

Zero-carbon Demonstration

Practicing ful l- l ife-cycle low-carbon

concepts on the Nan-Heng Expressway

China Railway Transport developed the

themed Feilong Service Area with a

comprehensive zero-carbon operation

system. As of the end of 2025 Distributed

photovoltaic installed capacity: 850.81 kW;

Annual power generation: 950000 kWh;

Standard coal saved: 384 tons; Carbon

dioxide emission reduction: 746 tons.Featuring a vintage train-themed national

AAA scenic spot the service area was

included in the Practical Cases of Beautiful

Transportation Development released by

the All-China Environmental Protection

Federation presenting CREC’s innovative

solution for integrated transportation and

tourism development.

162025 Environmental Social and Governance Report and Sustainability Report

Padalarang Shield Machine: A New Monument for

China’s Exported Largest-diameter Shield Tunneling

Machine

On April 16 2025 the Padalarang Shield Machine (CREC No.1459)

— China’s largest-diameter shield tunneling machine exported

overseas developed by China Railway Construction Heavy

Industry — rolled off the production line. With a diameter of 15.7

meters and an overall length of approximately 113 meters it

integrates cutting-edge intelligent technologies and advanced

equipment. Key highlights include: (1) Unmanned high-precision

automatic cutter replacement robots cutting labor costs and

eliminating high-risk operations; (2) Online monitoring systems

for disc cutter wear and grouting rate addressing challenges

in tunneling through complex strata and settlement control;

and (3) Remarkably enhanced intelligence and automation in

construction processes.

17Feature: The "Three Transformations": Forging China's Creation Tempering China's Quality Elevating China's Brand

Hungary-Serbia Railway: A New

Benchmark for Alignment between

Chinese and European Standards

In 2025 construction of the Hungarian section of the

Hungary-Serbia Railway participated by China Railway

No.9 Engineering Group advanced steadily. Stretching

158.6 km with a design speed of 160 km/h the line connects

Budapest and Belgrade forming a golden corridor linking Central

and Eastern Europe. As a pioneering demonstration project aligning

Chinese railway technical standards with EU regulations it facilitates

infrastructure connectivity under the "Belt and Road Initiative".Guinea's Morebaya-Simandou Railway: A New

Benchmark for Chinese Heavy-Haul Railways

Adapted for Overseas Projects

The Morebaya-Simandou Railway is a crucial

supporting project for the large-scale mining of

Guinea's world-class Simandou Iron Ore Deposit

and for integrated sea-rail transport. Starting from

the Port of Morebaya and ending at the Simandou

Mining Area the railway traverses Guinea from west

to east. It passes through 12 prefectures across four

major regions (i.e. Kindia Mamou Faranah and

Kankan) and features 12 stations along the route.The main line spans 551.92 km with an additional

74 km of branch lines. Multiple subsidiaries of

CREC participated in the project's implementation

across the entire industrial chain covering survey

& design construction equipment R&D and

operation & maintenance. The entire railway line

adopts technical standards for Chinese heavy-

haul railway and utilizes a full set of independently

developed Chinese equipment. Tailored to Guinea's

local geological conditions and the demand for high-

volume transport these subsidiaries have created

a heavy-haul rail corridor with an annual transport

capacity of 220 million tons. This project represents

the innovative landing of a full-industry-chain

"Chinese solution" for long-distance heavy-haul

railways abroad serving as a benchmark example

of the coordinated "going global" of China's railway

technology standards equipment and operations.

182025 Environmental Social and Governance Report and Sustainability Report

Changtai Yangtze River Bridge: A New Benchmark for Integrated

Structural Design and Transport Functions

On September 9 2025 the highway

section of Changtai Yangtze River

Bridge — the world’s longest-span

cable-stayed bridge designed and

constructed by CREC — was officially

opened to traffic. As the first multi-

functional Yangtze River crossing

integrating expressways intercity

railways and ordinary highways the

bridge stretches 10.33 km in total

with a combined road-rail segment

of 5299.2 m. Achieving seamless

integration of structural forms and

transport functions it serves as a

vital transportation hub advancing

the integrated development of the

Yangtze River Delta region.

19Feature: The "Three Transformations": Forging China's Creation Tempering China's Quality Elevating China's Brand

As of the end of 2025

2 academicians of the Chinese Academy of Engineering; 2 National Outstanding Engineering Teams; 9

National Engineering Survey and Design Masters; and 12 nationally selected candidates under the Hundred

Thousand and Ten Thousand Talents Project

3 national-level laboratories (engineering research centers) and 1 national–local joint research center

61 provincial and ministerial-level R&D centers (laboratories); 10 postdoctoral research workstations; 21

nationally recognized enterprise technology centers; and 142 provincially and ministerially recognized

enterprise technology centers

132 National Science and Technology Progress and Invention Awards; 45 China Patent Awards; and 48029

national patents held

As of the end of 2025

A winner of a total of 5 China Quality Awards and nomination awards the highest national honor in the

quality field

A winner of 851 national-level quality engineering awards (including 46 National Quality Engineering Gold

Awards 253 Luban Prizes and 552 National Quality Engineering Awards)

As of the end of 2025

CREC was listed on the “2025 Top 100 Chinese Corporate Brand Value List” with a brand value of RMB

143.247 billion ranking 3rd in the construction industry 19th among central state-owned enterprises and

47th among Chinese enterprisesThe Hungary-Serbia Railway (an international project) was selected as one of the “2025 (8th) Cases ofChinese Enterprises’ International Image Building” by China International Communications Group

CREC won a total of 8 ITA Tunnelling Awards from the International Tunnelling and Underground Space

Association 1 Special International Honor Award from the International Federation of Municipal Engineering

1 International Project Management Silver Award and 1 International Engineering Project Excellence Award

202025 Environmental Social and Governance Report and Sustainability Report

Standardizing Corporate Governance

The Company adheres to the principle of "Two Unwavering Commitments". We strictly comply with laws and regulations

such as the Company Law of the People's Republic of China and the Securities Law of the People's Republic of China as

well as the regulatory rules of the Shanghai Stock Exchange and the Hong Kong Stock Exchange. We fully implement the

deployment requirements of the State-owned Assets Supervision and Administration Commission of the State Council

(SASAC) regarding deepening reforms and improving governance. Our goal is to promote the continuous standardized

and efficient operation of corporate governance.Corporate Governance Structure

The Company has established a governance structure comprising the Shareholders' Meeting the Board of Directors

and the Executive Management. The BOD fully exercises its role in "setting strategy making decisions and managing

risks". The Executive Management fulfills its role in "planning operations ensuring implementation and strengthening

management". Relying on the specialized operational system of standing committees the Company has built a decision-

making ecosystem characterized by a clear delineation of authority and responsibility as well as scientific and efficient

operations. This provides a solid governance foundation for strategic implementation risk prevention and control and

sustainable development.Strategy and Investment Committee

Shareholders' Meeting

Audit and Risk Management Committee

Board of Directors Remuneration and Assessment Committee

Nomination Committee

Executive Management

Health Safety and Environment (HSE) Committee

CREC's governance structure

Board of Directors (BOD) Operations

The Company focuses on promoting the transformation of the BOD from "tangible management" to "effective

governance". We continuously consolidate the foundation of corporate governance enhance the quality of BOD

construction and effectively fulfill the functions of the BOD.

1 Two Principles to be Consistently Upheld: Upholding the Party’s leadership over state-owned enterprises is a major political principle that must be consistently

followed; establishing a modern enterprise system is the direction of SOE reform which must also be consistently followed.

23Strengthening Foundations Through Excellence in Governance

Case CREC holds BOD construction promotion meetingIn November 2025 CREC held the “BOD ConstructionPromotion Meeting". The meeting comprehensively

deployed the next phase of Board construction

requiring the Board to effectively fulfill its functions

of setting strategy making decisions and preventing

risks implement targeted measures to standardize the

governance of our subsidiaries' BODs strengthen the

development of our external director teams providing

robust governance support for the Company's high-

quality development through the establishment of

high-caliber boards of directors.BOD construction promotion meeting

"Outstanding Board of Directors of Central Enterprises" honor by SASAC

(for 3 consecutive years)

"Best Practice Case of Listed Company Board of Directors" honor by CAPCO

(for 3 consecutive years)

Number of Resolutions and reports Number of Resolutions and reports

meetings held reviewed and approved meetings held reviewed and approved

11times 125 items

Board of Directors Strategy and

9 times 24 items

Investment

Committee

Audit and Risk 6 times itemsManagement 35 Remuneration 8 times 21 items

Committee and Assessment

Committee

Nomination 3 times 4 items Health Safety and Environment 3 times 3 items

Committee (HSE) Committee

242025 Environmental Social and Governance Report and Sustainability Report

BOD Diversity

In accordance with the listing rules and regulatory requirements of Shanghai and Hong Kong the Company has

formulated and implemented the Board Member Diversity Policy. During the director nomination and selection process

comprehensive consideration is given to factors such as gender age educational background and industry experience.This ensures the BOD meets the Company's strategic development needs for diverse skills and experience. As of the end

of 2025 the Company's BOD consisted of 7 directors of which female director accounted for 14%. The seven directors

possess professional knowledge and extensive industry experience relevant to the Company's business development.They cover diverse fields such as corporate management engineering management and financial accounting. They play

a crucial role in enhancing the decision-making efficiency and quality.Directors Number of female directors Number of independent

non-executive directors

7 persons 1 person 3 persons

BOD Independence

The Company strictly selects and appoints independent directors in accordance with the Articles of Association. Both

the number and background of independent directors comply with the regulatory rules of the listing jurisdiction. As

of the end of 2025 the Company had five non-executive directors accounting for more than half of the total Board

members. It also had three independent non-executive directors representing over one-third of the Board. Meanwhile

the Company has established specialized systems such as the Independent Director Management Regulations and the

Working System for Relevant Functional Departments Serving BOD Special Committees. These systems provide solid

institutional support for standardizing corporate governance operations safeguarding the lawful performance of duties

by non-executive directors and fully leveraging their role.BOD Capability Building

Based on the actual operational development needs and leveraging the professional expertise of directors the Company

regularly organizes BOD training research and exchange activities. This continuously strengthens the BOD's performance

capabilities. In 2025 focusing on key areas such as information disclosure market value management public opinion

response and compliance performance the Company arranged for directors to accumulate 31 attendances at thematic

training sessions. At the same time leveraging professional platforms including state-owned asset and securities

regulatory authorities the CAPCO renowned consulting firms and law firms the Company conducted systematic training.Training areas included strategic planning corporate governance macroeconomics the construction industry and anti-

corruption. This continuously enhances the professional competence and performance effectiveness of directors.Stimulate Management Vitality

The Company is deeply advancing the modernization of the state-owned enterprise governance system. We are

effectively transforming institutional strengths into governance efficacy and fully stimulating the internal drive of the

Executive Management to pursue business development. Focusing on institutional integration we closely align with the

Executive Management's functions of "planning operations ensuring implementation and strengthening management"

and optimize the mechanism for the Executive Management to report to the BOD. Focusing on personnel configuration

we have scientifically established the leadership structure fully staffed and strengthened the management team.This ensures members collaborate effectively and fulfill their duties efficiently while executing resolutions exercising

delegated authority and reporting on business operations regularly in accordance with regulations. Focusing on practical

results we have strengthened incentives and accountability to enhance the team's initiative and sense of responsibility.This drives the Company's high-quality development to a new level through high-performance governance.

25Strengthening Foundations Through Excellence in Governance

Safeguarding Shareholders' Equity

The Company strictly implements securities regulatory requirements. In accordance with the In 2025

Articles of Association the Rules of Procedure for Shareholders' Meetings and other relevant

regulations we convene shareholders' meetings in compliance with laws and regulations Number of Shareholders'

standardize procedures for all stages of the meetings and effectively safeguard the equity Meetings held

of minority shareholders.The Company has maintained sound and standardized information disclosure management 1 time

to effectively protect investors' right to know. In 2025 it revised a series of systems including

the Information Disclosure Management Measures the Provisions on the Administration

of Shareholding Changes of Directors and Senior Management and the Detailed Rules for Number of proposals

the Registration of Insiders . The Company has continuously consolidated accountability reviewed and passed

for information disclosure strengthened compliance and risk control throughout the entire

information disclosure process and kept improving the content and forms of information 20 items

disclosure. Adhering to the bottom line of "truthfulness accuracy completeness timeliness

and fairness" the Company has received an A rating in the Shanghai Stock Exchange’s

information disclosure assessment for 12 consecutive years. Meanwhile the Company has

further improved its investor communication mechanism and enhanced interaction through

multiple channels such as performance briefings and investor exchange meetings to respond

to investor concerns in a timely manner. In 2025 the Company held more than 80 seminars

and exchange meetings for domestic and overseas investors and 4 performance briefings

and disclosed 346 various announcements and circulars.The Company has always regarded market value management as a long-term strategic management practice to

enhance investment value and shareholder return capacity. It has advanced market value management in a standardized

and orderly manner by systematically strengthening internal management mechanisms and adopting a comprehensive

set of approaches. In 2025 the Company conducted seminars and special research on market value management for

its listed controlled companies. Focusing on institutional innovation pragmatic planning systematic promotion and

upgraded assessment the Company has built a long-term mechanism for market value management. It formulated the

market value management system issued the valuation enhancement plan released the market value management

scheme and improved the detailed assessment rules for market value management. Centered on institutional innovation

pragmatic planning systematic promotion and upgraded assessment the Company has promoted market value

management in a standardized regular and precise manner. In addition the Company completed the 2024 annual

dividend distribution and launched the 2025 interim dividend distribution for the first time. It steadily implemented the

plan to repurchase some A-share shares of the Company with RMB 800 million to RMB 1.6 billion as well as the plan to

increase holdings of CRCC Industry shares with RMB 160 million to RMB 300 million. These efforts facilitated the effective

implementation of the Action Plan for Quality Improvement Efficiency Enhancement and Emphasis on Returns and the

Valuation Enhancement Plan promoted the balanced improvement of the Company’s intrinsic value and market value

and actively safeguarded the legitimate rights and interests of shareholders and the long-term sustainable development

of the Company.CREC's 2024 annual general meeting of shareholders the first A-share category shareholders' meeting of

2025 and the first H-share category shareholders' meeting of 2025

262025 Environmental Social and Governance Report and Sustainability Report

Case Conducting a joint reverse roadshow on "Intelligent Construction +

Emerging Businesses"

From November 20 to 21 2025 CREC successfully held a joint reverse roadshow on "Intelligent Construction

+ Emerging Businesses" in Chengdu. This was done with its listed subsidiaries China Railway Hi-Tech

Industry Co. Ltd. and China Railway High Speed Electrification Equipment Corporation Limited. The event

attracted more than 30 investment institutions to participate in. Through on-site visits and discussions

it demonstrates CREC's core competitiveness in fields such as intelligent construction and high-end

equipment manufacturing and builds a bridge for market value management and communication with the

capital market.Joint reverse roadshow on "Intelligent Construction + Emerging Businesses"

"Class A" for information disclosure by the Shanghai Stock Exchange for the 2024-2025

fiscal year (for 12 consecutive years)

"Best IR Hong Kong-Listed Company" by New Fortune

"Tianma Award for Investor Relations Management of Listed

Companies" by Securities Times

"Best Practice in Investor Relations Management for Listed

Companies" honor by CAPCO

CAPCO's "2025 Outstanding Practice Cases for Earnings Briefings"

27Strengthening Foundations Through Excellence in Governance

Comprehensively Deepening Reforms

The Company fully implements the guiding principles of the Third and Fourth Plenary Sessions of the 20th Central

Committee of the Communist Party of China deeply carries out the campaign to deepen and upgrade the reform of state-

owned enterprises addresses development challenges enhances development vitality and strengthens development

advantages through reform and strives to build a new type of modern state-owned enterprise that is innovation-leading

functionally distinctive efficiently governed and full of vitality.Highlight Data

The Action Plan for Deepening and Enhancing Reforms was successfully concluded with all 426 main

tasks fully completed. Reform tasks at second-tier units totaling 7379 were also fully completed.An "A" rating was received in the SASAC' assessment of key tasks for the Deepening and Enhancement

of Reform in Central Enterprises moving up 14 places compared to the previous year.The "Three Systems" reform has been rated "Grade 1" by SASAC for two consecutive years.The study "Research on Pathways for Central Enterprises to Deepen Penetrative Supervision" was

awarded the First Prize in the "2025 Outstanding Achievements in the Reform and Development of

Chinese Enterprises" by the China Enterprise Reform and Development Society.Deepening "Three Systems" Reform

Adhering to a grassroots-oriented and performance-oriented approach we implemented the integrated requirements

of "standardization preferential treatment and incentives" strengthened the linkage between total payroll and

economic performance and optimized the assessment system of "one sector one policy; one enterprise one policy". We

comprehensively standardized the term system and contractual management of the Executive Management members. A

total of 3497 executive management members signed annual and term responsibility letters.China Railway No.2 Engineering Group special meeting on incentive mechanism construction and cadre talent work

282025 Environmental Social and Governance Report and Sustainability Report

Building Core Competitive Entities

The Company has thoroughly implemented the strategy of "Supporting the Outstanding and Strengthening the Strong"

fully advancing the development of "flagship enterprises" "specialized refined distinctive and innovative enterprises"

and "key third-tier companies". By strengthening resource allocation and innovating institutional mechanisms we have

comprehensively stimulated development momentum. At the same time we have resolutely phased out outdated

production capacity intensified efforts to turn losses into profits and address financial deficits and implemented

categorized measures with targeted efforts effectively improving development quality.Top 20 China Railway Third-Level Engineering Companies

1 China Railway Construction China Railway Electrification Engineering Group Fourth 2 Engineering Group First

Construction Co. Ltd. Engineering Co. Ltd.

3 China Railway No.4 Engineering 4 China Railway No.4 Engineering

Group Seventh Engineering Branch Group Fourth Engineering Co. Ltd.China Railway Construction

5 China Railway No.4 Engineering 6 Engineering Group Co. Ltd. North

Group First Engineering Co. Ltd.China Branch

7 China Railway No.4 Engineering 8 China Railway No.4 Engineering

Group Municipal Engineering Branch Group Fourth Engineering Co. Ltd.

9 China Railway Construction China Railway No.4 Engineering 10 Engineering Group Second

Group Eighth Engineering Branch

Construction Co. Ltd.

11 China Railway No.4 Engineering Group 12 China Railway First Group Xinyun

Construction Engineering Co. Ltd. Engineering Co. Ltd.

13 China Railway Construction Engineering 14 China Railway Tunnel Group No. 2

Group Co. Ltd. Shenzhen Branch Co. Ltd.

15 China Railway No.3 Engineering 16 Zhengzhou Engineering Co. Ltd. of Group Construction and Installation

China Railway Seventh Group

Engineering Co. Ltd.

17 China Railway Electrification Overseas Company of China Railway 18 Engineering Group Beijing

Seventh Group

Electrification Engineering Co Ltd.

19 China Railway First Group Electrical 20 China Railway No.5 Engineering

Engineering Co. Ltd. Group Second Engineering Co. Ltd.

29Strengthening Foundations Through Excellence in Governance

Strengthening Comprehensive Business Management

The Company has continued to implement the "Three-Year

Action Plan for Further Enhancing Comprehensive Business

Management and Reducing Debt". We are deeply advancing

the "Four Integrations" of finance commerce legal affairs

and procurement. This means the deep integration of financial

centralization commercial refinement legal risk control and

systematic procurement. Financial centralization management

has been fully rolled out. To date over 1200 financial centers

have been established serving nearly 20000 accounting

units. The treasury system has achieved interconnectivity with

legal affairs engineering management and other systems.The supply chain system continues to be optimized. The

cooperative model and support mechanisms for centralized

material procurement are constantly improved. The proportion Finals of the CREC Youth Comprehensive Business Management

of centralized procurement for steel and cement by two-tier Business Integration Competition and the 4th Youth Innovation and

material and trade enterprises has steadily increased. Efficiency Improvement Competition

Lawful and Compliant Operations

CREC rigorously implements all directives and requirements set forth by the State-owned Assets Supervision and Administration

Commission of the State Council (SASAC) regarding the development of law-based central enterprises. We strive for world-class

excellence in corporate legal management by continuously strengthening our corporate governance structure enhancing our

lawful and compliant operations and fostering a robust corporate legal culture.Internal Control and Compliance

The Company continuously reinforces its internal control and compliance

management fully leveraging the coordination role of the Leadership Group

for Rule of Law the Compliance Committee and the Major Operational Risk

Management and Control Committee. By advancing the development of legal

affairs compliance internal control and risk management the Company

provides a solid organizational and institutional safeguard for the Company's

lawful and compliant operations.The Company formulated and implemented the Plan on the Division of Annual

Key Tasks for the Development of the Internal Control System and Supervision

focusing on important areas key business activities and core positions.This plan further clarifies internal control and supervision responsibilities

and promotes the deep integration of internal control requirements into the CREC Legal and Compliance Training Session

entire business process ensuring that all control measures are effectively

implemented and form a closed-loop management system.Adhering to the principle of "business-oriented targeted education" we closely In 2025

align training with compliance risk points across various business areas and the

specific demands of each position. We regularly conduct specialized training

on system management and compliance management in order to cultivate cumulative number of participants in

a highly skilled and professional legal talent pool. This effort injects solid special legal compliance training: over

professional momentum into the Company's high-quality development.The Company actively cultivates a legal culture through meticulously organized 56900 persons

campaigns including the "Eighth Five-Year Plan for Legal Awareness" and "Civil

Code Publicity Month" integrating the principles of law-based governance into

daily management.

302025 Environmental Social and Governance Report and Sustainability Report

Risk Management

The Company rigorously implements the risk prevention and control

requirements of SASAC. It standardizes the entire process of risk identification

investigation and response focusing on establishing a long-term mechanism for

risk management and resolutely strengthen the defense line against risks.In 2025 the Company formulated and issued specialized management systems

for asset transactions and post-investment evaluations enhancing the risk

prevention and control system in key areas and strengthening its risk response

capabilities. It refined the risk identification assessment and dynamic monitoring

mechanisms and conducted in-depth analysis on five major operational risks:

real estate investment cash flow infrastructure investment international

operations and debt. Through dynamic monitoring risk alerts and closed-loop

management the Company achieved early identification early warning and

early resolution of risks ensuring the stable operation of the enterprise.CREC maintains stringent oversight of overseas operational risks by deepening

specialized governance and intensifying supervision of key international projects

and major risks. In August 2025 the Company conducted special inspections

across six critical projects in three countries to identify and rectify potential risks.At the same time the Company bolstered its overseas risk management talent

pool. Through regular targeted training initiatives we consistently elevate our

professional capacity to identify and mitigate risks in international operations.Information Security and Privacy

Protection

In strict compliance with Cybersecurity Law of the People's Republic of China

Data Security Law of the People's Republic of China and Personal Information

Protection Law of the People's Republic of China the Company prioritizes both

data protection and rational utilization. We continually refine our data asset

management framework and cybersecurity systems through internal regulations

such as the CREC Data Asset Management Regulations and CREC Network &

Information Security Management Regulations thereby establishing a robust

framework for data security and customer privacy protection while ensuring

secure efficient and stable operation of information systems.Data security and privacy protection across

the full lifecycle

The Company has established a data security control mechanism covering

the entire process of information collection storage transmission use and

destruction. The Company continuously strengthens the compliance of

information collection authorization the safety of data storage encryption the

security of transmission channels and the integrity of destruction processes

with special protection measures implemented for sensitive personal information

such as names ID numbers and mobile phone numbers. In 2025 the Company

conducted in-depth specialized investigations into data leakage risks focusing

on high-risk areas comprehensively enhancing the security defense level of

business data and personal information. In parallel the Company reinforces

endpoint security protection through the coordinated deployment of antivirus

software strengthening this critical front-line defense.

31Strengthening Foundations Through Excellence in Governance

Verifying whether Comprehensive testing

embedded SDKs improperly of the authentication

retain user privacy or and authorization

business-sensitive data mechanisms of business

system API interfaces

Data

leakage risk

investigation

Systematically screening

Verifying whether high-risk vulnerabilities

encryption storage such as unauthorized

requirements are strictly access and privilege

implemented during data escalation that may cause

storage and transmission. bulk data leaks

Integrated domestic-international security system development

To ensure efficient stable and secure cross-border data transmission the Company systematically advances the

development of an internal network transmission system for cross-border data. This includes coordinating the deployment

of core application systems network upgrades and renovations and full-link security enhancements. These efforts

have established a comprehensive data security and trade secret protection framework covering both domestic and

international operations. This not only provides strong support for the digital development of cross-border businesses but

also serves as a concrete action contributing to the national strategy of the "Belt and Road Initiative".Company-wide cybersecurity awareness and capacity enhancement

The Company places great emphasis on enhancing the information security awareness and practical capabilities of

all employees regularly conducting security awareness education and training. In 2025 we organized a Cybersecurity

Awareness Week campaign under the theme "Cybersecurity for the People Cybersecurity by the People." Adopting

an "online-led offline-coordinated" approach we promoted cybersecurity knowledge through diverse formats such as

knowledge competitions banner campaigns and scenario simulation drills. This reinforced the consensus that "everyone

is responsible for cybersecurity" strengthening the Company's cybersecurity defense.In 2025

there were

0 incidents related to the infringement of

customer privacy and information security

CREC Cybersecurity Awareness Week Activities

322025 Environmental Social and Governance Report and Sustainability Report

Upholding Business Ethics

The Company strictly complies with all applicable domestic and international laws regulations and regulatory

requirements concerning anti-monopoly and anti-unfair competition. We remain firmly committed to lawful and compliant

operations with integrity and we maintain a zero-tolerance policy towards violations of business ethics such as

commercial bribery corruption and unfair competition in order to uphold a fair and orderly market.Anti-Commercial Bribery and Anti-Corruption

We have established a comprehensive "six-in-one" oversight framework integrating Party Committee inspections

Discipline Commission supervision financial monitoring internal audits compliance reviews and employee democratic

oversight. This closed-loop system features clear accountability and efficient operations collectively advancing the long-

term mechanisms of "deterring preventing and eliminating corruption."

Strengthening institutional frameworks

The Company continuously improves its systems and procedures concerning anti-commercial bribery and anti-corruption.We rigorously implement a series of internal regulations including the Implementation Plan for Building an Institutional

Framework That Prevents Misconduct of CREC the Integrity Commitment System for Leading Personnel of China

Railway Group Limited (Trial) the Implementation Measures for Establishing a Comprehensive Oversight Framework for

Conduct Integrity and Anti-Corruption of CREC . These clearly define the ethical standards and codes of conduct for both

the Company's leader and all employees rigorously regulating the exercise of power. In the same time the Company

rigorously investigates and handles cases related to corruption using these cases as a basis to promote reform and

improve governance. This continuous effort fosters a clean and upright business environment.Deepening targeted governance in key areas

For critical domains like engineering projects and bidding processes the Company develops and refines targeted

governance plans ensuring accountability across all levels. By identifying the prominent contradictions and common

problems existing in related fields a list of issues is established. The management weaknesses and institutional gaps are

accurately identified and comprehensive rectification and improvement measures are systematically implemented.In full compliance with SASAC's 2025 Cross-Border Corruption Governance Guidelines the Company organized a

leadership group meeting to report case dispositions and take key initiatives. Focusing on the problem rectification

the Company proactively supervises relevant departments and affiliated entities in the implementation of corrective

measures. Targeted on-site assessments and supervisory reviews have been carried out at overseas projects to

strengthen governance against cross-border corruption and obtain continuous progress in this area.

33Strengthening Foundations Through Excellence in Governance

Strengthening whistleblowing and rights protection mechanisms

CREC has implemented policies including the Implementation Measures for Discipline Inspection Organizations to Handle

Complaints and Reports and to Supervise Case Management and the Implementation Measures for the Complaint

Reporting Responsibility System. These frameworks ensure that reporting channels remain consistently accessible

while all cases are addressed in strict accordance with applicable regulations and disciplinary standards. This approach

ensures the effective exercise of supervisory rights by all employees and stakeholders. All subsidiaries of the Company

have established disciplinary inspection departments to strengthen the management of anti-corruption complaints and

reporting. Strict measures are in place to protect the personal privacy and physical safety of whistleblowers and any

breaches of confidentiality resulting from negligence or misconduct are subject to rigorous accountability and disciplinary action.In 2025 local judicial authorities concluded 15 corruption cases involving management personnel of affiliated enterprises with

the individuals concerned held criminally liable in accordance with the law.Fostering an integrity-driven corporate culture

The Company strengthens its anti-bribery and anti-corruption compliance culture through diverse initiatives. These include

conducting targeted integrity education programs producing educational videos such as Confessions and Warnings and

Straying into Corruption: A Lasting Alarm and establishing integrity education centers. Through these ongoing efforts the

Company fosters a culture where ethical conduct is deeply embedded in organizational values and employee mindset.In 2025 the Company continued to improve its regular and long-term education mechanisms. Party organizations at all

levels carried out 11029 sessions of education on the Party Constitution Party regulations and disciplinary rules and 2447

sessions of warning education reaching over 400000 Party members and cadres. These efforts enhanced all staff’s

awareness of integrity and compliance as well as their professional competence in performing duties.China Railway First Group built the "Breeze Along the Road" Integrity Culture Base in Xi'an to support the development of an

"Integrity-driven CREC"

Anti-Unfair Competition

The Company consistently integrates the principle of fair competition In 2025

throughout its entire production and operational processes resolutely

eliminating monopolistic practices vicious competition rent-

seeking violations and other behaviors that undermine the market the Company had

environment. It effectively transforms compliance requirements into

binding constraints that standardize market conduct. The Company

actively supports the "anti-involution" initiative jointly launched by 0 lawsuits or major administrative penalties

enterprises in the domestic construction industry. We firmly reject arising from unfair competition practices."involution-style" vicious competition and improper project acquisition

through unethical means such as bribery. By consciously upholding

a fair and orderly market competition environment we contribute to

the development of a healthy and sustainable industry ecosystem.

342025 Environmental Social and Governance Report and Sustainability Report

Responding to Climate Change

Guided by the United Nations Framework Convention on Climate Change

(UNFCCC) and the Paris Agreement CREC fully aligns with the decisions and

arrangements of the CPC Central Committee and the State Council on carbon

peaking and carbon neutrality. The Company systematically assesses and

scientifically addresses climate-related risks and opportunities continuously

enhancing its climate resilience. In doing so the Company is committed to

contributing its expertise to drive green and low-carbon development within the

industry and to global climate governance efforts.Governance

The Company fully implements the CREC Guiding Opinions on Accelerating

Green Development and Promoting the Construction of a Beautiful China. It

has established a Leading Group for Climate Change Response and Energy

Conservation & Emission Reduction and developed a collaborative and efficient

working system with clearly defined responsibilities and targets. Through

dedicated initiatives the Company advances key tasks related to the Beautiful

China vision ensuring solid progress and tangible outcomes across all areas.Leading Group for Climate Change Response and Energy

Conservation & Emission Reduction

The Chairman serves as Group Leader the President serves as

Deputy Group Leader the Vice President in charge of energy

conservation and environmental protection serves as Executive

Deputy Group Leader and heads of relevant headquarters

departments serve as members.Office (Department of Safety Quality and Environmental

Supervision)

The head of the Department of Safety Quality Environmental

Protection and Supervision concurrently serves as Director."Dual Carbon" R&D Center and Green/Low-

Carbon Departments & Management

Including the headquarters Infrastructure Research

Institute Planning and Design Institute Construction

Management Centre Product Equipment Centre

Bui ld ing Mater ia ls Technology Centre Urban

Operations Centre and Industrial Development

Centre.CREC climate change governance structure

37Low-Carbon Practices for Lucid Waters and Lush Mountains

中国中铁气候变化治理架构

● Responsible for organising leading and coordinating the Company’s climate change energy conservation and

emission reduction-related work

● Responsible for formulating the Company’s climate change energy conservation and emission reduction work

plans and overall deployment

● Responsible for reviewing major matters related to climate change energy conservation and emission

reduction

● Responsible for assessing climate change energy conservation and emission reduction-related work

commending advanced collectives and individuals and holding accountable major violations

● Responsible for the daily organization coordination and implementation of the Leading Group for Climate

Change Response and Energy Conservation & Emission Reduction

● Provide professional support to the Leading Group for policy research technological breakthroughs and

achievement transformation

382025 Environmental Social and Governance Report and Sustainability Report

Strategy

The Company closely monitors national policy trends related to its dual-carbon goals and climate change. It actively

tracks extreme weather events in its operating areas and routinely identifies climate-related risks and opportunities

through industry benchmarking and consultations with internal and external experts. Based on these assessments the

Company systematically evaluates potential impacts on its business model and value chain developing forward-looking

response measures. At the same time it rigorously implements the Carbon Peaking Action Plan of China Railway Group

Limited setting binding targets and strengthening statistical monitoring and evaluation of energy conservation and

environmental protection efforts with clear rewards and penalties. Through strict supervision at all levels the Company

ensures responsibilities are fulfilled and results are achieved driving the execution of its climate strategy and advancing

its green and low-carbon transition.Climate change risk identification results

Risk category Risk factor Risk description Impact on business model Impact on value chain Expected impact Potential financial timeframe impact Response measures

Increased frequency and severity of ● Construction material transportation Establish extreme weather early ●

extreme weather events (e.g. typhoons disruptions and supply chain delays warning mechanisms

●●

Acute risk extreme precipitation blizzards) may lead Project schedule delays and ● to construction site shutdowns temporary increased contract default risks Reduced subcontractor performance

Short to medium Revenues and Enhance investment in on-site disaster

capacity term costs prevention facilitiesfacility damage equipment failure ●

Heightened post-disaster restoration costs Procure construction all risks insurance casualties and project delays ● and business interruption insurance

● Conduct climate resilience design

assessments

Altered rainfall patterns and extreme climate ● Shortened construction windows ● Rising costs for foundation treatment ● Strengthen pre-project climate risk Physical risk variations such as prolonged droughts for plateau western and

coastal projects slope support and related processesChronic risk frequent regional floods and permafrost Medium to long

surveys

Costs

● Long-term precipitation increases landslide term ● Expand business areas such as urban degradation impact construction conditions ● Increased difficulty in foundation risks on slopes regeneration focusing on "ecological and geological stability construction in certain regions restoration and urban repair" sponge

city development and comprehensive

coastal zone management.● Establish corporate-level carbon

● emission monitoring platforms

Carbon pricing increases mandatory carbon Traditional high-energy- ● Real-time carbon emission monitoring

Policy and quota allocation stricter green building consumption construction required during construction processes Implement green construction

regulatory risks standards and inclusion of construction models face constraints while Medium term Costs standards

carbon emissions in regulatory oversight the proportion of green low-

● Carbon footprint assessment must be

integrated at the design stage ● Participate in carbon market pilots carbon projects rises to explore carbon asset operation

methodologies

● Supply chains require simultaneous ● Establish a green construction

upgrades of equipment and materials innovation center

High initial investment in low-carbon ● Increased R&D investment

●●

Technical risk transition technologies and challenges in and equipment renewal Technical personnel need retraining for Short to medium Costs Collaborate with universities on low-

technology adaptation expenditures transition term carbon construction technology R&D

● Prolonged technical validation cycle in the ● Implement demonstration projects to

pre-project phase promote proved technical pathways

Transition risk Implement centralized procurement

● Heightened concentration of upstream and strategic partnerships

Sustained price increases in raw materials ● Increased difficulty in cost material suppliers ●

Market risk due to carbon cost increases resource control Short to medium Costs Increase the proportion of recycled

constraints or green premiums ● Need for enhanced supply capacity of term aggregates and solid waste utilization● Project profit pressure green building materials ● Optimize design to reduce material

consumption

● Publish annual ESG reports

Heightened stakeholder focus on ESG ● ESG rating downgrades may

performance may trigger negative public prompt climate-risk-averse Projects require public disclosure of Short to medium Financing Establish robust ESG performance ● Reputation risk sentiment impacting corporate image and investors to reduce or withdraw environmental performance data term opportunities evaluation systems

financing capacity investments ● Enhance communication with media

and communities

39Low-Carbon Practices for Lucid Waters and Lush Mountains

Identification of climate risks and opportunities

Guided by Part D of the HKEX ESG Reporting Guide and the Implementation Guidance for Climate-related Disclosures

the Company applies scenario analysis over short- medium- and long-term timeframes. To systematically identify

climate-related risks and opportunities it assesses factors including their probability duration of impact and financial

significance ensuring alignment with its core business operations and development.Risk category Risk factor Risk description Impact on business model Impact on value chain Expected impact Potential financial timeframe impact Response measures

Increased frequency and severity of ● ● Construction material transportation Establish extreme weather early

extreme weather events (e.g. typhoons disruptions and supply chain delays warning mechanisms

Acute risk extreme precipitation blizzards) may lead

● Project schedule delays and ●

to construction site shutdowns temporary increased contract default risks Reduced subcontractor performance

Short to medium Revenues and Enhance investment in on-site disaster

capacity term costs prevention facilitiesfacility damage equipment failure ●

Heightened post-disaster restoration costs Procure construction all risks insurance casualties and project delays ● and business interruption insurance

● Conduct climate resilience design

assessments

Altered rainfall patterns and extreme climate ● Shortened construction windows Rising costs for foundation treatment ● ● Strengthen pre-project climate risk Physical risk variations such as prolonged droughts for plateau western and

coastal projects slope support and related processes

surveys

Chronic risk frequent regional floods and permafrost Medium to long Costs

● Long-term precipitation increases landslide term ● Expand business areas such as urban degradation impact construction conditions ● Increased difficulty in foundation risks on slopes regeneration focusing on "ecological and geological stability construction in certain regions restoration and urban repair" sponge

city development and comprehensive

coastal zone management.● Establish corporate-level carbon

● emission monitoring platforms

Carbon pricing increases mandatory carbon Traditional high-energy- ● Real-time carbon emission monitoring

Policy and quota allocation stricter green building consumption construction required during construction processes Implement green construction

regulatory risks standards and inclusion of construction models face constraints while Medium term Costs standards● Carbon footprint assessment must be

carbon emissions in regulatory oversight the proportion of green low- integrated at the design stage ● Participate in carbon market pilots carbon projects rises to explore carbon asset operation

methodologies

● Supply chains require simultaneous ● Establish a green construction

upgrades of equipment and materials innovation center

High initial investment in low-carbon ● Increased R&D investment

●●

Technical risk transition technologies and challenges in and equipment renewal Technical personnel need retraining for Short to medium Costs Collaborate with universities on low-

technology adaptation expenditures transition term carbon construction technology R&D

● Prolonged technical validation cycle in the ● Implement demonstration projects to

pre-project phase promote proved technical pathways

Transition risk Implement centralized procurement

● Heightened concentration of upstream and strategic partnerships

Sustained price increases in raw materials ● Increased difficulty in cost

Market risk due to carbon cost increases resource control

material suppliers Short to medium ● Costs Increase the proportion of recycled

constraints or green premiums ● Need for enhanced supply capacity of term aggregates and solid waste utilization● Project profit pressure green building materials ● Optimize design to reduce material

consumption

● Publish annual ESG reports

Heightened stakeholder focus on ESG ● ESG rating downgrades may

Reputation risk performance may trigger negative public prompt climate-risk-averse

● Projects require public disclosure of Short to medium Financing Establish robust ESG performance

sentiment impacting corporate image and investors to reduce or withdraw environmental performance data term opportunities evaluation systems

financing capacity investments ● Enhance communication with media

and communities

402025 Environmental Social and Governance Report and Sustainability Report

Climate change opportunity identification results

Opportunity Climate-related Impact on Expected Potential

type opportunities business model impact financial Response measurestimeframe impact

● Establish a construction

Recycling and reuse waste classification

of construction Promote green and resource recovery

waste (e.g. construction and Short to Costs & system

concrete steel circular economy medium term expenditures

reinforcement models ● Promote recycled

excavated soil) aggregate applications

in key projects

Resource

efficiency

Implement

standardized and

Adopt higher- industrialized ● Develop a digital project

efficiency construction to management platform

production shorten project Short to medium term Costs ● Advance integrated processes (e.g. BIM timelines "design-construction-

collaboration) reduce energy manufacturing" models

consumption and

labor dependency

Utilize low-

carbon energy Promote green ● Adopt photovoltaic

sources (e.g. on- construction site microgrids

site photovoltaic development ● Procure electric

power supply and establish Medium term Costs equipment and

electric construction low-carbon participating in fossil-

Energy sources machinery pilot benchmark to-electric conversion

hydrogen energy projects demonstration projects

equipment)

Enter new markets Expand high- ● Undertake projects such

(e.g. green value-added as national ecological

infrastructure business domains demonstration zones

near-zero carbon and transition Short to sponge cities and

parks ecological from traditional medium term Revenues wetland restoration

restoration projects construction to ● Advance R&D and

Market climate-resilient city "green solution application of innovative

initiatives) provider" building materials

Participate in

renewable energy ● Serve the construction

projects and Expand of national clean energy

implement energy- renewable energy bases

saving measures engineering ● Build an industry-leading

(e.g. construct wind business Short to Revenues integrated service power photovoltaic segments medium term provider for offshore

Resilience and energy to enhance wind power construction

storage power corporate carbon and a specialized

stations establish performance marine equipment

green offices and manufacturer

production bases)

41Low-Carbon Practices for Lucid Waters and Lush Mountains

Financial impact analysis of climate risks and opportunities

The Company routinely monitors and assesses the potential chain-wide impacts of extreme

weather events on production and operations. Through measures such as enhancing

meteorological warning mechanisms conducting emergency drills for extreme weather and

optimizing construction organization plans the Company has comprehensively improved

its capabilities in responding to and managing climate-related physical risks. Preventive

expenditures related to on-site protection and equipment reinforcement are properly

accounted for in corresponding project management costs. During the reporting period the

Physical Company did not experience any major work stoppages asset impairment losses or other

risks incidents caused by extreme weather events. The related risks do not have a material impact

on the Company's financial data for the current or next reporting period. In the medium to

long term to address persistent physical risks arising from rising global average temperatures

the Company will steadily increase investments in protective upgrades and operational

maintenance for key production facilities and core operational processes.The Company is steadily advancing the green transformation and upgrade of low-carbon

construction. In 2025 specialized investments focused on areas such as high-energy-efficiency

equipment renewal & replacement pilot promotion of electric construction machinery large-

scale application of low-carbon concrete and construction of intelligent carbon emission

monitoring systems. Related expenditures are properly recorded in corresponding project

operating costs and have not adversely affected the Company's overall operating performance.Transition In the medium to long term the Company will continue to increase capital investments in

risks the research and application of low-carbon construction techniques green upgrades of core

equipment and innovation in low-carbon products and services steadily hedging against

potential risks related to the low-carbon transition.The Company deeply leverages major development opportunities brought by global low-

carbon transition and China's dual-carbon strategy. On one hand it continuously enhances

construction productivity and resource recycling levels through large-scale promotion of green

businesses such as prefabricated buildings construction waste recycling and renewable

energy infrastructure development thereby expanding growth space for green businesses.On the other hand by popularizing energy-efficient equipment and piloting distributed

Climate

opportunities photovoltaic power supply at construction sites the Company effectively reduces energy

consumption and operational costs. These initiatives not only help control long-term operating

expenditures but also drive growth in green orders solidifying the Company's sustainable

competitive advantages.

422025 Environmental Social and Governance Report and Sustainability Report

Strategy and measures

The Company has established a robust climate risk emergency management system by formulating and issuing the

Emergency Response Plan for Safety Quality Ecological Environment and Disaster Accidents (Incidents). This plan

provides comprehensive guidelines for the entire process of hazard identification risk assessment prevention and

early warning emergency response post-incident management support mechanisms and training exercises related to

climate-induced disasters and ecological risks. It establishes a closed-loop management mechanism for extreme weather

and climate disaster response significantly enhancing the Company's capabilities in climate risk emergency handling

and resilience-based prevention and control. At the same time the Company actively expands climate-resilient green

business sectors such as ecological restoration and urban regeneration ("dual urban renewal") sponge city development

and comprehensive coastal zone management. Leveraging core engineering capabilities it empowers cities and regions

to enhance climate adaptation capacities proactively addressing prominent environmental challenges including urban

flooding ecological degradation and coastal erosion induced by climate change. While strengthening ecological security

barriers the Company continuously broadens growth pathways for green and low-carbon businesses.The Company continuously improves its top-level design and institutional framework for green and low-carbon

development. It has formulated and issued the CREC Guidelines on Accelerating Green Development to Promote the

Construction of a Beautiful China the CREC Carbon Peaking Action Plan the Energy Conservation and Emissions

Reduction Supervision and Management Measures and the 14th Five-Year Plan for Energy Conservation and Emissions

Reduction. These documents systematically deploy green and low-carbon development pathways focusing on core

business scenarios while synergistically utilizing green financial instruments coordinating key initiatives including efficient

resource recycling clean energy substitution and operational energy efficiency improvement.The Company has fully implemented the "Energy Conservation and Ecological Environmental Protection Statistical

System" (MRV System) which integrates core functions such as energy conservation environmental protection and low-

carbon reporting green development evaluation and report management. For the first time this system enables direct

online reporting from hundreds of tier-3 subsidiaries. Utilizing this system the Company achieves online aggregation

intelligent analysis dynamic monitoring and trend forecasting for energy consumption and carbon emission data. This

substantially improves data completeness timeliness and accuracy effectively advancing the Company's energy and

carbon management toward a fully digitalized process characterized by "monitorability traceability and assessability".The Company continuously strengthens the development of green and low-carbon talent teams and enhances company-

wide capabilities. It regularly conducts specialized training on environmental protection and low-carbon operations

consistently reinforcing green development awareness across all employees and improving professional competencies

throughout the environmental and low-carbon work chain. In low-carbon technology innovation the Company leverages

the CREC Infrastructure Green and Low-Carbon Research Center platform to conduct in-depth fundamental research

on carbon accounting methodologies and low-carbon transition technological pathways. It continuously refines green

construction standards and comprehensively strengthens whole-life-cycle energy conservation and carbon reduction

assessment and control capabilities for engineering projects providing solid technical support for the Company's high-

quality green and low-carbon development.Case Establishing an "Accounting -Evaluation" System for Carbon Emissions from

Metro Construction to Facilitate Green Transformation and Upgrading

China Railway (Shanghai) Investment conducted research on an "accounting -evaluation" system for carbon

emissions to address the high energy consumption in metro construction. Through policy analysis and field

surveys covering diverse conditions and construction techniques the project team accurately identified major

emission sources and established a carbon emission factor database for metro construction an accounting

model and an evaluation index system enabling precise carbon measurement and tiered management of

carbon emissions. After the implementation of this system individual projects are projected to reduce carbon

emissions by over 15% significantly enhancing green construction standards.

43Low-Carbon Practices for Lucid Waters and Lush Mountains

Case "Zero Emissions + Intelligent Driving": Electric Flatbed Trucks of China

Railway First Group Co. Ltd. (CRFG) Empower Green Metro Construction

To tackle the high energy consumption and emissions in metro tunnel construction CRFG independently

developed intelligent electric flatbed vehicles for transportation. Utilizing lithium iron phosphate batteries

and a 48V low-voltage power supply system the vehicles achieve zero exhaust emissions and low-noise

operation fundamentally improving the tunnel construction environment. Featuring dual battery packs and

an intelligent power management system the vehicles achieve a comprehensive energy saving rate of 26%.The integrated PLC intelligent control technology enables real-time operational monitoring and automatic

fault alerts effectively enhancing equipment reliability and construction efficiency. The equipment has

been deployed at scale in metro projects across Nanjing Suzhou Shanghai and other cities supporting the

construction of over 300 kilometers of track beds while reducing CO2 emissions by approximately 900 tons.comprehensive energy saving supporting the construction while reducing CO2 emissions

rate of of over by approximately

26% 300 kilometers of 900 tons

track beds

Case Green Finance Empowerment: Leveraging Low-Carbon Technology

Innovation to Unlock New International Project Opportunities

The Company actively explores synergies between green finance and low-carbon technologies using green

credit instruments to empower energy-saving and low-carbon technology innovation. Through the Green

and Low-Carbon Infrastructure Research Center of CREC the Company conducted in-depth exchanges

with Asian Development Bank (ADB) and Azerbaijan Railways regarding the electrification project of

Bilajari-Yalama and Baku–Boyuk Kesik railways systematically showcasing CREC's technical expertise and

engineering experience in railway electrification and energy-efficient as well as low-carbon construction.The project actively sought a special green and low-carbon loan from Asian Development Bank. Guided

by internationally recognized green finance standards the project aimed to precisely align low-carbon

technological solutions with financing mechanisms. This cooperation strengthened the Company's

green and low-carbon information disclosure while enhancing sustainable competitiveness in line with

international standards.

442025 Environmental Social and Governance Report and Sustainability Report

Risk and Opportunity Management

The Company continuously monitors the impact of climate change on operations integrating climate-related

risks into its risk management framework.Climate risk and opportunity management process:

Based on identification results comprehensive assessments of climate-related risks

Prioritization and opportunities are conducted across two dimensions: "likelihood of occurrence" and

of risks and "potential impact on operations finances and strategy". Taking into account industry

opportunities characteristics and project type variations and supplemented by external expert input

risks and opportunities are categorized and prioritized to define key focus areas.Building on prioritization results the Company evaluates the adaptability of existing strategies

Climate and business models under various climate scenarios identifying critical vulnerabilities

resilience and growth potential. By incorporating climate change factors into medium-to-long-term

assessment development planning the Company dynamically adjusts business development layouts

and project management models continuously enhancing corporate climate resilience.Identification of For high-priority risks and opportunities qualitative assessment and quantitative analysis

financial impacts are conducted to evaluate potential financial impacts under different time horizons with

of material risks particular focus on critical financial matters such as major project budgets and insurance

and opportunities expenditures thereby providing data-driven decision support.Development and Based on assessment results differentiated response strategies and action plans are

implementation of

response strategies formulated integrating relevant measures into the entire project lifecycle management

and measures from preliminary planning to design construction operation and maintenance.

45Low-Carbon Practices for Lucid Waters and Lush Mountains

Indicators and Targets

The Company fully implements the national dual-carbon strategy by conducting comprehensive carbon inventories

through a combination of sampling audits and self-reported data from business units. Based on these findings we

continuously strengthen our energy conservation and emission reduction management system by setting scientific

quantitative indicators phased targets and clear pathways for carbon reduction.Short-term targets (by 2026) Medium-term targets (by 2027)

Achieve a 3.9% reduction in CO2 emission intensity Each year the Company se lects 100 green

by 2026 compared to the 2025 baseline. construction technology demonstration projects to

promote the research development and application

of energy-saving and low-carbon technologies

es tab l i sh ing rep l i cab le emiss ion reduct ion

models. The Company fully implements a "dual-

control" mechanism for total carbon emissions

and emission intensity incorporating carbon

management indicators into corporate performance

evaluation systems. This approach drives the deep

integration and coordinated advancement of green

transformation and high-quality development.In 2025 the Company's CO2 emissions per RMB 10000 of revenue (at comparable prices) were 0.13 tons of CO2

equivalent a decrease of 5.2% compared to the previous year. Compared with the “14th Five-Year Plan” baseline of 0.16

tonnes of CO?e per RMB 10000 of revenue the cumulative reduction reached 18.2%. The annual reduction rate exceeded

SASAC's 2025 target of 3.89% CO2 emission reduction for central enterprises. The cumulative reduction rate significantly

surpassed SASAC's "14th Five-Year Plan" overall target of 18% CO2 emission reduction for central SOEs demonstrating

remarkable achievements in green and low-carbon development.Indicator 2025 Unit

Total GHG emissions (Scope 1 + Scope 2) 14154000 tons of CO2 equivalent

Scope 1 GHG emissions 6120704 tons of CO2 equivalent

Scope 2 GHG emissions 8033268 tons of CO2 equivalent

Investment in GHG reduction funds 661.50 million RMB

The Company continues to enhance the Scope 3 GHG accounting monitoring and management system progressively

integrating it into the overall GHG emissions management framework. Given the extensive upstream and downstream

chains and broad coverage of engineering projects complete statistical conditions are currently unavailable for certain

Scope 3 categories. After comprehensive assessment and in accordance with the relevant exemption clauses of the

HKEX's ESG Reporting Guide Scope 3 GHG emissions data will not be disclosed for the 2025 reporting period. The

Company will steadily advance related statistical accounting and disclosure efforts in subsequent phases.

462025 Environmental Social and Governance Report and Sustainability Report

Strengthening Environmental Management

CREC actively implements the green development philosophy and has established a comprehensive environmental

management system that spans all organizational levels the entire value chain and the full lifecycle of its

operations. The Company reinforces closed-loop management of environmental risks and integrates ecological and

environmental protection requirements throughout all aspects of its production operations and project development

processes. Through systematic green management measures the Company has achieved a synergistic balance

between high-quality development and ecological conservation.Environmental Management System

The Company strictly complies with applicable laws and regulations including the Environmental Protection Law of the People's

Republic of China and the Regulations on the Administration of Environmental Protection for Construction Projects . It has established

an environmental management system covering the entire lifecycle from project planning and design to construction and operation

and maintenance while implementing a management system characterized by centralized leadership tiered accountability full

employee participation and closed-loop control. The Company has developed a robust ecological and environmental monitoring and

supervision system conducting systematic identification of environmental factors and risk assessments for its on-going construction

projects and operational sites. It strengthens the pollution control in all stages of production and operations and incorporates the

compliant discharge targets for both hazardous and non-hazardous waste into its routine management. In addition the Company has

established and continuously improved the environmental performance evaluation reward and accountability mechanism mandating

that environmental performance be rigorously incorporated into project performance assessments and that the environmental

responsibility be implemented at all levels. The Company has obtained ISO 14001 Environmental Management System certification with

eight subsidiaries recognized as national-level Green Factories. In 2025 the Company's environmental protection investment reached

RMB 1.938 billion demonstrating strong and effective environmental management performance.Environmental Risk Management

The Company consistently adheres to the principles of "giving priority to prevention while combining prevention with treatment and

source management" and has established a comprehensive environmental risk management system that spans the entire business

chain and full project lifecycle to proactively prevent and effectively respond to various ecological and environmental risk incidents. The

Company strictly implements the environmental impact assessment system for construction projects ensuring rigorous environmental

compliance review prior to project commencement. It continuously improves a normalized closed-loop mechanism for identifying and

remediating ecological and environmental risks strengthening risk prevention and control at an early stage. The Company reinforces

the responsibility for ecological and environmental risk management at all levels and systematically identifies environmentally sensitive

factors in project regions and river basins. It places particular focus on the seven major river systems including the Yangtze River

and the Yellow River strengthening targeted environmental risk prevention and control in key areas such as wastewater treatment

industrial production and non-coal mining operations. The Company has established a comprehensive emergency response system

for environmental incidents covering typical scenarios such as major pollution source leaks hazardous waste disposal accidents and

water contamination events. The system clearly defines the emergency organizational structure response procedures information

reporting mechanisms and resource assurance measures forming a full-process closed-loop emergency response framework. The

Company regularly organizes specialized environmental emergency drills and skills training programs continuously enhancing frontline

personnel's capabilities for risk identification and practical emergency response.During the reporting period the Company did not experience any environmental emergencies did not incur any significant

administrative penalties from environmental authorities for environmental violations and was not subject to any related criminal

liability. Overall environmental risk remained under control.Case Identifying Root Causes of Hazards and Strengthening Environmental Safeguards

For its National Highway 109 New Line Expressway Project China Railway Investment Group advanced its efforts in

environmental safety hazard identification and control established a closed-loop mechanism of "identification-filing-

correction-closure and implemented the system of patrol inspection and hazard identification for key positions. Runoff

collection systems emergency containment ponds and crash barriers were installed in ecologically sensitive waterway

sections supported by dynamic monitoring through the control center. An emergency response system led by the GeneralManager was established forming a full-process risk control model of “front-loaded hazard identification follow-upengineering controls and underpinning emergency preparedness.”

47Low-Carbon Practices for Lucid Waters and Lush Mountains

Case Establishing a Tiered Response Mechanism to Comprehensively Enhance

Response Capabilities for Environmental Emergencies

China Railway No.2 Engineering Group has formulated and issued the Comprehensive Emergency Response Plan

for Safety Quality Ecological Environment and Disaster Incidents (Events) to ensure the standardize and efficient

handling of safety quality environmental and disaster-related emergencies and to enhance overall emergency

response capability in line with corporate and project conditions. The Company systematically conducts ecological

and environmental risk analysis and assessment clearly defining core principles and operational requirements

for emergency management. At the same time the Company has established dedicated emergency response

organizational structures clarifying responsibilities across all levels and positions and reinforcing accountability for

emergency management. On this basis it has scientifically defined graded emergency response levels standardize

full-process response procedures detailed requirements for emergency handling and post-incident recovery and

comprehensively strengthened emergency support measures ensuring closed-loop efficient operation across the

entire emergency response chain.Environmental Training and Awareness Promotion

The Company has established a comprehensive multi-tiered and normalized training and awareness promotion system for

ecological and environmental protection covering the personnel at all levels including management and frontline personnel.With a focus on key topics such as environmental laws and regulations energy conservation and carbon reduction expertise

and advanced green construction technologies the Company regularly organizes specialized training programs and policy

communication activities to comprehensively enhance employees' professional capabilities and performance in fulfilling

environmental responsibilities. Aligning with key events such as the National Energy Conservation Publicity Week and National

Low-Carbon Day all affiliated units widely promote the green development philosophy to foster deep-rooted awareness of

environmental protection and low-carbon development through a variety of online and offline approaches including thematic

training sessions knowledge competitions thematic awareness campaigns signing initiatives and low-carbon experience

activities.Environmental Awareness Campaign of China

Railway No. 9 Group through Training Sessions

and Promotional Posters

China Railway First Group launched the publicity campaign

themed "Energy Conservation & Efficiency Enhancement

Innovation-led Renewal".

482025 Environmental Social and Governance Report and Sustainability Report

Reducing Pollutant Emissions

CREC strictly complies with national laws and regulations including the Air Pollution Prevention and Control Law the Law

on the Prevention and Control of Water Pollution and the Law on the Prevention and Control of Environmental Pollution

by Solid Waste. The Company has issued the Special Action Plan for Environmental Protection Enhancement Inspection

and Rectification of CREC along with a series of dedicated institutional documents covering construction dust control and

construction waste disposal continuously improving its full-process pollution discharge management system. To reduce

the release of major pollutants such as exhaust gas wastewater solid waste and noise the Company has optimized

its technical pathways strengthened the operation of facilities and promoted green construction projects as part of its

efforts to reduce the environmental impact of its production and operations.Air Emissions Management

The Company's air emissions primarily come from construction and production activities including boiler combustion

steel structure processing sandblasting and grinding and coating and spraying operations. The main pollutants involved

include particulate matter (smoke dust) nitrogen oxides (NOx) and volatile organic compounds (VOCs).The Company adheres to the principles of "source reduction process control and end-of-pipe treatment" and

systematically advances the comprehensive treatment of air emissions. At the source control stage measures such as

optimizing the capacity structure and implementing low-NOx retrofits for gas-fired boilers are adopted to effectively

reduce carbon dioxide and nitrogen oxide emissions. For particulate matter (smoke and dust) measures including

covering water spraying installation of dust removal equipment and enclosed operations are implemented to effectively

reduce dust generated during transportation storage construction and production processes. For VOCs management

the Company installs activated carbon systems and paint mist filtration systems on production lines to continuously

improve VOCs collection and treatment efficiency thereby effectively reducing air emissions.In 2025

Air emissions Sulfur dioxide (SO2) emissions Nitrogen oxide (NOX) emissions

51.56 tons 0.55 tons 5.33 tons

Volatile organic compound (VOCs) emissions Particulate matter (smoke and dust) emissions

11.66 tons 34.01 tons

49Low-Carbon Practices for Lucid Waters and Lush Mountains

Welding fume purifiers are installed during the rebar cage welding and fabrication

processes of Xiong'an-Shangqiu High-Speed Railway project of China Railway Sixth Group

Case Full-chain Control from Source to End: China Railway Tunnel Group

Achieves Coordinated Reduction of Exhaust Emissions and Dust

China Railway Tunnel Group continued to reduce

exhaust emissions from construction machinery by

phasing out outdated high-energy-consumption

equipment and enhancing maintenance to optimize

engine performance thereby reducing emissions at

source. For dust control it extensively implemented

comprehensive measures including fully enclosed

mixing stations welding fume purifiers intelligent mist

cannons and enclosure spray systems effectively

suppressing dust from construction. Notably the Significant Reduction of Particulate Matter

prevention system that integrates "spraying + sprinkling Concentration at the Boundary by China Railway

Tunnel Group through an Intelligent Mist Cannon

+ vehicle washing" was applied to multiple projects

reducing the average particulate matter concentration

at the boundaries by approximately 65% significantly

improving regional air quality.

502025 Environmental Social and Governance Report and Sustainability Report

Wastewater Management

The Company strictly implements a full-process control mechanism characterizedby “rainwater and wastewater diversion clean and contaminated streamseparation classified collection graded treatment and recycling” integrating Wastewater discharge

wastewater management throughout the entire construction and production

process. Construction sites are fully equipped with tertiary sedimentation systems 82432600

ensuring that production wastewater is treated to meet the discharge standards

or is recycled for reuse. For specialized scenarios such as tunnel construction the tons

Company innovatively applies advanced technologies including tunnel wastewater

treatment and reuse equipment significantly improving the water recycling

efficiency and reducing the total wastewater discharge.Zero Discharge of Production and Curing Wastewater: Lixian Beam Yard

Case of China Railway No. 3 Engineering Group Establishes Water Resource

Recycling System

Shixiong Railway Lixian Beam Yard of China Railway No. 3 Engineering Group innovatively implemented an

integrated water resource recycling system featuring "source collection - process treatment - intelligent

reuse". By constructing a comprehensive drainage network a wastewater treatment station a multi-

stage sedimentation and water storage facility and an intelligent spray system for curing it achieved

zero discharge of production and curing wastewater. Through automated separation of sand from gravel

wastewater purification and rainwater recovery treated water quality meets curing requirements

achieving over 95% water resource reuse rate. In 2025 245 beam casting units were completed saving

approximately 21000 cubic meters of groundwater through the beam curing process alone while reducing

water material and labor costs delivering significant economic and environmental benefits.Water resource reuse rate over

95%

Lixian Beam Yard of China Railway No. 3 Engineering Group

China Railway Tunnel Group's closed-loop management system for tunnel

excavation wastewater "collection - treatment - testing - reuse"

51Low-Carbon Practices for Lucid Waters and Lush Mountains

Waste Management

The Company adheres to the principles of "reduction resource utilization and harmless treatment" comprehensively

strengthening full-process management of construction waste.Includes waste concrete steel offcuts and excavated rock spoil. The Company reduces

waste generation by optimizing construction planning promoting prefabricated construction

and enhancing on-site waste classification and collection while actively advancing resource

utilization. For example Class III surrounding rock spoil is crushed and screened for reuse as

subgrade fill or concrete aggregates; scrap steel is centrally collected and reprocessed into

structural reinforcement for small components; and concrete debris is reused as base material

Non-hazardous for site hardening.waste

Includes waste engine oil used paint containers waste batteries and waste catalysts. The

Company strictly complies with the Standard for Pollution Control on Hazardous Waste

Storage. Dedicated temporary storage facilities for hazardous waste are established with

clear labeling and record-keeping systems in place. All hazardous waste is entrusted to

licensed professional entities for transfer and disposal and an electronic receipt system is

Hazardous implemented to ensure full traceability and closed-loop management.waste

Hazardous waste

emissions intensity disposal rate

1888 tons 0.018 kg/RMB 10000 100%

non-hazardous waste

emissions intensity disposal rate

4857700 tons 0.044 ton/ RMB 10000 100%

Case "Big Capacity Processor" of China Railway Hi-Tech Industry Corporation

Limited Solves Shield Muck Disposal Challenge

The Integrated Engineering Muck Eco-processing System

of China Railway Hi-Tech Industry Corporation Limited

processes up to 1200 m3 of shield muck per day on the

average. Through processes including continuous belt

conveyor transportation multi-stage screening high-

pressure spraying sand washing cyclones and filter

press dewatering muck is efficiently separated with

840 m3 of coarse medium and fine sand aggregates

and 360 m3 of dewatered mud cakes produced. The

sand aggregates are used for concrete mixing and shield Integrated Engineering Muck Eco-Processing System of China Railway Hi-Tech Industry Corporation Limited

grouting while the mud cakes can be processed into non-

fired bricks with a resource utilization rate of over 70%

and waste transformed into valuable resources.

522025 Environmental Social and Governance Report and Sustainability Report

Noise Management

The Company strictly implements the Emission Standard of Environment Noise for Boundary of Construction Site and

integrates noise control into its green construction management system. It adopts a four-pronged approach incorporating

"technical noise reduction layout optimization time-based control and monitoring with early warning" to effectively

minimize noise impacts during construction activities.Case Electric Girder Crane of China Railway No. 10 Engineering Group Makes

Beam Lifting "Efficient and Quiet"

The MDEL200 electric-drive tire-type girder crane was introduced for the dedicated Line Project of Ningbo

Hub Meishan Railway of China Railway No. 10 Engineering Group. With a total power of 200 kW and

energy transfer efficiency of 85% the equipment saves 10%-30% energy compared to traditional hydraulic

drive equipment while controlling operational noise below 85 decibels effectively improving the acoustic

environment during construction. The equipment featuring pure electric drive enables zero emissions

and no oil leakage significantly improving energy utilization efficiency and the environment at the site

providing strong support for green and intelligent construction.Operational noise controlled below 85 decibels

China Railway No.4 Engineering Group equips

workers with noise-reducing earplugs

53Low-Carbon Practices for Lucid Waters and Lush Mountains

Optimizing Resource Utilization

CREC integrates the principles of conservation intensive use and green and low carbon philosophies into the full process

of production operations and project construction systematically promoting the efficient use and recycling of energy

water and materials thereby reinforcing the foundation for green development.Energy Management

The Company thoroughly implements the Regulations on Supervision and Management of Ecological Environment

Protection and Energy Conservation adhering to a systematic digital and precise management philosophy to

continuously advance energy conservation and carbon emission reduction and improve the efficiency of energy

utilization. In fields of engineering projects and transportation infrastructure the Company actively promotes the

adoption of renewable and clean energy technologies such as photovoltaic wind power and air-source heat pumps

facilitating the implementation of low-carbon transportation and infrastructure projects. With source control as the core

the Company accelerates the phase-out of high-energy-consuming and outdated electromechanical equipment through

equipment upgrades and technological innovations. Priority is given to procuring energy-efficient construction machinery

and office facilities that meet the national energy efficiency standards and renewable energy engineering equipment is

extensively used to reduce the energy consumption intensity from the outset.Total energy consumption Energy intensity Gasoline consumption

3944602 0.036 tons/RMB 10000 443736 tons

tons of standard coal

Diesel consumption Coal consumption Natural gas consumption

1329860 tons 116060 tons 64930000 m3

Heat consumption Electricity consumption Electricity intensity

45590 GJ 9578.41 GWh 87.56 kWh/RMB 10000

Renewable energy consumption Solar energy Purchased green electricity

355014106504248510

tons of standard coal tons of standard coal tons of standard coal

Energy consumption target for 2026

2.9% reduction in energy intensity (at comparable prices) from 2025

542025 Environmental Social and Governance Report and Sustainability Report

Case Photovoltaic Power Generation at Tunnels — Exploring a New Green Energy

Path for Transportation Infrastructure

China Railway Investment Group promoted the photovoltaic power generation project at the tunnels on

the Huanren-Ji'an Expressway and Yanji-Changchun (Puchang Section). In the project the central isolation

belts at tunnel entrances and exits and highway green belts are utilized with photovoltaic modules

installed at 27 tunnel substations. A "PV power generation + DC power distribution" mode is adopted and

the generated electricity is directly connected to the tunnel lighting DC power supply system for immediate

use with the proportion of surplus electricity fed into the grid strictly controlled below 20%. A total of 2713.15

kW of PV capacity was installed along the entire section with an average annual power generation of

approximately 2.903 million kWh. The project is expected to save 1161.2 tons of standard coal annually

reduce CO2 emissions by 2894.2 tons a year and cut electricity costs by RMB 1033300 per year. This

project provides a replicable practical model for promoting renewable energy and building a low-carbon

transportation system in the transportation infrastructure sector.Photovoltaic Power Generation Project for Huanren-

Ji'an Expressway and Yanji-Changchun Expressway

55Low-Carbon Practices for Lucid Waters and Lush Mountains

Water Resource Management

The Company strictly implements the requirements of the Statistical Report for Energy Conservation and

Ecological Environment Protection of Central State-Owned Enterprises issued by SASAC. It has established a

comprehensive water resource statistics and monitoring system to standardize water usage and consumption

accounting and strengthen the consistency and accuracy of data management.The company is committed to continuously reducing water consumption in construction. In practical

construction operations the Company actively implements water-saving measures widely adopting water-

efficient automatic sprinkler systems multi-stage sedimentation tanks and recycled water recovery facilities.These measures help the Company achieve efficient reuse of construction wastewater in processes such

as concrete curing vehicle washing and site dust suppression significantly improving the water recycling

efficiency. Treated reclaimed water is prioritized in each project to minimize the consumption of fresh water.In 2025 the Company's water for construction projects is primarily sourced from municipal water supply with

stable water quality and quantity. Applicable water sources were adequately guaranteed and no difficulties

in water access were reported.Water consumption Water intensity

371839400 m3 3.40 m3/RMB 10000

Recycled water volume

148736000 m3

Case Intelligent Atomized Curing Device of China Railway No. 2 Engineering Group

The Beam Yard of China Railway No. 2 Engineering Group

innovatively developed an intelligent curing device for

box girder webs which atomizes water into 50-100μm

particles through high-pressure atomization technology.Featuring a profiling spray structure the device allows

full-coverage low-evaporation precision curing. The

device is equipped with a water storage tank and a

circulating water replenishment system reducing water

conveyance losses and achieving a 34.8% reduction in

water consumption per curing cycle. Recycled water

is used for non-production purposes like site dust

Intelligent Atomized Curing Device

suppression realizing cascaded use and promoting the

transformation of railway precast component curing

towards green efficient and fine practices.

562025 Environmental Social and Governance Report and Sustainability Report

Circular Economy

The Company deeply integrates the concept of circular economy into its entire business chain and adheres

to the full-process management principle of source reduction process control and end-of-pipe recycling.Through green construction and prefabrication technologies waste generation is minimized at the source

while idle resources and construction solid waste are increasingly recovered and reused to comprehensively

enhance the resource utilization efficiency and maximize the synergistic benefits of energy conservation

reduced resource consumption pollution reduction and carbon emission mitigation.Case Shield Tunneling Machine Remanufacturing - Building a New Model for

Circular Utilization of High-End Equipment

Through China Railway Engineering Services Co. Ltd. CREC has established four major shield tunneling

machine remanufacturing bases in Qingyuan (Guangdong) Deyang Yixing and Xinxiang. It has built a

circular chain featuring "product application remanufacturing and reapplication". Waste shield tunneling

machines/TBMs undergo cutter head repair main drive upgrading as well as diameter expansion or

reduction modification to cater to the needs of new projects. Over the past four years a total of 290 shield

remanufacturing operations have been completed covering more than 40 cities across China with over 3000

cutters repaired with a single maintenance of key components can save tens of thousands of yuan in costs.In 2025 CREC's case titled Developing Shield Tunneling Machine Remanufacturing to Realize the Circular

Reuse of Old Shield Tunneling Machines and Implement the Concept of Green Development was included in

the 2025 Compilation of Excellent Sustainable Development Practices of Central State-Owned Enterprises

issued by the State-owned Assets Supervision and Administration Commission of the State Council (SASAC).It serves as a practical benchmark for the green transformation of high-end equipment.The Company has Remanufacturing Covering more than

5 shield machine 290 units completed in the 40 cities across China

remanufacturing bases past four years

Case Luban Platform Builds a Closed-loop Model of "Lease & Reuse + Idle &

Waste Disposal" to Promote Circular Utilization of Materials

The China Railway Procurement E-commerce Platform (Luban Platform) focuses on the circular economy

by establishing two digital platforms: a leasing service platform and a surplus and obsolete materials

trading platform addressing bottlenecks in internal material circulation. Since its launch various units

have cumulatively issued over 600 internal leasing requests and completed more than 20000 transactions

for the disposal of surplus and obsolete materials enabling efficient reuse of idle resources and reducing

inventory backlog and duplicate procurement. The two platforms operate in synergy to form a closed-loop

model of “leasing and reuse + surplus and obsolete material disposal” achieving full lifecycle management

of resources. Through platform-based operations the Company has significantly reduced material waste

and lowered procurement and disposal costs.

57Low-Carbon Practices for Lucid Waters and Lush Mountains

Green Office

The Company actively promotes low-carbon energy-efficient and green office work systematically implementing

technological upgrades and management optimization such as intelligent lighting control real-time energy monitoring

and renewable energy applications. Paperless meeting systems are widely adopted effectively supporting the dual goals

of reducing energy consumption and carbon emissions while enhancing the management efficiency.Case CREC Headquarters Taps into Energy-saving Potential Through Digital and

Intelligent Technologies

CREC Headquarters has vigorously advanced systematic energy-saving upgrading:

Strengthening routine energy management

● By adopting fine management measures such as time-based temperature control for air conditioners

enforcing the "lights off when leaving" rule and promoting smart energy-saving sockets the

Headquarters has effectively reduced energy consumption for daily operations.Upgrading intelligent lighting systems

● The office buildings are fully equipped with the NiCS intelligent lighting system featuring high-

efficiency LED light sources and sensors to enable automatic and intelligent lighting control greatly

cutting energy use for lighting.Building a smart energy supervision system

● Supported by the energy management platform real-time metering and data analysis are carried out

for key energy-consuming areas including overall electricity consumption air conditioning systems and

data centers so as to tap into potential for energy conservation and carbon reduction.Promoting the application of renewable energy

● Green energy such as solar power has been introduced to supply clean electricity for daily building

operations.Through a series of technical transformations and management optimizations the Company achieved a

year-on-year decrease by approximately 10% in annual energy consumption saving RMB 800000 in energy

costs and setting a headquarters-level green building benchmark.Case Smart Water Conservation Practices of CREC Headquarters

CREC Headquarters continues to advance fine water resource management. An intelligent irrigation system

has been introduced to automatically adjust irrigation time and frequency according to weather conditions

and plant water requirements enabling remote and smart control of landscape irrigation. Equipped with

concealed micro-sprinklers arranged among plants the precision sprinkler irrigation system reduces water

consumption by more than 30% compared with traditional methods. A rainwater harvesting system has

been built to collect rainwater from flower boxes flower beds and reservoirs which is reused for cleaning

exterior walls and fences as well as landscape irrigation. Reclaimed water is widely used for toilet flushing

and plant maintenance. Through the coordinated operation of energy-saving equipment and intelligent

systems the average monthly water saved during the peak period of usage of reclaimed water ranges from

80 to 230 tons.

582025 Environmental Social and Governance Report and Sustainability Report

Promoting Green Construction

Aligning with the goal of low-carbon transformation of transportation infrastructure CREC embeds the green construction

principle into the entire project lifecycle and systematically advances the green and intelligent upgrades of engineering

projects. By promoting clean energy low-carbon technologies and energy-saving equipment the Company deepens the

deployment of renewable energy infrastructure and establishes benchmarks for low-carbon construction leveraging

breakthroughs in key technologies such as smart construction and resource recycling in major projects. The Company

also emphasizes evaluation-driven construction and the demonstration and guidance roles of projects. In 2025 100 green

model projects and 51 energy-saving and low-carbon technologies were recognized with multiple projects achieving

industry awards for green construction collectively enhancing the green construction capabilities of the entire system.Green Design

The Company consistently adheres to a source-oriented design philosophy of "prioritizing green development and

advancing low-carbon transition" driving its transition toward green intelligent and high-quality development. With its

core objectives centered on resource conservation and intensive utilization environmental friendliness and intelligent

efficient operations the Company has systematically advanced its innovation in green design. Leveraging its science

and technology innovation system the Company carries out coordinated technological breakthroughs across the entire

value chain with a focus on key areas such as intelligent surveying green planning and design integrated utilization of

renewable energy and smart operation and maintenance. It aims to establish a green construction technology system

and standards framework covering the full lifecycle of "R&D - design - construction - operation and maintenance"

thus empowering lifecycle green and low-carbon management through upstream design innovation and driving the

coordinated green transformation upstream and downstream the industry chain.Case CREC Establishes a Green and Low-Carbon Research Center to

Build a Source of Green Infrastructure Technologies

CREC has set up the Research Center for Green and Low-Carbon Infrastructure developing one of China's

first pioneering bases for original green and low-carbon technologies. Working in synergy with national

key laboratories such as the Intelligent and Green Bridge Construction Laboratory and the Tunnel Boring

Machine and Intelligent Maintenance Laboratory the Center has built a national-level green and low-

carbon innovation platform covering basic research technological breakthroughs and achievement

transformation. Throughout the year the Company held hundreds of seminars special training sessions

and other events on green and low-carbon development. It entered into strategic cooperation with a

number of top research institutions and universities to accelerate the research and industrial application of

green technologies fostering an open collaborative innovation ecosystem where industry academia and

research are deeply integrated.Technical Seminar on Green and Low-Carbon Development of Infrastructure held by CREC

59Low-Carbon Practices for Lucid Waters and Lush Mountains

Municipal Environmental Construction Co. Ltd. of CREC Innovates

Case Corrugated Steel Support Technology to Advance the Implementation of

Green Design

Municipal Environmental Construction Co. Ltd. of CREC a subsidiary of China Tiegong Investment &

Construction Group Co. Ltd. has developed an innovative construction technology for shafts with

corrugated steel support plates addressing the drawbacks of traditional concrete shafts such as

long construction cycles and high resource consumption. This technology adopts prefabricated arched

corrugated steel support plates and H-shaped steel reinforcing rings and applies a prefabricated top-down

construction method enabling materials to be disassembled and recycled. Compared with conventional

processes it eliminates procedures including steel bar binding and formwork erection shortening

the construction period by approximately 60%. As extensive concrete pouring is unnecessary during

construction raw material costs have been reduced by around 65%. Except for the bottom supports all

other components are reusable substantially improving resource utilization efficiency and cutting overall

costs by up to 70% delivering both optimized green design and enhanced economic benefits.Construction period shortened by Raw material costs reduced by Overall costs cut by

approximately approximately up to

60%65%70%

Case Low-Carbon Technologies Empower Green Development of Railway Stations

China Railway Eryuan focuses on the railway station building sector leveraging advanced technologies

such as big data and artificial intelligence to transform the full lifecycle of design construction and

operations. Through multi-dimensional innovations in smart energy digital operation and maintenance

intelligent facilities and green construction the Company injects technological momentum into railway

stations building a new ecosystem that is safe efficient green and comfortable.Planning and Design Drawing of Kunming West Railway Station by China Railway Eryuan Engineering Group

602025 Environmental Social and Governance Report and Sustainability Report

Green Construction

Guided by the principles of "resource conservation environmental friendliness safety and efficiency and low-carbon

intelligence" the Company independently develops its core green construction technologies and integrates the

requirements for green and low carbon development in the entire construction process. It comprehensively promotes

green construction coordinates its efforts in energy conservation and carbon reduction pollution prevention and control

and resource recycling and has developed a number of benchmark green projects in the industry facilitating the large-

scale application of green construction technologies.Case Chongqing East Railway Station: China’s First Demonstration Project

Integrating Station City and Landscape

The Chongqing East Railway Station project constructed by China

Railway is the nation’s first demonstration project integrating

“station city and landscape” and a key node in Chongqing’s “mi-shaped” high-speed rail network. It adheres to the highest three-

star green building standard to implement green construction

practices. The project adopts ETFE double-layer single-cavity

skylights achieving high levels of natural daylighting while

reducing roof self-weight and lowering structural energy

consumption. The waiting hall features an integrated island-type

air-conditioning system—the first of its kind in railway station

buildings in Southwest China—providing 360-degree air supply and

reducing cooling energy loss by more than 20% compared with Exterior View of Chongqing East

conventional systems. Combined with scenario-based intelligent Railway Station

lighting systems for precise light control and supported by smart

construction site management the project advances lean low-

carbon construction establishing a benchmark green and low-

carbon transport hub.Case An Innovative Energy Recovery Device Helps China Railway Shanghai

Group Co. Ltd. Build a Green and Low-Carbon Demonstration Project

Constructed by China Railway Shanghai Group Co. Ltd. the Wanhua Chemical (Penglai) Seawater

Desalination Project has adopted an innovative energy recovery device to recycle surplus energy from the

discharged water of the reverse osmosis system reducing energy consumption for the system. The project

utilizes circulating cooling seawater from a neighboring power plant minimizing the impact of water intake

on marine ecosystems. The first-phase project has a daily freshwater production capacity of 100000 tons

saving more than 36 million tons of freshwater resources annually effectively alleviating regional water

shortages. The project was recognized by the China Association of Environmental Protection Industry as a

“Model Project for Ecological and Environmental Protection in 2025” and received multiple provincial-level

environmental protection demonstration honors. It has set an industry benchmark for the integration of

industrial wastewater resource utilization and green construction.Seawater Desalination Project

61Low-Carbon Practices for Lucid Waters and Lush Mountains

A 125-km Green Corridor: The Huizhou-Qingyuan Section of Shantou-

Case Zhanjiang Expressway Earns International Recognition for Outstanding

Environmental Performance

In 2025 the Huizhou-Qingyuan Section

of the Shantou-Zhanjiang Expressway

constructed with the participation

o f Ch i n a R a i l w a y M a j o r B r i d g e

Engineering Group was awarded the

only global environmental prize at the

IRF Global Road Achievement Awards

(GRAA) 2025 establishing itself as an

international model for green highway

deve lopment . St re tch ing 125 .28

kilometres in length the Huizhou-

Qingyuan Section passes through more

than 60 scenic areas that feature high

ecological sensitivity.Shantou–Zhanjiang Expressway

Case China Railway First Group Co. Ltd. Builds a Benchmark for Green

Construction of Renewable Energy Projects in Sandy Gobi and arid Regions

The 6.1 GW renewable energy project of Huadian located at the northern foot of the Tianshan Mountains

in Xinjiang undertaken by China Railway First Group Co. Ltd. is China's first supporting project for

outbound transmission channels of large-scale renewable energy bases in sandy Gobi and arid regions

including wind power photovoltaic power energy storage and booster station construction. Located in an

ecologically fragile area the project adhered to a green and low-carbon philosophy adopting advanced

technologies such as AI-based UAV inspection photovoltaic cleaning robots and BIM+GIS digital twins

to establish a full-process green construction system and improve resource utilization efficiency. Carbon

footprint was reduced through green electricity procurement achieving synergy between engineering

construction and ecological protection. The project was awarded the Excellent Practice in Green Project

Management by the Project Management Institute (PMI) of the United States. It was also selected into

multiple national innovative cases featuring low-carbon and smart power development setting a green

benchmark for the construction of renewable energy projects in desert areas.

6.1 GW renewable Energy Project of Huadian at the Northern Foot of the Tianshan Mountains in Xinjiang

622025 Environmental Social and Governance Report and Sustainability Report

Protecting Natural Ecosystems

CREC actively implements the green development philosophy and deeply integrates ecological and biodiversity protection

into its corporate strategy and full lifecycle project management to promote the harmonious coexistence between

project construction and natural ecosystems. It has established a closed-loop ecological management system covering

the entire project lifecycle and achieved a 100% pass rate of environmental impact assessment for completed projects

for consecutive years demonstrating notable performance in environmental compliance management. Upholding the

principle of "protection first" the Company rigidly incorporates biodiversity conservation into its full-process project

management to minimize the ecological disturbance from construction activities. It also conducts regular ecological

protection training and publicity programs to build company-wide consensus on ecological conservation and continuously

strengthen ecosystem protection.Pre-Construction Phase Construction Phase Post-Construction Phase

The Company engages The Company continues to increase The Company carries out land

professional institutions to its investment in ecological reclamation and ecological

conduct environmental impact protection adopts environmentally restoration in accordance

assessments and based on the friendly equipment and optimizes with relevant regulations to

assessment results formulates construction processes and effectively reduce ecological

scientifically sound and effective methodologies to minimize the impacts and maximize the

protection plans. It takes measures impacts on water bodies air protection and restoration of

for soil and water conservation quality vegetation and wildlife. the natural environment.biodiversity conservation and For temporary land use it strictly

vegetation protection based prepares and implements land

on coordinated planning and use and reclamation plans with a

implements the requirements for particular focus on strengthening

scientifically justified site selection the protection for environmentally

standardized spoil disposal sensitive areas such as densely

upfront protective measures and populated areas and nature

reutilization of resources. reserves.Case China Railway No. 2 Engineering Group Establishes a Full-Cycle Ecological

Control System to Protect Rare Plateau Species

In its plateau railway projects China Railway No. 2

Engineering Group has built a whole-process management

system covering preliminary assessment construction

control and ecological restoration rigorously implementing

protection measures for wild fauna flora and natural

habitats. For the projects professional ecological protection

teams were established to conduct ecological surveys in

cooperation with local authorities to map the distribution of

rare animals plants and ancient and famous trees. Targeted

plans were formulated featuring labeled management

designated protection zones and optimized access roads

to avoid ecologically sensitive areas. During construction

informational signs were installed and dedicated personnel Wild Flora Protection

arranged for routine patrol and monitoring. Through

scientific site selection preemptive protection ecological

compensation and continuous supervision the projects

achieved coordinated progress between construction and

ecological protection safeguarding regional biodiversity.

63Low-Carbon Practices for Lucid Waters and Lush Mountains

Case Yellow River Mengjin Reconstruction Project: Making Way for Endangered Species

China Railway (Shanghai) Investment implemented stringent

biodiversity protection measures in the reconstruction project of

the G208 Erxi Line in Mengjin. Prior to construction comprehensive

ecological surveys were conducted accurately identifying 22

nationally protected species including the black stork whooper

swan and wild soybean and dedicated protection plans were

developed. During construction strict controls were placed on

work boundaries with measures such as low-noise equipment

suspension of nighttime operations vehicle speed limits and horn

restrictions to minimize ecological disturbance. More than 100

ecological protection signage boards were installed and over 20

company-wide training sessions were conducted. Construction

schedules were dynamically adjusted to avoid peak migration

periods of wintering birds. The project achieved zero casualties Identification of Endangered Flora and

of wildlife with no significant impact on the habitats of rare Fauna at the Project Site

species maintaining stable regional ecological quality and enabling

coordinated development between highway construction along the

Yellow River and ecological protection.Case Yichun Luming Mining Co. Ltd. under China Railway Resources Group

Builds a Green Mine Benchmark

Yichun Luming Mining Co. Ltd. under China Railway Resources Group was included in the provincial-level green

mine catalogue in 2023 and shortlisted for the national recommended list of green mines in 2025. Integrating

smart mine development with the philosophy of green development the Company realized fine resource

management. Intelligent technologies boosted resource utilization efficiency and enhanced environmental

monitoring capacity. By the end of 2025 the Company had covered 76000 cubic meters of soil on waste dumps

and tailings ponds sowed grass across 19.31 hectares and planted 15000 trees. Supported by a monitoring

system the ecological environment within the mining area improved significantly.The Company had covered Sowed grass across Planted

76000 cubic meters of soil 19.31 hectares 15000 trees

on waste dumps and tailings ponds

From Black-Necked Crane Isolation Zones to Native Vegetation Restoration:

Case Multiple Measures Taken by China Railway Seventh Group to Protect the

Fragile Zoigê Ecocystem

The Xicheng Railway project constructed by China Railway Seventh Group is located adjacent to the Zoigê

National Wetland Nature Reserve. Prior to construction comprehensive wildlife surveys were conducted and

isolation zones were established within 500 meters of black-necked crane breeding sites with construction

suspended during breeding periods. Wildlife protection warning signs were installed along the entire line and rareand protected plant species were safeguarded through fencing and transplantation measures. The “three stepsone method” approach was applied to protect alpine meadows achieving a turf stripping and reinstatement

rate of 95%. Native vegetation was used for habitat restoration with over 120000 square meters of habitat

rehabilitated. Batching plants were equipped with wastewater treatment systems enabling 100% wastewater

reuse with zero discharge. Vegetation coverage in restored areas exceeded 85% and the frequency of bird activity

increased significantly effectively protecting the fragile plateau ecosystem.

642025 Environmental Social and Governance Report and Sustainability Report

Serving National Strategies

CREC consistently upholds its responsibility to serve national priorities In 2025

proactively aligning with coordinated regional development strategy major

regional strategies and the functional zoning strategy bravely acting as a

trailblazer in building a transportation power. In 2025 the Dadu River Bridge 2417 construction

on Qinghai-Xizang Railway was successfully closed and multiple high-

speed railways including the Xi'an-Yan'an Guangzhou-Zhanjiang Baotou- projects commenced

Yinchuan Shenyang-Changbaishan and Chongqing-Guiyang High-speed

Railways were successfully completed and opened to traffic. During the

14th Five-Year Plan period the Company completed 6363 km of high-speed 2027 projects

railways and its cumulative participation in high-speed railway construction

reached 22300 km enabling the national operating mileage of high- commenced as scheduled

speed railways to exceed 50000 km. A batch of key projects including the

Changtai Yangtze River Bridge Zhengzhou-Kaifeng Intercity Railway Tianjin

Metro Line 4 and Beijing-Weixian Expressway were completed and put into

operation injecting strong momentum into the continuous improvement of

the national integrated transport network.CREC participated in the construction of the

Shenyang-Changbaishan High-speed Railway

(Shenbai High-speed Railway) building a new

transportation trunk line for the revitalization of

Northeast China.CREC designed and constructed the Guangzhou-

Zhanjiang High-Speed Railway (Guangzhan

HSR) significantly reducing travel time between

the Beibu Gulf Urban Agglomeration and the

Guangdong-Hong Kong-Macao Greater Bay Area

providing robust support for high-quality regional

economic and social development.

67Jointly Building Harmonious Communities with People-Centered Commitment

The Gaoligongshan Tunnel constructed by CREC

serves as a pivotal project for the Dali-Ruili Railway

and a key component of the China-Myanmar

International Railway Corridor. Upon full operation

it will end the historical absence of railway access

in ethnic minority regions of western Yunnan. Goods

entering via the Ruili Port can rapidly reach inland

areas through this major transport artery significantly

enhancing trade logistics and cultural exchange

between China Myanmar and the broader Southeast

Asian region.The Baotou-Yinchuan High-speed Railway (Baoyin

High-speed Railway) designed and constructed

by CREC was opened to traffic facilitating the

implementation of the strategy for the large-scale

development of the western region in the new era.Strengthening Technological Innovation

CREC consistently regards scientific and technological innovation as the primary driving force for high-quality

development deeply implements the innovation-driven development strategy continuously deepens the reform of

scientific and technological innovation systems and mechanisms and improves the full-chain innovation system.Anchoring major national strategic demands and industry technological frontiers and focusing on core fields such as

rail transit long-span bridges deep-sea tunnels railway electrification and smart construction the Company goes all

out to overcome a batch of "bottleneck" key core technologies breaks through the technological bottlenecks in major

engineering construction and solidifies its leading technological advantages in the industry. By deepening the integration

of industry academia and research accelerating the transformation of scientific and technological achievements driving

the intelligent and green transformation of industries and cultivating and expanding new quality productive forces the

Company leads the upgrading of the entire industry chain through scientific and technological innovation thereby serving

the country's high-level scientific and technological self-reliance and self-strengthening.Building an Innovation System

The Company continuously optimizes the top-level design and systems and mechanisms for scientific and technological

innovation deepens the construction of the "three levels and four tiers" scientific and technological innovation system

accelerates the implementation of the construction plan for leading scientific and technological enterprises and improves

the performance assessment system for scientific and technological innovation oriented towards innovation value

capability and contribution thus comprehensively elevating the governance efficiency of scientific and technological

innovation. In 2025 the Company organized and convened a conference on scientific and technological innovation work

systematically planned the scientific and technological innovation development blueprint for the 15th Five-Year Plan and

clarified the directions and paths for the scientific and technological innovation work of the entire group.

682025 Environmental Social and Governance Report and Sustainability Report

Organizational System of "Three Levels and Four Tiers" Scientific and Technological Innovation

Level 1 Level 2 Level 3

Process and Method Achievement Promotion

Solution Center

Innovation Center and Application Center

Strengthen the coordination overall planning and supervision functions of the Company headquarters in the

Science and Technology Innovation Management Center

69

Implement major technological Leading Group for Scientific and

innovation projects Technological Innovation Work

Incubate industrial companies and Scientific and Technological Innovation

promote the commercialization of and Digitalization Department

significant technological achievements China Railway Science & Research

Institute National Laboratories and

Pool resources for technological Professional R&D Centers

innovation

Build a technological innovation

ecosystem

Undertake R&D tasks from higher-level

technological innovation platform

Take on or independently carry out

the commercialization of technological Enterprise Technology

achievements Center of Level 2 Units

Research technical solutions for major

engineering projects

Independently engage in practical Enterprise Technology

technology innovation Center of Level 3 Units

Independently research minor Engineering Technology

technological improvements and Section of Project

innovations DepartmentJointly Building Harmonious Communities with People-Centered Commitment

The Company strengthens the full-process closed-loop management of R&D investments continuously improves the

usage efficiency of scientific research funds and establishes a full-chain management mechanism covering accounting

analysis of R&D fund inputs implementation effect assessment and special audits supervision and accountability

thereby ensuring that R&D investments accurately match the needs of overcoming core technical challenges and that

outputs efficiently respond to the needs of industrial development. In 2025 the Company's scientific research investment

amounted to RMB 22.52 billion accounting for 2.06% of the primary business revenue.The Company constructs a multi-level R&D platform matrix featuring "national-level leadership provincial and ministerial-

level support and enterprise-level implementation" and carries out targeted scientific research and breakthroughs

focusing on industry core technological bottlenecks and major engineering construction demands. The Company deepens

the deep collaborative innovation of industry academia and research establishes long-term strategic cooperative

relationships with top domestic universities such as Tsinghua University and Southwest Jiaotong University jointly

builds collaborative scientific research institutions and carries out joint breakthroughs in key core technologies and joint

cultivation of innovative talents. The Company improves the full-process management mechanism for the transformation

of scientific and technological achievements perfects the scientific research achievement assessment system centered

on innovation value and implements special rewards for high-value innovative achievements and major technological

breakthroughs; these measures effectively stimulate full-chain innovation vitality and accelerate the transformation of

scientific and technological achievements into engineering applications and industrial development.By the end of December 2025

3 national laboratories (engineering research centers): National Engineering Research Center for High-

speed Railway Construction Technology State Key Laboratory of Tunnel Boring Machines and Intelligent

Operation and Maintenance and State Key Laboratory of Intelligent and Green Bridge Construction

1 national-local joint research center: National-Local Joint Engineering Research Center for Digital Rail

Transit Technology Research and Application

21 state-recognized enterprise technology centers

10 postdoctoral research stations

61 provincial and ministerial-level R&D centers (laboratories)

142 provincial-recognized enterprise technology centers

1 railway industry key laboratories

4 railway industry engineering research centers

1 field scientific observation and research stations

17 professional R&D centers of the Company

702025 Environmental Social and Governance Report and Sustainability Report

Cultivating Scientific and Technological Innovation Talents

The Company constructs a tiered scientific and technological innovation talent system; with academicians and National

Engineering Survey and Design Masters as leaders senior professional and technical talents as cadres and over

40000 frontline highly-skilled talents as the foundation it fosters a high-quality innovative workforce. The Company

formulates and implements internal management systems such as the Working Opinions on Promoting the Internal

Paid Transformation of Practical Technological Achievements and the Regulations on the Management of Scientific

and Technological Innovation Awards and intensifies preferential rewards for units and individuals with remarkable

achievements fully stimulating the vitality of various innovation subjects. The Company actively recommends Great

Craftsmen of the Nation and regularly selects scientific and technological pacesetters and special-grade technicians to

build a growth and display platform for talents. Focusing on frontier technologies the Company conducts systematic

training to comprehensively enhance the professional capabilities and technological application levels of scientific and

technological innovation talents.By the end of 2025

Academicians of the Members of National National engineering National-level candidates of

Chinese Academy of Excellent Engineer survey and design the Hundred- Thousand-Ten-

Engineering Team masters Thousand Talent Project

2 persons 2 teams 9 persons 12 persons

Experts receiving special Recipients of the National Winners of Science and National highly-skilled

government allowance Special Support Program Technology Award for workers

of the State Council for High-Level Talents Chinese Youth

110 persons 3 persons 3 persons 55 persons

National technical National-level Highly-skilled workers receiving special government

experts master artisans allowance of the State Council

35 persons 5 persons 37 persons

71Jointly Building Harmonious Communities with People-Centered Commitment

Case Special Training on the Practical Operation of AI Technology

From 7 to 10 January 2025 CREC organised

a specialised training programme on artificial

intelligence covering major management levels

and all business segments across the Company.The training curriculum included frontier

development trends fundamental theories

technical operations demonstration application

scenarios data mining and AI security. The

programme enhanced innovation awareness

and appl icat ion capabi l i t ies in art i f ic ia l

intelligence across all levels of the Company

laying a solid foundation for the implementation

of AI+ initiatives.Case The First "Pioneer Cup" Scenario + AI Innovation and the Fourth Post

Competency Competition

In September 2025 CREC held its inaugural

“P ioneer Cup” Scenar io + A I Innovat ion

Compet i t ion a longs ide the fourth Post

Competency Competition under the theme“P ioneer Inte l l igence Manufactur ing A IEmpowerment” to promote company-wide

participation in innovation. The competition

attracted 39 secondary units 135 teams

and 353 employees. Following professional

training online preliminary screening and

expert evaluations a total of 32 award-

winning teams from 18 units were selected. A

number of AI-driven innovations with practical

application value across multiple business areas

emerged effectively supporting the Company’s

accelerated digital and intelligent transformation

and further fostering an open and collaborative

innovation ecosystem.

722025 Environmental Social and Governance Report and Sustainability Report

Deepening Digital and Intelligent Transformation

The Company deeply implements the "AI+" movement establishes large models in vertical domains expands high-

value application scenarios strengthens the centralized management of informatization promotes data integration and

connectivity and deeply mines the value of data assets thus solidifying the digital and intelligent foundation of new

quality productive forces.CREC releases the Pioneer Large Model

Expressway construction

The Company has constructed an AI capability system in the vertical domain focusing

on breakthroughs in intelligent construction intelligent inspection and emergency

response intelligent maintenance equipment development and digital employee

systems driving the AI upgrading of the full life cycle of expressways.Survey and design

The Company has developed the "Pioneer· Survey and Design Large Model"

integrating 23 core capabilities in 8 categories to construct an intelligent application

system covering all business processes such as geological analysis and bridge design

achieving full-process automation. The model has been promoted and applied in major

national projects such as the plateau railway and the Chengdu-Chongqing Middle-

route High-speed Railway providing solid technical support for enhancing engineering

design quality and innovation capabilities.Industrial manufacturing

The Company has built the digital and intelligent foundation of the "Industrial Brain";

relying on the intelligent computing cloud center it releases the "Pioneer ·Industrial

Manufacturing Large Model" to form a "1 + 4 + N" service system providing full-chain

AI support for manufacturing scenarios.

73Jointly Building Harmonious Communities with People-Centered Commitment

The "four electrics" engineering for rail transit

The Company launched the “Pioneer · Four-Electrics Large Model” focusing on four core

business areas—intelligent design intelligent construction intelligent operation and

maintenance and intelligent industry—establishing 26 intelligent agents. Its flagship

application “Zhangshang Dianhua” has reduced cross-departmental collaboration and

communication costs by 60% improved knowledge retrieval efficiency by 99% and

shortened hazard inspection response time from hours to minutes injecting new quality

productive forces into the intelligent construction of high-speed rail.Special and long-span bridges

The Company has developed the "Pioneer · Bridge Large Model" building a "1 + 38"

technical system based on full industry chain data achieving full life cycle digital and

intelligent mutual feedback in bridge design manufacturing construction equipment

and operation and maintenance. The Company has launched the bridgehead agent

platform which covers 16 high-value AI scenarios and integrates functions such as

image-based hazard recognition and intelligent scheme generation; it has been applied

in nearly a hundred projects increasing safety management efficiency by 60%.Tunnels and underground spaces

The Company has released the "Pioneer · Tunnel Large Model"; based on 773 lines and

120 billion pieces of data from the shield/TBM big data center it constructs a technical

system where the general large model schedules medium and small models achieving

full life cycle scenario + AI digital and intelligent mutual feedback. The Company has

launched the Tunnel Man AI assistant with functions such as professional Q&A and

standard translation implementing applications such as BIM visualization for tunnel

design and construction evaluation.Case CREC Achieves Breakthroughs in Embodied Intelligence

CREC has independently developed intelligent self-propelled operation and maintenance equipment

for overhead contact lines which has been successfully applied on high-speed rail lines such as the

Guangzhou–Zhanjiang High-Speed Railway. The system achieves over 95% accuracy in identifying safety

hazard characteristics and over 90% accuracy in predicting the lifespan of key components enabling full-

process automated operations from inspection and diagnosis to maintenance. It represents a landmark

achievement marking China’s high-speed rail entering the “robotic maintenance era.”

Replacement rate of routine manual operations

over 80%

Reduction rate of overhead contact system failures

15% Application of the China Railway Pioneer Large Model in over the Field of "Four Electrics" on the Guangzhou-Zhanjiang

High-speed Railway

742025 Environmental Social and Governance Report and Sustainability Report

Demonstrating Achievements in Scientific and Technological

Innovation

The Company proactively integrates into the national innovation system actively undertakes major scientific and

technological tasks and continuously advances the execution of special tasks assigned by the State-owned Assets

Supervision and Administration Commission of the State Council as well as the transformation of related achievements.Focusing on key fields such as long-span bridges deep-sea tunnels railway electrification and high-end equipment

the Company strives to break through technological bottlenecks in major engineering construction and create more

innovative demonstration projects.In 2025

The Company undertook 98 Provincial and ministerial-level science and

7 national key scientific research projects technology awards

1 achievement selected into the Recommended Catalog of Scientific and Technological Innovation Achievements of

Central SOE

CREC Released Top Ten Innovation Achievements in 2025

Greenization Intelligentization Integration

1. Complete

Serving major construction 8. Plateau and alpine

national 4. Intelligent high-speed railway technology railway construction construction technology

strategies for polar technology

construction

Transformation 2. Construction 5. Intelligent 6. Intelligent

and upgrading technology for construction construction 9. Construction

of traditional green and low- technology for tunnels technology for "four technology for special carbon integrated and underground

industries electrics" engineering

and long-span bridges

transport hubs engineering in rail transit

Cultivating 3. Green low-carbon 7. Intelligent perception and

and expanding 10. Shield/TBM and environmentally maintenance technology for transport

strategic emerging manufacturing friendly construction infrastructure technology

industries technology

75Jointly Building Harmonious Communities with People-Centered Commitment

1. Complete construction technology for polar 2. Construction technology for green and

construction low-carbon integrated transport hubs

Built Qinling Station the world's first station with a 100% Developed station-city integration design and built green

prefabrication rate; adopting fully modular designs and polar hubs such as Fengtai Station and Qinghe Station. Integrate

weather-resistant materials with only 0.2mm of corrosion systems such as photovoltaic power generation and

over 100 years. Created a "wind-solar-storage-hydrogen- rainwater recycling in which Qinghe Station obtains the

diesel" microgrid with clean energy accounting for 60% Three-Star Green Building Certification and LEED Gold

achieving dual-platform intelligent control. Certification driving the transformation of hubs towards

green low-carbon and intelligent development.

3. Green low-carbon and environmentally 4. Intelligent high-speed railway

friendly construction technology construction technology

Constructed a full-chain green system of "design - construction Constructed a full-chain system of "digital and intelligent

- operation and maintenance" utilizing Lightweight Ultra-High- survey - intelligent construction - intelligent operation" and

Performance Concrete (LUHPC) and low-carbon ratio concrete applied Building Information Modeling (BIM) and Internet

reducing cement usage by 20%. Built green demonstration of Things (IoT) technologies to achieve a 15% increase in

projects such as the Lhasa-Nyingchi Railway and the China- survey efficiency a 20% increase in precision and a 25%

Laos Railway practicing the concept that "lucid waters and increase in production efficiency.lush mountains are invaluable assets".

5. Intelligent construction technology for 6. Intelligent construction technology for

tunnels and underground engineering "four electrics" engineering in rail transit

Built the largest shield/TBM data center in China and create Independently developed hybrid-electric and hydrogen-

a full-chain system of intelligent excavation support fuel work vehicles and innovate six intelligent tooling

and assembly. Pioneered trackless transportation and devices achieving a 99.5% pass rate in key processes.intelligent ventilation technologies and realizes full-process Construct a digital twin system of BIM + Geographic

mechanization of the drill-and-blast method driving the Information System (GIS) in which the intelligent detection

intelligent transformation of tunnel construction. system wins an international award from International

Data Corporation (IDC) setting a global benchmark for

"intelligent manufacturing".

7. Intelligent perception and maintenance 8. Plateau and alpine railway construction

technology for transport infrastructure technology

Constructed a full-cycle system of "perception - assessment Created a four-dimensional survey system of "space-air-- maintenance" achieving micrometer-level defect detection ground-borehole” and developed domestic plateau survey

for tracks and sub-millimeter-level for bridges. Developed equipment to achieve data acquisition in unmanned areas.independent detection equipment and health management Propose intelligent disaster reduction route selection and

platforms driving the transformation of tradit ional multi-level shock absorption technologies and overcomes

maintenance towards intelligent green and efficient the challenge of tunnels with high ground temperatures of

operation and maintenance. 92.6°C supporting the construction of the Sichuan-Tibet Railway.

9. Construction technology for special and 10. Shield/Tunnel Boring Machine (TBM)

long-span bridges manufacturing technology

Pioneered the stiffness design theory for large-span bridges Ranked first globally in production and sales for eight

on 350 km/h high-speed railways and develop domestic consecutive years building a comprehensive product

software such as the "Structural Nonlinear Analysis System portfolio. Developed the world's first full-process intelligent

(SNAS)" and "Linghui" achieving international leadership in shield machine with automatic tool changing efficiency

the nonlinear analysis of cable-supported bridges. Created increased by 5-8 times and the localization rate of core

an intelligent manufacturing model of "five lines and one components exceeding 95% achieving a leap from

system" assisting in the millimeter-level closure of the following to leading.Changtai Yangtze River Bridge.

762025 Environmental Social and Governance Report and Sustainability Report

By the end of 2025

132 National Science and 862 Provincial and 200 Tien-yow Jeme

Technology Progress Awards and Ministerial-level Science and Civil Engineering Prizes

National Technology Invention Awards Technology Progress Awards

Protecting Intellectual Property

The Company strictly complies with laws and regulations such as the Patent Law of the People's Republic of China and

the Trademark Law of the People's Republic of China formulates the Patent Management Regulations of CREC and

the Trademark and Trade Name Management Regulations of CREC and improves the full-chain intellectual property

protection system. In patent management unified leadership and tiered responsibilities are adopted and through

the scientific and technological management information system it achieves full life cycle dynamic management

and strengthens the management and confidentiality control of service inventions. The trademark management

comprehensively coordinated by the Legal and Compliance Department for registration renewal and rights protection

strictly standardizes the licensing of the "China Railway" trade name and strictly prevents unauthorized use and

counterfeit infringements. In 2025 the Company was granted 8540 patents providing strong momentum for high-quality

development.In 2025

Core papers published Patents held Patents authorized

1061 articles 48029 items 8540 items

Invention patents Overseas patents Software copyrights Intellectual property rights

obtained held

3624 items 194 items 906 items 2 items

77Jointly Building Harmonious Communities with People-Centered Commitment

Forging Craftsmanship Quality

CREC vigorously carries forward the spirit of craftsmanship adheres to the fundamental principle of "quality first for a

century-long plan" deeply integrating the pursuit of excellence into the full life cycle of projects constructing a full-chain

closed-loop quality control system and empowering quality upgrades through technological innovation to fully build high-

quality projects set industry quality benchmarks and fully demonstrate the leading role of a central SOE in building a

quality-strong nation.Governance

The Company scientifically sets quality targets deepening

lean management and implementing total qual ity

management (TQM) at different levels and across different

industries. The Safety Quality and Environmental Protection

Supervision Department is comprehensively responsible

for the quality control and work safety supervision of the

Company's engineering products services and operational

maintenance of operating assets including establishing

and improving the Company’s quality management system

enhancing emergency management for safety quality and

environmental protection and strengthening supervision

over the rectification of common engineering quality issues.The Company has issued the Guiding Opinions of CREC

on Strengthening the Full Life Cycle Quality Supervision

of Construction Projects and Improving Engineering

Construction Quality which clarifies and standardizes the

implementation paths and work requirements for the full life

cycle quality management and supervision of construction

projects from four dimensions namely implementing

responsibilities detailing tasks rectifying and improving and

comprehensive leading.Quality Management System Certification Certificate of CREC

782025 Environmental Social and Governance Report and Sustainability Report

Strategy

Closely aligned with major national strategies and enterprise development plans the Company leads the transformative

development of global infrastructure through quality continuously consolidates the quality and brand advantages of the

"state-owned enterprises" in the five traditional fields of railways highways urban rail transit municipal engineering and

housing construction actively expands into emerging infrastructure fields such as water conservancy and hydropower

energy pipeline networks intelligent construction and computing power facilities as well as systematically improves the

quality development layout across all fields. The Company has established a normalized identification mechanism for

quality-related risks and opportunities systematically analyzed and assessed their impacts on business operations and

financial performance and formulated targeted response measures to achieve closed-loop control of quality risks.Risk/Opportunity Description of Impacts of Risks/

Type Opportunities on Business and Finance Time Frame Response Measures

An imperfect engineering management

system leads to engineering quality problems Improve the construction of the engineering

or safety accidents resulting in negative Medium and quality management system to realize

impacts on the Company's operating Long Term the full life cycle quality management and

costs and reputation potentially incurring supervision of engineering

substantial compensation.Construction defects trigger issues related Carrying out standardized technological Risks

to engineering quality warranties and and process transformation and

rework rectifications resulting in increased Medium Term establishing an online monitoring system

investments in rework costs and warranty for process parameters and quality ensures

fees. the standardized implementation of engineering

By advancing end-to-end digitalization

across design construction and operations

By delivering high-quality engineering the enhances project delivery capabilities

Company strengthens its brand equity Medium and and enables the development of flagship

and expands its market layout thereby Long Term projects the Company builds landmark

Opportunities supporting revenue growth. projects actively applying for the National Quality Engineering Award strengthening

brand communication setting benchmarks

and shaping the corporate image

Engineering Quality Management

The Company deeply implements the requirements for full life cycle quality supervision of construction projects promotes

standardization across the entire processes of the quality management system engineering entity construction industrial

product manufacturing and operation and maintenance service operations thereby comprehensively elevating the

quality control level of projects. Focusing on the whole process of production organization and quality risk prevention

and control the Company continuously optimizes the project quality supervision system and operating mechanism

establishes and improves the traceability management and accountability mechanism for major quality accidents

and incidents to consolidate control responsibilities at all levels. The Company strictly implements the Qualifications

Management Regulations of CREC and continuously strengthens the management of various qualifications and licenses

providing a solid guarantee for the compliant construction and quality improvement of projects. By the end of 2025 the

Company possessed a total of 4219 various qualifications and licenses.The Company firmly grasps the barrier of source quality control for engineering and has issued the Notice on

Strengthening Compliant Procurement of Project Products and Construction Quality Control to urge all affiliated units to

deeply carry out special inspections and rectifications of quality hazards in industrial products. The Company established

a material quality risk register comprehensively incorporating core materials that constitute engineering entities and

directly relate to engineering safety and quality into the two-level centralized control system to continuously intensify

direct procurement from manufacturers by which it strengthens the defense line of engineering quality control from the

procurement source.

79Jointly Building Harmonious Communities with People-Centered Commitment

Built by China Railway No. 3 Engineering Group with

participation from China Railway Hi-Tech Industry Corporation

Limited the Xinjiang Yili River Third Bridge-China's first three-

tower four-span "O"-shaped low-pylon cable-stayed bridge-

spans the junction of Yining Kekedala and Qapqal. Stretching

2028 m the project extensively applied informatization and

smart technologies. Digital modeling precisely replicated

the entire main tower construction process determining

the optimal assembly scheme to ensure perfect alignment

of the beam geometry and three-dimensional cable surface

curvature.For the G577 Jinghe-Yining Line's pivotal project-the North

Tianshan Extra-Long Tunnel-invested and constructed by China

Railway City Development and Investment Group surveyed and

designed by China Railway Liuyuan Group and built by China

Railway First Group and China Railway No. 2 Engineering Group

the "Advanced Geological Prediction + Dynamic Construction

Adjustment" approach was adopted. This enabled real-

time optimization of support parameters effective control of

surrounding rock deformation and ensured tunnel structural

stability. After tunnel breakthrough vehicles traverse the

northern Tianshan range in approximately 15 minutes.The track laying of the entire Xi'an-Ankang High-speed Railway

constructed by China Railway First Group was officially

launched in October 2025; it will adopt newly self-developed

track laying equipment and an intelligent management

system project in China to achieve digitalized and precise

management of the track laying process.The Chengdu Metro Line 13 Phase I project EPC-contracted

by China Railway City Development and Investment Group

with participation from multiple CREC subsidiaries overcame

numerous technical challenges and environmental constraints.It achieved high-quality milestones including station roof

completion tunnel breakthrough track laying completion

electrification handover of track areas trial runs and station

handover forming the " CREC Solution" for metro construction

in bustling metropolises.The Guangzhou Baiyun International Airport Phase II I

Expansion's Ground Transportation Center (GTC) complex

project constructed by China Rai lway Construct ion

Engineering Group is now operational. Implementing

systematic management the project strictly enforced quality

standards such as tagged acceptance inspections and triple-

check systems to ensure first-time excellence.The New Gwadar International Airport in Pakistan constructed

with the participation of China Railway Beijing Engineering

Group is a key project under the China–Pakistan Economic

Corr idor . Adher ing to ref ined construct ion and lean

management the project achieved zero safety hazards and

zero quality defects and successfully passed completion

acceptance. It received an aid project certificate from the

Economic Cooperation Bureau of the Ministry of Commerce of

China and was rated “Excellent.”

802025 Environmental Social and Governance Report and Sustainability Report

High-Quality Customer Service

The Company adheres to a customer-centric service philosophy and constructs a standardized refined and smart excellent

service system; through system improvement process optimization and supervisory improvement. Meanwhile it continuously

enhances the quality of operational services winning customer trust public recognition and industry reputation with high-quality

and warm services.Overhaul customer service management systems

The Company formulates and continuously improves quality management measures and service standards for operating

projects constructing a standardized service system covering functions such as customer service hotlines emergency

rescue and information release. It clarifies standard requirements such as service processes and response timelines

to promote the standardized normalized and refined development of operational services. It also has formulated and

issued special systems such as the Expressway Operation Management Manual and implemented distinctive warm

service measures such as smile service continuously improving service quality and customer satisfaction.Improve complaint handling and feedback mechanisms

The Company builds diversified and convenient customer feedback channels including telephone email project site

suggestion boxes and publicized complaint hotlines of which a linkage mechanism between the customer service hotline

and the monitoring center is established for the expressway operation business to achieve around-the-clock acceptance

of appeals. The Company improves the full-process closed-loop management mechanism of "receipt and registration -

classified transfer - investigation and verification - handling and feedback - return visit and archiving" regularly conducts

statistical analysis of complaint data performs source analysis on typical complaints promotes systematic rectification

and optimization and incorporates the effectiveness of complaint handling into the operational service quality

assessment and evaluation system. In 2025 no major complaints related to products or services were received.Strengthen the data-driven approach and service improvement

The Company continuously strengthens the construction of a smart operation and maintenance system and promotes

the application of digital tools such as intelligent video monitoring systems and intelligent maintenance platforms

providing solid technical support for the preventive maintenance and service process optimization of operating projects

and driving the transformation of service management from post-event disposal to pre-event prevention. Specifically for

the expressway operation business the Company deeply applies big data technology to accurately analyze traffic flow

characteristics during holidays and public travel patterns to deploy traffic management and service guarantee plans

in advance. It also pushes real-time road condition information and travel tips through navigation platforms thereby

comprehensively enhancing the convenience and experience of public travel.Case Building High-quality Projects Based on Public Voices: Customer Satisfaction

Practices of the North Extension Project of Wanjiali Road in Changsha

The North Extension Project of Wanjiali Road in Changsha

undertaken by China Railway No. 5 Engineering Group.taking customer satisfaction as its core constructs a full-

cycle communication mechanism precisely connects with

the demands of all parties through multiple channels such as

questionnaire surveys and in-depth interviews to integrate

them into the construction plan. In this project priority was

given to the construction of power tunnels sound barriers and

construction periods were optimized incremental launching and

jacking processes were adopted to minimize travel disruptions

and regional culture was incorporated to create landscapes.Through regular return visits and dynamic optimization customer

satisfaction increased from 80% to 95% and the project was

awarded the 3-Star Rating of National Customer Satisfaction

Engineering for the year 2025 becoming a model for integrating

people's livelihood with high-quality projects.

81Jointly Building Harmonious Communities with People-Centered Commitment

Responsible Marketing

The Company adheres to the philosophy of law-based compliance and integrity-based operation strictly abides by

national laws regulations regulatory requirements and industry norms such as the Tendering and Bidding Law and

the Implementation Regulations of the Tendering and Bidding Law revises and improves the Business Development

Management Measures of CREC continuously improves the responsible marketing system strictly observes business

disciplines standardizes business behaviors and resolutely maintains a fair just and orderly competitive industry market

order thereby effectively fulfilling the compliance operation responsibilities of a central SOE.Impact Risk and Opportunity Management

Always adhering to baseline thinking and a systematic concept the Company centers on the full life cycle of projects

to construct a full-chain quality risk and opportunity management system covering risk identification analysis and

assessment tiered control closed-loop disposal and continuous optimization; by deeply integrating risk management

with quality improvement compliant operation and quality and efficiency improvement the Company not only

strengthens the quality and safety baseline but also deeply uncovers opportunities for quality upgrades.Combining the characteristics of projects process tooling plans and construction scenarios

the Company carries out comprehensive inspections systematic analyses and quantitative

assessments of quality risk triggers and impact scopes from the two core dimensions of

management and technology. The Company unifies and standardizes the initiation nodes

implementation frequencies determination criteria risk notifications and dynamic rating

adjustment rules for quality risk assessments and clarifies the leading control and synergistic

cooperation responsibilities of all levels and relevant business departments thereby forming a

standardized risk assessment mechanism with clear rights and responsibilities standardized

Construction processes and top-down collaboration. Meanwhile relying on big data and information

of quality risk technology the Company strengthens the precise identification and dynamic monitoring of

identification and quality risks to ensure that risk inspections are comprehensive without omissions and that

assessment system rating determinations are scientific and precise.The Company deeply embeds quality risk control into the entire processes of technical plan

compilation and review construction organization field operations and completion acceptance;

specifies targeted risk prevention and control measures control standards and linkage

mechanisms in special technical plans; and dynamically issues quality risk alerts in combination

with industry regulatory requirements and actual project construction conditions thereby

pushing the barrier of risk prevention and control forward. The Company establishes and

improves the tiered control risk register for quality risks implements tiered and classified control

strictly according to major relatively major and general risk levels and correspondingly clarifies

Full-process and the leading control responsibilities and implementation requirements at each level to construct

closed-loop prevention a three-level risk control system. Thus by focusing heavily on precise prevention and control of

and control of quality root-cause and systematic major quality risks and core links it comprehensively strengthens the

risks baseline for quality risk prevention and control.Taking full-chain risk control as a starting point the Company systematically identifies

development opportunities in quality improvement process optimization technological

innovation and brand shaping deeply integrates risk rectification with quality upgrading

lean management cost reduction and efficiency enhancement and drives construction

process optimization perfection of management systems and breakthrough of technological

innovations through risk traceability inspections thereby achieving a virtuous cycle of

Uncovering and "preventing and controlling risks shoring up weak spots improving quality and creating value"

transformation and empowering the high-quality development of the enterprise with refined risk management.of quality

opportunities

822025 Environmental Social and Governance Report and Sustainability Report

Indicators and Targets

Quality Targets

Strictly guard the quality and safety baseline

Eradicate relatively major and above engineering quality liability accidents strictly control quality red-line issues

in railway construction projects and reduce the frequency of general quality liability accidents for engineering

works year-on-year.Special control of quality-related public opinion

Eradicate major negative quality-related public opinions in national mainstream media strictly control the

fermentation and spread of general quality-related public opinions and achieve full-process closed-loop handling

of quality-related public opinion.Guarantee engineering entity quality

Achieve a 100% acceptance pass rate for unit works upon initial inspection ensure that all completed and handed-

over works fully comply with national and industry quality acceptance standards as well as the requirements of

design documents and technical specifications with a 100% rectification closure rate for quality hazards.Deepen full-chain quality control

Continuously improve the quality management system achieve full coverage of ISO9001 quality management

system certification for core production and operating units continuously reduce common quality defects

in projects and product quality defects and achieve a 100% closed-loop resolution rate for quality-related

complaints.Facilitate quality upgrades through excellence pursuit

The Company actively strives for national and provincial/ministerial-level quality engineering awards

continuously polishes the quality brand of the "state-owned enterprises" in infrastructure construction and

demonstrates the responsibility of a central SOE in building a quality-strong nation.

83Jointly Building Harmonious Communities with People-Centered Commitment

Indicators

In 2025

31 "National Safety Standard Construction Site" titles awarded by the China Construction Industry

Association 12 project quality management standardization technology competition awards and

29 Quality Trustworthy Teams

125 engineering quality improvement competition awards awarded by the China Association of

Construction Enterprise Management and 50 Quality Trustworthy Teams

17 projects applied for the Luban Prize

3 projects applied for the National Quality Engineering Gold Award

33 projects applied for the National Quality Engineering Award passed the on-site re-examination by the

China Construction Industry Association and the China Association of Construction Enterprise Management

By the end of December 2025

851 national-level quality engineering awards won

including 253 Luban Prizes 46 National Quality Engineering Gold Awards and 552

National Quality Engineering Awards.

842025 Environmental Social and Governance Report and Sustainability Report

Strengthening the Foundation of Safety

Consistently adhering to the principle of putting people and lives first CREC anchors the overall goal of essential safety

construction consolidates full-chain safety responsibilities through iron-fisted and hardline measures improves the safety

management system with systematic thinking prevents and defuses major safety risks through source governance and

strengthens the all-staff safety defense line through cultural infiltration; the Company resolutely curbs the occurrence of major

and extraordinary safety accidents and earnestly puts the protection of the lives and properties of the people in the first place

and implements it effectively.Building a Safety System

Safety Management Targets

Short-term targets Long-term targets

Comprehensively consolidate the all-staff work safety Construct a systematic and complete safety governance

responsibility system strictly implement the duties system ensuring that during the entire 15th Five-

of the first responsible persons deeply carry out Year Plan period the number of fatalities from liability

the special movement of "grand reflection grand accidents per RMB 10 billion of operating revenue is

rectification and grand improvement" and resolutely controlled within 0.5.achieve dual decreases in the total number of accidents

and the number of fatalities.Complying with relevant laws and regulations such as the Work Safety Law of the People's Republic of China the Law of the

People's Republic of China on the Prevention and Control of Occupational Diseases and the Fire Protection Law of the People's

Republic of China the Company formulates and issues systems such as the Three-Year Action Plan for Tackling the Root Causes

of Work Safety (2024-2026) the Ten Rigid Rules for Iron-Fisted Safety Governance of CREC and the Occupational Safety and

Health Supervision and Management Regulations ; it continuously constructs a systematic complete scientifically standardized

and effectively operating safety management system to ensure that the full process of safety management is law-based and

rule-abiding and has passed the ISO 45001 occupational health and safety management system certification.The Company establishes a Work Safety (Quality) Committee as the overarching decision-making body for work safety work

across the entire system. The Committee strictly implements the requirement of "shared responsibility of the Party and

government and dual responsibilities for one post" in which the Secretary of the Party Committee Chairman and President

of the Company jointly serve as Directors the Vice President in charge of safety and quality work serves as Deputy Director

and all other leadership team members senior executives and heads of relevant headquarters departments are included as

members effectively consolidating the core work safety responsibilities of the leadership team. An office is set up under the

Committee dedicated to being responsible for the implementation supervision and closed-loop management of all decisions and

deployments made by the Committee.The entire system constructs a responsibility implementation system that is "horizontally comprehensive and vertically deep"

while all second- and third-tier enterprises have established work safety supervision and management departments and all

construction and investment-oriented enterprises are fully equipped with full-time safety directors achieving full coverage

of safety regulatory bodies and full-time personnel. Meanwhile work safety work is comprehensively incorporated into the

performance assessment systems at all levels; for units with prominent shortcomings in safety management and inadequate

implementation of responsibilities measures such as downgrading and one-vote vetoes are strictly executed in business

performance assessments and the selection of outstanding and advanced models thus forming a fully closed-loop management

system of "responsibility implementation - assessment and supervision - accountability and effectiveness evaluation".

85Jointly Building Harmonious Communities with People-Centered Commitment

"1+9+N" Safety Supervision and Management System

"1" refers to the formulation "9" refers to the systematic review and "N" refers to the issuance of the

and issuance of the guiding rationalization optimization improvement Rigid Standards for Safety Quality

programmatic document that integration and streamlining of existing and Environmental Protection

overarching comprehensive management systems to form 9 special Management of CREC which is

work namely the Safety management systems including work safety divided into the management section

Quality and Environmental supervision engineering quality supervision professional section and operational

Protection Management ecological and environmental protection section with a total of 1299 articles.Measures of CREC; supervision emergency management At the same time the Ten Rigid Rules

work safety responsibility system system for Iron-Fisted Safety Governance of

supervision and inspection management CREC was issued comprehensively

management rewards and punishments constructing the Company's safety

regulations high-quality engineering quality and environmental protection

evaluation and comprehensive emergency supervision and management

plans; system.Ten Strict Measures for Maintaining Security of China Railway Group Limited

● Fulfill the ● Implement risk ● Carry out scheme ● Manage equipment ● Ensure the quality

responsibility of the identification disclosure and tooling manufacturing and efficiency of

first person in charge and prevention implementation and installation hazard investigation

● Enforce the "Three ● Confirm ● Control the ● Supervise and assess and management

Controls & Three operation quality of key cooperative teams ● Handle on-site

Musts" responsibility conditions materials abnormal working

conditions

Preventing Safety Risks

The Company lawfully formulates special institutional documents such as the Guiding Opinions on the Dual Prevention

Work Mechanism of Tiered Safety Risk Control and Hazard Inspection and Governance the Emergency Plans for Safety

Quality Ecological Environment and Disaster Accidents (Incidents) and the Guidelines for Rescue and Relief Work in

Tunnel Construction ; clarifies the control standards and regulatory responsibilities for major safety risks and major hazard

sources; and constructs a full-process risk prevention and control system featuring "tiered risk control closed-loop hazard

governance and highly efficient emergency disposal".The Company strictly implements the dual control principle of "unit jurisdiction + regional control" coordinates and

advances special rectifications systemic supervision and inspections and normalized hazard inspections and governance

and carries out dragnet-style and penetrating inspections in key areas and core links; it earnestly ensures the early

identification of risks early rectification of hazards and early clearance of problems thereby addressing both symptoms

and root causes and resolving issues at the source.In 2025 the Company officially launched the CREC Work Safety Supervision Information System. Relying on the three

core functions of automatic extraction of risk data sharing of hazard data and informatized management of accidents

and warnings it comprehensively connects the full chain of risk identification hazard rectification and accident warning

achieving digital intelligent and visual upgrading in safety risk prevention and control.

862025 Environmental Social and Governance Report and Sustainability Report

Case "Thunder Movement" for Work Safety

In the third quarter of 2025 CREC launched the "Thunder Movement" for work safety; it clarified that all

project departments must conduct 100% dragnet-style inspections of all construction sites and all processes

on a monthly basis and units at all levels must achieve full coverage of tiered supervision and inspections

over affiliated construction-in-progress projects and high-risk projects. Through various forms such as special

inspections publicity and training emergency drills and post assessments all units across the entire system

comprehensively consolidated safety responsibilities rectified safety hazards and prevented and controlled

major risks. In 2025 through this special movement and stationed supervision and inspections a total of

501 projects were inspected and 118 major hazards were rectified in a closed loop effectively preventing

and curbing relatively major and above-work safety accidents and earnestly strengthening the safety risk

prevention and control capabilities of the entire system.The No. 1 Company of China Railway No.

5 Engineering Group thoroughly carried

out the "Thunder Movement" to conduct

comprehensive inspections without blind

spots across all projects under construction

Guaranteeing Work Safety

The Company has established long-term intrinsic safety goals rigorously implemented the 14th Five-Year Plan for Work Safety

Management and fully strengthened the safety responsibility chain. This ensures comprehensive safety coverage: adequate

staffing dynamic risk identification effective technical measures thorough risk controls complete hazard investigation and

rectification and rigorous emergency response evaluation achieving system-wide and lifecycle safety management. For

contractor safety management the Company implemented a negative list system strictly evaluating bidders' work safety

management capabilities during qualification screening. Labor management is integrated into prequalification and routine/annual

evaluation systems. At contract signing clauses on labor safety and workers' rights are explicitly defined requiring contractors

to strictly implement occupational health and safety measures and provide secure working environments. The Company has

established concurrent insurance safeguards and safety education mechanisms providing workers with occupational injury and

accident insurance. Regular safety and health training creates a closed-loop management model: "strict qualification screening

clear contractual responsibilities and robust safeguard implementation" minimizing safety incidents and occupational hazards.Cultivating Safety Culture

The Company consistently regards the construction of safety culture as a crucial grasp for essential safety construction and

builds a multi-level full-coverage safety education and training system characterized by "leadership taking the lead post

coverage and all-staff participation"; it continuously drives the internalization of safety concepts in mind and externalization in

action fostering a strong atmosphere where "everyone prioritises safety is capable of emergency response acts with safety in

mind in all matters and remains vigilant at all times".Strengthening the "head goose" leading role of the "critical few" the Company organizes and conducts special training on

safety leadership covering over 180 leadership team members of second- and third-tier units to earnestly enhance the safety

performance capabilities of managers at all levels and drive the overall improvement of the entire system's safety management

capabilities through the "head goose effect". Focusing on enhancing the capabilities of key posts the Company carries out

targeted special safety training in key areas such as underground excavation construction of tunnels by region and unit; with a

total of 1456 key post personnel trained it earnestly fortifies the safety defense lines in key areas and core links.

87Jointly Building Harmonious Communities with People-Centered Commitment

Case The 24th National "Work Safety Month" of CREC

In June 2025 CREC organized the 24th National "Work Safety Month"

swearing-in activity centered around the theme "Everyone care

about safety everyone knows how to respond to emergencies - Find over

safety hazards around you". The activity covered the headquarters

all units and over 7000 construction-in-progress projects with construction-

approximately 300000 employees solemnly swearing to strictly 7000

abide by safety rules and regulations. in-progress projects

Signing on the promotional banner of the Work Safety Month

Case Work Safety Management Knowledge and On-site Hazard Inspection Skills

Competition of China Railway No. 5 Engineering Group

In August 2025 China Railway No. 5 Engineering Group held a work safety management knowledge and on-

site hazard inspection skills competition; focusing on high-risk areas such as operations at heights temporary

electricity use and hoisting more than 80 typical hazard points were set up to comprehensively test the

contestants' recognition accuracy and ability to formulate rectification plans. Through promoting learning

and management via the competition the activity enhanced the risk identification and practical control levels

of primary-level safety management personnel.Safety training by China Railway No. 2 Engineering Group VR safety education experience station of China Railway No. 4

Engineering Group

882025 Environmental Social and Governance Report and Sustainability Report

Expanding Overseas Business

CREC consistently adheres to the principle of extensive consultation joint contribution and shared benefits deeply

integrates into the high-quality joint construction of the "Belt and Road Initiative" and coordinates the construction of

major landmark projects and "small and beautiful" livelihood projects; with a batch of exemplary cooperation outcomes

the Company powerfully promotes infrastructure connectivity and economic and trade exchanges among countries along

the routes thereby making active contributions to building a community with a shared future for mankind.GovernanceThe Company has established an overseas business governance framework based on the principle of “strengthening thecore consolidating the two wings and optimising N drivers” forming a “one core two wings and N drivers” structure. The

headquarters serves as the “core” with relevant departments undertaking guidance supervision and control functions

over overseas operations. The International Department exercises centralised management of overseas business

performing overall coordination scheduling and command functions. China Railway International Group and China

Overseas Engineering Group act as the “two wings” leveraging their commercial strengths to advance substantive and

localised development in key markets and deepen client and market engagement. Engineering bureaus design institutes

and other secondary units serve as the “N drivers” expanding overseas business in accordance with localisation

principles forming a governance structure with clear responsibilities efficient coordination and strong end-to-end control.In 2025 the Company revised and improved institutional frameworks such as the Administrative Measures for Overseas

Social Security Management and the Emergency Response Plan for Overseas Social Security Incidents promoting

standardized systematic and refined management across the full lifecycle of overseas operations and continuously

enhancing governance over international business.Strategy

Taking serving the national strategy of high-level opening-up as its fundamental guidance the Company anchors the

core mainline of high-quality joint construction of the "Belt and Road Initiative" constructs the "One Body Two Wings

and Multiple Enablers" international operation system and adheres to the principles of "deeply cultivating core areas

focusing on key breakthroughs prioritizing benefits and controlling risks"; by consolidating advantageous national

markets expanding strategic emerging markets and coordinating domestic and international markets based on the

core advantages of the entire industry chain the Company drives the synergistic overseas expansion of the full chain

of Chinese technologies standards equipment and brands continuously enhances core global operating capabilities

and strives to create differentiated international competitive advantages. In 2025 the implementation of the Company's

overseas strategies yielded remarkable results the market layout was continuously optimized breakthroughs were made

in strategic markets and both operating scale and development quality achieved dual improvements.

89Jointly Building Harmonious Communities with People-Centered Commitment

Risk/Opportunity Description of Impacts of Risks/Opportunities on Business and Time Type Frame Response MeasuresFinance

The Company establishes a

full-cycle impact assessment

mechanism for overseas

projects and a full-chain

Regime changes or armed conflicts occurring risk prevention and control

in the host countries of projects may lead to mechanism featuring "front-

project expropriation or contract breaches end research and judgment

resulting in abnormal losses of fixed assets in-process control and

Medium and

or construction-in-progress. Disputes and post-event closed-loop

Long Term

Risks protests arising from local laws and cultures management" studies

will generate additional expenditures and and judges international

compensation fees leading to increased situations and laws and

project costs. regulations and implements

tiered classified and

penetrating control over core

risks such as geopolitics and

market operations.Grasping the opportunities

from the deepening and

upgrading of the high-quality

joint construction of the

"Belt and Road Initiative"

Undertaking large-scale infrastructure the structural upgrading

projects in overseas regions helps of the global infrastructure

continuously enhance core global operating Medium and market and the international

capabilities driving the growth of the Long Term development of Chinese

Opportunities enterprise's primary business revenue and standards the Company

total profits. promotes the full-chain

overseas expansion of

technologies standards

equipment and brands to

enhance its international

core competitiveness.

902025 Environmental Social and Governance Report and Sustainability Report

Case A New Benchmark for Pragmatic Cooperation Between China and

Iraq: The Nisour Square Interchange Project in Baghdad Iraq

The Nisour Square Interchange Project in Baghdad Iraq is a landmark livelihood project implemented to

alleviate long-term traffic congestion in the core area of the capital and it is also a model of the alignment

between China's "Belt and Road Initiative" and Iraq's "Development Road" strategy. In response to the

complex traffic conditions at the Nisour roundabout the project team innovatively adopted a three-

dimensional scheme of "2 viaducts + 5 tunnels" that integrates Chinese technologies with international

standards constructing a four-level traffic system combining viaducts ground roads tunnels and

underpasses thereby greatly enhancing regional traffic capacity. The successful implementation of the

project has established a good brand reputation and a model of cooperation for Chinese enterprises to deeply

cultivate the markets in Iraq and the Middle East. The Prime Minister of Iraq personally visited the site for

inspections six times during the construction period and highly praised the construction achievements.CREC crafts the Kinshasa Ring Road Project in the capital of

the Democratic Republic of the Congo with ingenuity solving

the "pain points" of people's livelihood and driving local

economic development.The Sunkoshi–Marin Diversion Tunnel Project in Nepal

constructed by CREC is another “National Pride Project”

implemented under the "Belt and Road Initiative" following

the successful delivery of the Bheri–Babai Diversion

Tunnel. Upon completion and operation the project has

significantly advanced the optimal allocation of water

resources across river basins in Nepal and upgraded

modern agricultural irrigation systems. It supports the

development of an integrated livelihood corridor combining

water diversion irrigation and power generation promoting

stable agricultural output and income growth reliable clean

energy supply and improvements in the regional ecological

environment thereby injecting new momentum into Nepal’s

economic and social development.

91Jointly Building Harmonious Communities with People-Centered Commitment

CREC assists in the judicial infrastructure construction in

Tanzania marking new constructive achievements in the

joint construction of the "Belt and Road Initiative" between

China and Tanzania

The first green building in Fiji constructed by China Railway

First Group was officially opened recently in the capital

Suva; as the first green-certified building in Fiji its design

integrates multiple sustainable development technologies

including an integrated energy system a rainwater

harvesting system and smart building management

technologies.The "Water Tower of Life" in the Desert: CREC Helps Senegal Solve the

Case Century-old Drinking Water Challenge

China Railway Seventh Group constructed a 3200-cubic-meter water tower in Sanar Village Senegal; as the

core project of the Saint-Louis water supply system located 300 km away from Dakar it effectively solves the

drinking water safety issues for thousands of local residents and the University of Saint-Louis constructing

a complete water supply network. The project started in 2021 and was completed in 2025; its main structure

passed the acceptance on the first attempt and the project team actively cultivated local talents earning

high praise from the Director of the National Water Bureau of Senegal. This "small and beautiful" livelihood

project connects the terminal ends of water supply vividly illustrating the profound friendship of China-Africa

infrastructure cooperation during the construction of the "Belt and Road Initiative".

922025 Environmental Social and Governance Report and Sustainability Report

Impact Risk and Opportunity Management

The Company establishes a full-cycle impact assessment mechanism for overseas projects that makes impact

assessment a prerequisite procedure for project decision-making and systematically conducts two-way impact research

and judgment namely the Company assesses the two-way impacts of the project on the economic society livelihood

employment and ecological environment of the host country to maximize the positive value of the project and formulate

mitigation plans for potential negative impacts in advance; internally the Company researches and judges the impacts of

changes in international situations and market environments on its operations finance and brand and establishes tiered

assessment standards and response mechanisms thereby providing core bases for grasping opportunities and preventing

and controlling risks.The Company establishes a full-chain risk prevention and control mechanism of "front-end research and judgment in-

process control and post-event closed-loop management" and implements tiered classified and penetrating control over

core risks: regarding geopolitics and market operation risks the Company strengthens front-end admission research and

judgment of projects standardizes full-process operation management and optimizes the global market layout; regarding

work safety and performance compliance risks the Company normally carries out hazard inspections and rectifications

and constructs a full-process performance compliance supervision system to achieve closed-loop management of

problems and hazards; regarding overseas social security risks the Company strictly implements security management

measures and emergency plans and establishes risk monitoring and emergency linkage mechanisms to guarantee the

safety of overseas institutions and personnel; and regarding compliance operation risks the Company continuously

improves the compliance management system and embeds compliance reviews into the full business process to strictly

guard the baseline of compliant operations.The Company establishes a normalized mechanism for researching judging and transforming opportunities and

systematically uncovers core development opportunities based on the results of impact research and judgment: First it

grasps the policy opportunities brought by the deepening and upgrading of the high-quality joint construction of the "Belt

and Road Initiative" precisely connects with the infrastructure needs of countries along the routes and seize the windows

for the implementation of major projects; second it grasps the opportunities from the structural upgrading of the global

infrastructure market and expands into emerging tracks such as green and low carbon and digital intelligence based

on the advantages of the entire industry chain; third it grasps the opportunities from the international development of

Chinese standards and promotes the full-chain overseas expansion of technologies standards equipment and brands

to enhance international core competitiveness; fourth it grasps the long-term development opportunities brought by

localized operations deeply integrates into the development of host countries and consolidates the long-term market

foundation. Concurrently it establishes tracking supervision and review mechanisms for opportunity transformation to

drive the efficient transformation of opportunities into development momentum.Indicators and Targets

Targets

Achieve new results in deep integration into the high-quality joint construction of the "Belt and Road

Initiative" build a batch of key connectivity projects and high-quality flagship livelihood projects and

continuously enhance the influence of international brands.Realize steady growth in international business revenue and profits achieve breakthroughs

in strategic key markets and significantly strengthen overseas localized operational

capabilities.Maintain 0 occurrences of major overseas risk events achieve a 100% rectification closure rate for risk

hazards and keep overseas business risks generally controllable.Continuously improve the international operation system make new progress in building a high-quality

overseas professional team and steadily enhance core competitiveness.

93Jointly Building Harmonious Communities with People-Centered Commitment

Ranked 2nd among the Top 250 Global Engineering Contractors

Ranked 14th among the Top 250 International Engineering Contractors

Won 2 Gold Awards and 2 Silver Awards in the 2025 International Tunnelling and

Underground Space Association (ITA) Tunnelling Awards

Hungary-Serbia Railway: Drawing a "Golden Bond" for Mutually Beneficial Development

Between China and Hungary was rated as an Excellent Case in the "Cultural

Integration and Value Co-creation" category of the 2025 (8th) China

Enterprise International Image Construction

Indicators

Provide services to 100+ countries and regions globally

Have thousands of construction-in-progress projects globally

30 secondary units of the Company conducting overseas business

More than 20000 employees engaged in overseas business

The Company has achieved "seven consecutive increases" in the value of new

overseas contracts and operating revenue

942025 Environmental Social and Governance Report and Sustainability Report

Fostering Employee Growth

CREC deeply implements the strategy of strengthening the enterprise through talents consistently regards employees

as the core driving force for development respects their principal status improves the protection of their rights and

interests builds platforms for their growth and provides channels for training and promotion; it drives employees and

the enterprise to share the same mind and direction forge ahead together and build and fulfill their dreams thereby

consolidating synergy for high-quality development.Standardizing Employee Recruitment

The Company strictly complies with national laws and regulations related to In 2025

labor and employment formulates and implements systems such as the Talent

Introduction Management Measures of CREC and ensures the standardized

operation of the full recruitment process through institutionalized construction. Total number of employees

The Company consistently adheres to the principle of equal employment

resolutely eradicates employment discrimination based on factors such as 289250 persons

gender nationality race religious belief and marital and family status sets no

age or health thresholds unrelated to the post and always takes post suitability

professional capability and comprehensive literacy as the core employment

criteria striving to create a fair just and competitive recruitment environment.The Company constructs diversified talent introduction channels such as

organizational selection open recruitment recruitment of college graduates and

selective conversion of outstanding dispatched workers; focusing on introducing

urgently needed talents high-level professional and technical talents and core

management talents the Company continuously optimizes the age profession

and level structures of the talent team. Relying on the CREC recruitment

management information system the Company achieves online closed-loop

management of the full recruitment process effectively enhancing the efficiency

fairness and transparency of recruitment work. By the end of 2025 the total

number of the Company's employees reached 289250 with the size of the

talent team remaining stable and its structure being continuously optimized.CREC No.4 Engineering Group's campus recruitment session

95Jointly Building Harmonious Communities with People-Centered Commitment

Total Number and Proportion of Employees by Category

4778056559

17%20%

By 241470 117043

By Age

Gender 83% 115648 40%

40%

Female employees Male employees Under 35 years old 35-50 years old

Over 50 years old

168984385764

5.84%0.15%2%

83500

By Education 28.87% 283486

188414 Background By Region 98%

65.14%

College degree and below Bachelor's degree Domestic Overseas

Master's degree Doctoral degree

5693857115

19.68%19.75%

17519

By Employee

6.06% Category 85681

7199729.62%

24.89%

Assistant-level professional titles Clerical level and below

Intermediate professional titles Senior professional titles

Other levels (including senior professionals)

962025 Environmental Social and Governance Report and Sustainability Report

Protecting Employee Rights and Interests

The Company strictly complies with laws and regulations such as the Labor Law of the People's Republic of China and the Trade

Union Law of the People's Republic of China upholds the philosophy of equal employment strictly abides by laws and regulations

prohibits employment discrimination and ensures that laborers are not treated differently due to factors such as gender race

and age; it earnestly implements the principle of equal pay for equal work guaranteeing fairness in compensation distribution

for employees; meanwhile the Company establishes a fair and transparent promotion mechanism provides equal career

development opportunities for employees enhances employees' skill levels through a systematic training system and creates a

workplace environment of fair competition; furthermore the Company attaches importance to safeguarding the personal dignity

of laborers creates safe and healthy working conditions and protects the legitimate rights and interests of employees. The

Company resolutely boycotts and opposes any form of child labor and forced labor; during this reporting period no incidents of

using child labor or forced labor were found.The Company earnestly implements the Labor Law of the People's Republic of China the Labor Contract Law of the People's

Republic of China and strengthens contract management adhering to the principles of law-based compliance consensus through

consultation risk prevention and innovative development; it lawfully signs labor contracts with all hires clarifying the rights

and obligations in terms of labor protection labor remuneration insurance and benefits and professional ethics as well as the

standards and procedures for contract modification rescission termination and renewal; it strictly executes contract clauses and

continuously strengthens the full-process management of labor contracts. The overseas institutions and projects of the Company

formulate localized labor management systems in accordance with local labor laws and social security laws and standardize the

requirements in all links such as local employee recruitment contract signing social security payment attendance management

leave systems compensation standards and dismissal processes.The Company earnestly executes the Regulations on Paid Annual Leave for Employees and other various leave regulations

and employees lawfully enjoy rights to annual leave sick leave marriage leave and bereavement leave. In light of production

and operations especially the actualities of frontline project departments the Company adopts flexible and diverse forms and

measures such as rotational rest compensatory time off reverse family visits payment of subsidies and extended holidays

during major festivals to coordinately arrange employee rest and leave and implements a system of leave day notification and

annual settlement. The Company formulates and implements the Guiding Opinions on the Management of Compensation and

Leave for Overseas Employees guaranteeing the leave rights and interests of overseas employees. Implementing the relevant

requirements of the Ministry of Human Resources and Social Security on implementing the special working hour system the

Company earnestly executes the Working Hours and Leave Management Measures lawfully and compliantly strengthens

working hours management and implements the special working hour system for posts that meet the prescribed conditions upon

application thereby earnestly safeguarding the rights and interests of laborers.Optimizing Compensation and Benefits

In accordance with national laws and regulations the Company continuously improves the market-oriented compensation

distribution mechanism comprehensively implements the overall requirement of "wages rise when benefits rise and wages fall

when benefits fall" and drives the total wage bill to be deeply linked with the enterprise's economic benefits and input-output

efficiency achieving scientific control and dynamic adjustment of the total wage bill.The Company continuously deepens the reform of the internal income distribution system standardizes the management of

special rewards allowances subsidies and benefits and steadily advances the construction of medium- and long-term incentive

mechanisms such as equity incentives for listed companies equity and dividend incentives for technological enterprises and

excess profit sharing; it continuously expands the incentive coverage and constantly enhances the precision orientation and

effectiveness of incentives. The Company adheres to skewing compensation distribution towards high-performing units core

groups and frontline hardship posts and focuses on intensifying incentives for scientific research cadres overseas personnel

and industrial workers. The Company continuously optimizes the compensation structure and assessment mechanism for senior

executives deeply links their compensation levels with the enterprise's overall operating performance the effectiveness of the

work they are in charge of and the results of their personal performance assessments and incorporates core binding indicators

such as scientific and technological innovation safety and quality ecological and environmental protection and informatization

management into the assessment system achieving bidirectional unity of incentives and constraints.The Company lawfully pays the "five insurances" namely basic endowment insurance basic medical insurance work-related

injury insurance unemployment insurance and maternity insurance in full and on time for all active employees consolidating

the baseline of statutory security. The Company establishes and improves the enterprise supplementary medical insurance

system encourages employees to participate in group long-term critical illness supplementary medical insurance and provides

full-cycle health and medical security for employees. The Company strictly implements relevant policies on enterprise annuity

establishes a dynamic annuity adjustment mechanism matching the development of the enterprise and continuously improves

the supplementary endowment security for employees.

97Jointly Building Harmonious Communities with People-Centered Commitment

Promoting Democratic Management

The Company continuously improves and implements the enterprise democratic management system taking the employee

congress as its basic form constantly deepens work such as the employee congress transparency of factory affairs and

employee directors and earnestly guarantees employees' rights to know participate express and supervise. In 2025 the

Company held the 2nd session of the 4th employee congress and successfully completed the agendas according to procedures

including reviewing the administrative work report the report on the collection and handling of proposals and the report on the

performance of the collective contract as well as democratic appraisal of leaders and employee directors and supervisors and

the signing of the collective contract. Regarding the proposals collected deliberated and established at this employee congress

"one reply for one proposal" was achieved with a proposal completion rate of 100%. Two joint meetings of the employee congress

were held during the year which reviewed and passed relevant systems such as the Enterprise Annuity Management Regulations

of China Railway Engineering Group Limited the Measures for the Management of the Total Wage Bill of Secondary Enterprises

of CREC and the Provisions on the Management of the Work of Employee Directors of CREC fully guaranteeing the standardized

and effective exercise of employees' democratic rights during the intersessional periods of the employee congress.The Company continuously unblocks the channels for employees'

appeal expression and rights protection services formulates and

issues institutional documents such as the Management Regulations

on the Disposal of Clues for Employee Rights Protection of the Trade

Union of CREC upgrades and improves the internal "12351" employee

rights protection service platform and establishes a full closed-loop

management mechanism of "appeal acceptance - supervision and

transfer - rectification and implementation - feedback and return visit";

by responding to and resolving employees' reasonable appeals at

the first time the Company strives to construct a harmonious stable

mutually beneficial and win-win new type of labor relations. China Railway No.3 Engineering Group Holds 2025 Work Conference and the Fifth Session of the Sixth Staff Congress

Building Development Platforms

The Company deeply implements the strategy of strengthening the enterprise through talents In 2025coordinates and advances the construction of "six talent teams” and provides a solid talent

guarantee and intellectual support for the high-quality development of the enterprise assisting

the enterprise in preempting the initiative and winning advantages in the fierce market Number of National Model

competition. The Company's independently developed "Competency Model for Officers and Workers

Talents" won the Outstanding Achievement Award in the SASAC's 2025 Smart Supervision

Business Model Innovation Activity marking the accelerated progression of talent management persons

towards digitalization and intelligentization and providing a solid talent guarantee for the high- 17

quality development of the enterprise.Winners of China Youth May

The Company actively constructs a diversified training system featuring "online + offline" Fourth Medal and the New

"practical empowerment" and "cross-regional exchange"; striving to enhance both the political

literacy and business capabilities of employees and synchronously promoting the broadening Era Youth Pioneer Award

of vision and innovation of thinking the Company builds a systematic empowerment and

growth platform to comprehensively cultivate high-quality compound talents. 5 individuals 1 collective

The Company resolutely executes the professional title assessment system and unblocks

the development channels for professional and technical personnel. The Company has Winners of National

established promotion and assessment committees for professional and technical personnel in Civilized Units

multiple series including engineering accounting economics and political work and conducts

qualification assessments for personnel applying for senior professional and technical titles

in the aforementioned series according to the relevant regulations of the Company. In 2025 7 units

6021 persons passed the assessment for senior professional titles and 365 persons for senior

technicians and above in the Company.Number of national-level

The affiliates of the Company extensively and deeply carry out activities such as skill training master artisans

post practice and technological competitions to continuously enhance the overall quality of

technical and skilled talents; the Company attaches importance to discovering innovative and

craftsman-type outstanding talents sets up benchmarks and models through the selection 5 persons

and recommendation mechanism and stimulates the innovative vitality of talents. In 2025 6

persons passed the assessment for chief technicians 67 persons for special-grade technicians

and 292 persons for senior technicians in the Company.

982025 Environmental Social and Governance Report and Sustainability Report

Case China Railway No. 10 Engineering Group Constructs a "Cultivation

Selection Employment and Assessment" Talent System

China Railway No. 10 Engineering Group constructs a new integrated talent cultivation system of "education

selection employment and assessment"; focusing on capability enhancement it carried out over 320

training sessions throughout the year covering 14300 persons and achieving full coverage of key posts.By strengthening top-level design it constructs a vertical and horizontal synergistic talent cultivation

pattern and precisely cultivates urgently needed talents through "order-based classes" school-enterprise

cooperation and new skills training such as intelligent construction.Case Industrial Workforce Development

On June 20 2025 the CREC's Conference on Deepening Industrial Workforce Development Reform was

held in Zhoushan Zhejiang. The event released the CREC's Industrial Reform Implementation Guide and

promotional materials while providing an official interpretation of the Implementation Plan for Deepening

Industrial Workforce Development Reform.Case Mentorship Program

CREC No. 9 Group actively implements a mentorship system selecting business experts as mentors to

impart skills and experience through hands-on guidance. This initiative precisely addresses new employees'

developmental needs accelerating their integration into the Company and mastery of job competencies.Under mentors' dedicated coaching a cohort of new employees has rapidly grown into core technical cadres

at project sites injecting fresh vitality into the Company's high-quality development.

99Jointly Building Harmonious Communities with People-Centered Commitment

Case The 4th Employee Post Competency Competition

In November 2025 CREC held the expressway operation skills event of the 4th Employee Post Competency

Competition with 17 representative teams and 119 frontline skilled cadres from 6 operating units

participating. Centered around core post capabilities such as monitoring road property inspection and

electromechanical engineering the competition tested employees' professional literacy and standardized

operational levels further strengthening the standardization and specialization capability construction of

the operation sector.Case Leadership Development Training

In June 2025 CREC No.3 Engineering Group's Young Cadres Leadership Enhancement Program was

successfully conducted at the China Railway Party School with 34 young cadres from subsidiaries

completing all coursework and graduating. This program represents a key implementation of the "Talent-

Driven Enterprise" strategy by CREC No.3 Engineering Group's Party Committee and a crucial initiative for

building a high-caliber young leadership team.

1002025 Environmental Social and Governance Report and Sustainability Report

Indicator Data Unit

Male 83.5 %

Proportion of trained employees by gender

Female 16.5 %

Senior management 573 persons

Number of trained employees by employee Middle management 8700 persons

category General management 116000 persons

Frontline staff 163977 persons

Male 160 hours

Average training time by gender

Female 150 hours

Senior management 190 hours

Middle management 185 hours

Average training time by employee category

General management 150 hours

Frontline staff 140 hours

Total annual training investment 37896.8 RMB 10000

Number of training sessions conducted 1600 times

Total number of employees trained 289250 persons

Employee training coverage rate 100 %

101Jointly Building Harmonious Communities with People-Centered Commitment

Safeguarding Physical and Mental Health

The Company normalizes the organization of annual health examinations for all employees In 2025

to timely grasp their physical conditions; by achieving early detection early intervention

and early treatment of potential health risks it prevents the occurrence of major diseases

from the source and earnestly fortifies a shield for employees' physical health. In 2025 the Coverage rate of health

coverage rate of health examinations for the Company's employees reached 100%. examinations for the

The Company continuously deepens the Employee Assistance Program (EAP) focusing Company's employees

on employees' core needs such as workplace stress relief emotion management setback reached

coping and career development it normally carries out specialized humanistic care

and psychological counseling services to help employees scientifically cope with various 100%

challenges in work and life thereby escorting employees' mental health. In 2025 the

Company additionally equipped 61 Automated External Defibrillators (AEDs) for the

plateau railway project launched a special pilot for overseas employee health security

and newly cultivated 40 EAP psychological assistance cadres; by continuously shoring up

shortcomings in frontline emergency health security and strengthening the professional

psychological service team it deepens and solidates the employee health protection.China Railway Materials Trading

Luban Commerce Company organised

a “One Painting One Story” workplace

event for Mid-Autumn Festival

OH Card stress management training

during the employee health care

activity of CREC

CREC No. 4 Engineering Group

Southern Xinjiang Science

Popularisation and Cultural ComplexProject carried out the “Health Check-ups at Construction Sites BringingCare to Frontline Builders” initiative

1022025 Environmental Social and Governance Report and Sustainability Report

Case China Railway First Group Advances Employee Mental Health Service Work

China Railway First Group carried out the "Delivering Mental Health Services to the Primary Level" activity;

focusing on employees' concerns and enterprise development needs it developed 5 courses on themes of

positive psychology emotion regulation stress relief parent-child education and female. The Company

connected with the Shaanxi Provincial Federation of Trade Unions and carried out a total of 50 mental

health service activities throughout the year covering nine provinces; among them the group company

dispatched instructors for 42 sessions and the provincial federation of trade unions delivered 8 sessions

serving a total of 5000 persons of frontline employees.A total of Dispatched instructors for Served a total of

50 mental health service 42 sessions 5000 frontline

activities throughout the year employees

Case Firefly Employee Care Activity of China Railway Wuhan Electrification

Engineering Group

China Railway Wuhan Electrification Engineering Group carried out a care month activity themed "Faint

Light of Fireflies Guarding and Accompanying". Relying on a team of 1 supervisor 9 internal trainers

and 48 health committee members the Company carried out 7 "You Order We Deliver" EAP-into-projects

activities serving over 1500 persons; it established 45 spiritual havens achieving a psychological care

coverage rate of over 90% and a satisfaction rate exceeding 98%.EAP served over Established Psychological care coverage Satisfaction rate

rate of over exceeding

1500 45 "spiritual havens" 95% 98%

persons

103Jointly Building Harmonious Communities with People-Centered Commitment

Deepening Employee Care

Adhering to the employee-centric development philosophy and deeply practicing the people-oriented development concept the

Company takes the Implementation Opinions of CREC on Care Services Throughout the Entire Process of Employees' Careers

as the overall guidance to construct a full-cycle multi-level wide-coverage and warm employee care system; by integrating

the enterprise's warm care into the full process of employees' career development it earnestly enhances the sense of gain

happiness and security of the vast number of employees.The Company fully implements the requirements for providing full life cycle care services to employees. Every year it invests

nearly 800 million yuan in trade union funds to focus on key milestones throughout employees’ career development including

onboarding and trade union membership relationship building and courtship marriage and family formation children’s education

medical treatment and hospitalization as well as retirement and departure. It delivers all-round and inclusive care services to all

employees ensuring that corporate care covers every important stage of employees' growth.On the basis of inclusive care the Company continuously constructs a multi-level security system integrating basic social security

enterprise supplementary security and employee mutual assistance security; it normally carries out distinctive brand condolence

activities such as "delivering warmth in winter and coolness in summer" and synchronously establishes a special precise

assistance fund thereby building a solid bottom-line security defense line for the group of employees in difficulties and tightly

weaving the people's livelihood security network for the harmonious and stable development of the enterprise.In 2025 the Company distributed a total of RMB 327 million in condolence payments and relief funds throughout the year and

visited and consoled employees and migrant workers for 420000 persons; it carried out educational assistance for the children of

employees in difficulties funding 3708 employees' children; focusing on precisely implementing policies for groups with special

difficulties it provided bottom-line assistance to 331 families of employees in extreme difficulties and 21 employees with major

diseases earnestly relieving the difficulties of and providing timely help to employees in need.Furthermore the trade union of the Company continuously promotes the upgrading of frontline care positions and invested

a special fund of RMB 2.5 million to support 50 primary-level projects in creating "Happy Homes"; by continuously improving

the working and living conditions of frontline employees and delivering warm care to project frontlines and employees' sides it

earnestly enhances the sense of belonging and happiness of frontline employees.In 2025

Distributed a total of Visited and consoled Financially supported Provided assistance to

RMB 327 million in 420000 3708 331 families of

condolence payments and employees and migrant employees' children employees in extreme difficulties

relief funds workers

Case China Railway No. 9 Engineering Group Carries Out Delivering Warmth in

"Two Festivals" Activity in 2025

The trade union of China Railway No. 9 Engineering Group themed "Warming Employees with True Affection

Jointly Creating a Happy Enterprise" carried out a delivering warmth activity during the New Year and Spring

Festival; it focused on caring for employees suffering difficulties due to major diseases accidents or children's

education advanced model workers frontline employees sticking to their posts during the holidays and

families of overseas employees. Combined with primary-level research the Company's leaders conducted visits

and condolences allocated special funds of RMB 4.1 million and went deep into remote projects families in

difficulties and key engineering sites to convey organizational care through forms such as door-to-door visits

video connections and family symposiums. Furthermore the Company carried out assistance for migrant workers

returning home and condolences for those on duty and organized the "Heart-to-Heart Volunteer Service Team" to

provide door-to-door services for special groups cumulatively consoling 15000 employees and migrant workers

across over 180 projects.Allocated special funds of Visited and consoled migrant workers across over Consoled a total of

RMB 4.1 million 180 projects 15000 employees

1042025 Environmental Social and Governance Report and Sustainability Report

Employee Condolences

"Care Accompanies China Railway No. 5 Stays with You" delivering coolness in summer activity jointly held by the Party

committee administration trade union and Communist Youth League of China Railway No. 5 Engineering Group

Festival Activities

Mother's Day activity of China Railway First Group Spring Festival Carnival activity of China Tiegong Investment

& Construction Group

Care for Employees' Children

China Railway Construction Engineering Operations Summer daycare class for employees' children of China

Company “Nuode Little Sprouts” Family Day Event Railway No. 10 Engineering Group

105Jointly Building Harmonious Communities with People-Centered Commitment

Young Employee Matchmaking

China Railway Major Bridge Engineering Group Eighth Engineering Picture: 2025 collective wedding of China Railway No. 4

Company hosts "Meeting You Bridging Love" youth social event Engineering Group

Cultural and Sports Activities

1062025 Environmental Social and Governance Report and Sustainability Report

Deepening Exchange and Cooperation

CREC consistently adheres to open cooperation and mutual benefit and deepens government-enterprise synergy to drive

policy implementation and effectiveness; it strengthens enterprise-enterprise linkage to promote synergistic win-win

results in the industry chain; and it deepens school-enterprise cooperation to advance the deep integration of industry

academia research and application. At the same time the Company continuously optimizes supply chain management

actively participates in the formulation of industry standards deepens external exchange and cooperation and goes all

out to construct a diversified synergistic mutually beneficial and win-win industrial ecosystem.Participating in Standard Formulation

The Company deeply implements the National Standardization Development Strategy by constructing a multi-tier system

covering international national and industry standards. It actively leads and participates in the formulation and revision

of standards across all infrastructure fields continuously transforming technological innovation achievements and

engineering practices into industry norms. This not only guides the high-quality development of the domestic industry

with high standards but also promotes Chinese standards globally consistently enhancing our international discourse

power in the sector.● National Standard Internet of Things—Logistics Park—part 1: General Requirements for Application

China Railway System

Material Trade

Group ● Group Standard Maturity Evaluation Indicators for Green Supply Chain Management (T/CFLP0077-

2025)

● International Standard IEC SRD 63302-2:2025 Smart City Use Case Collection and Analysis – Intelligent

Operations Centre for Smart Cities – Part 2: High-Level Analysis

China Railway ● International Standard IEC SRD 63302-1:2025 Smart City Use Case Collection and Analysis - Smart

Liuyuan Group City Intelligent Operations Center - Part 1: High-level Analysis

● International Standard IEC 63453:2025 Railway Applications - Current Collection Systems - Validation

of Simulation of The Dynamic Interaction Between Pantograph and Overhead Contact Line

Emphasizing International Exchanges

The Company actively participates in international expos and global industry exhibitions to comprehensively display its

full-industry-chain advantages and innovation achievements in infrastructure construction; by broadly connecting with

global partners and deepening technological exchanges and industrial cooperation it drives the integrated overseas

expansion of Chinese technologies standards equipment and solutions continuously enhances global brand influence

and joins hands with global partners to achieve mutual benefits and win-win results.

107Jointly Building Harmonious Communities with People-Centered Commitment

Case The 8th China International Import Expo

In November 2025 CREC participated in the 8th

China International Import Expo and displayed a

comprehensive digital and intelligent sandbox

presenting the achievements in coordinated

urban and rural regional development and major

infrastructure construction through 5 landmark

projects. This exhibition reflected the Company's

innovative practices in digitalized management and

comprehensive engineering display capabilities

further demonstrating the Company's industry

influence in the fields of infrastructure construction

and digital and intelligent applications.Case The 12th World Congress on High-Speed Railway

In July 2025 CREC intensively displayed more than 20 sets of independently developed intelligent

equipment at the 12th World Congress on High-Speed Railway comprehensively presenting the full-chain

technological system of "digital and intelligent survey - intelligent construction - smart operation" and

demonstrating its industry-leading position in the fields of intelligent construction and equipment R&D.Case China Railway Beijing Engineering Group. Was Invited to Participate in the

2025 inter airport China

China Railway Beijing Engineering Group. was invited to participate in the 2025 inter airport China

displaying its smart construction site platform and digitalized construction technologies and demonstrating

its scientific and technological strength in the field of airport construction. The enterprise possesses "four

special-grade" qualifications and the first-grade qualification for airport runways; it has participated in the

construction of over a hundred domestic and international airports covering multiple professional chains.As a demonstration unit for the construction of "four models" of civil aviation airports the Company takes

the lead in achieving full-cycle BIM applications and has built the first "digital twin" airport in China driving

the synergistic development of intelligent construction and the airport economy and continuously leading

industry innovation.

1082025 Environmental Social and Governance Report and Sustainability Report

Strengthening Diversified Cooperation

Focusing on its main responsibilities and primary businesses the Company continuously strengthens multi-dimensional

cooperation with governments enterprises and universities to promote complementarity of advantages and resource

integration.Government-enterprise cooperation

Centered around key fields such as transport infrastructure urban renewal ecological protection and energy

development it constantly expands cooperation spaces and elevates cooperation levels to drive regional economic and

social development.CREC deepened strategic cooperation with Yunnan CREC signed Strategic Cooperation Agreement with

Province Tangshan Municipal People's Government

Enterprise-enterprise synergy

Focusing on major project linkage industry chain synergy and financial service innovation the Company deepens

cooperative relationships and constructs a new ecosystem of synergistic development assisting all parties to preempt

the initiative in market competition and grow together.CREC deepened strategic cooperation with China National Gold CREC Signed Strategic Cooperation Agreement with China

Group Co. Ltd. COSCO Shipping Corporation Limited

109Jointly Building Harmonious Communities with People-Centered Commitment

School-enterprise co-integration

Jointly building an industry-academia-research platform to promote technological R&D and achievement transformation

and to overcome industry challenges. Through models such as order-based cultivation internship and practical training

and joint scientific research the Company constructs a collaborative education mechanism promotes the deep

integration of the education and talent chains with the industry and innovation chains and precisely delivers high-quality

talents.China Railway Group Limited Signed Strategic Cooperation China Railway Group Limited Established Long-term In-depth

Agreement with Tsinghua University Cooperation with Southwest Jiaotong University

1102025 Environmental Social and Governance Report and Sustainability Report

Strengthening Supply Chain Collaboration

Taking the construction of a full-process supplier management system as a lever the Company deepens the full-chain

synergistic linkage of the supply chain deeply integrates the ESG philosophy into the full process of procurement

management fortifies the defense line for supply chain safety and stability and builds a compliant transparent mutually

beneficial and win-win responsible supply chain.Governance

The Company established a supply chain management governance system characterized by clearly defined authorities

and responsibilities and high operational efficiency comprehensively embedding ESG risk control requirements into

business processes and decision-making mechanisms. It clarified the Production Supervision Center as the centralized

management department responsible for guiding and supervising procurement and supply chain management work

across the entire system and carrying out full-process guidance and supervision over the Company's centralized

procurement business. Strictly according to national laws and regulations it formulated and implemented core systems

such as the Procurement Management Measures Supplier Management Regulations and the Strategic Procurement

Management Regulations providing solid institutional support for supply chain compliance management and risk

prevention and control.Strategy

The Company comprehensively integrates sustainable development philosophy into its supply chain management

strategy; taking digital upgrading and cooperative ecosystem construction as grasps it builds a risk-sharing and benefit-

sharing supply chain system supporting the high-quality development of the enterprise and the synergistic sustainable

development of upstream and downstream partners. Strictly according to Comprehensive Risk Management Measures

it advanced the full-cycle control of supply chain risks; in 2025 it released the annual major risk assessment report

clarifying supplier-related risk items and key control points and implementing tiered control responsibilities.Supplier ESG Management

Through contract clauses the Company clarified the requirements for suppliers to fulfill social responsibilities and focused

on carrying out full-process supervision and guidance around the three dimensions of labor safety protection of migrant

workers' rights and interests and environmental protection.Labor safety and occupational security

Requiring suppliers to implement occupational safety and health security measures increase safety

investments improve safety facilities normally carry out safety training lawfully pay work-related injury

insurance and accidental injury insurance in full for migrant workers strictly prevent safety accidents and

reduce occupational hazards.Maintenance of migrant workers' rights and interests

Requiring suppliers to strictly implement regulations on the payment of migrant workers' wages execute

systems such as dedicated wage accounts deposits and wage distribution by general contractors on behalf

of others and ensure that wages are paid in full and on time; comprehensively implementing the real-name

employment system standardizing the signing of labor contracts and protecting the legitimate rights and

interests of migrant workers.Environmental protection

Setting special environmental protection clauses in contracts requiring suppliers to strictly abide by

environmental protection laws and regulations and comprehensively implement prevention and control

requirements for pollutants such as atmosphere water soil and noise.Meanwhile during the supplier admission stage the Company carries out special training on labor rights and interests and

environmental protection normally organizes publicity and education annually and strengthens responsibility awareness

through manuals and online courses; adhering to transparent procurement and promoting integrity co-construction it builds

a clean and upright cooperative ecosystem by signing integrity clauses issuing notices and holding symposiums.

111Jointly Building Harmonious Communities with People-Centered Commitment

Transparent Procurement

The Company built the CREC e-commerce procurement platform (CREC Luban E-commerce Network) constructed

a full-process transparent procurement system and launched the risk prevention and control center to achieve

closed-loop management of pre-event reminders in-process warnings and post-event rectifications for procurement

risks driving compliance control to be deeply embedded into business processes. Relying on intelligent tools such

as the "Lu Xiaobao" large model and the "Document Checking Assistant" the platform automatically identifies

non-compliant content in bidding documents achieving a transition in risk control from "human monitoring" to

"technological prevention" and enhancing transaction fairness and risk prevention and control capabilities.In 2025 the platform built a master data intelligent matching model and integrated historical data with national and

industry standards to form a knowledge base enhancing the precise search capability for core materials; it launched

the "Smart Bidding" tool to achieve standardization of the bidding process and reduce human intervention while

synchronously exploring the "Assisted Bid Evaluation" agent to optimize the review model through AI empowerment.The platform integrates full-chain data achieving full-process traceability and controllable risks.By the end of 2025 the platform served 48 secondary companies and over 30000 projects with 563700 certified

suppliers and 143000 active suppliers; its annual transaction volume exceeded RMB 857.8 billion and its historical

cumulative transaction volume reached RMB 4.57 trillion.By the end of 2025

563700 143000 Annual transaction volume Historical cumulative exceeded transaction volume reached

Certified suppliers Active suppliers

RMB 857.8 billion RMB 4.57 trillion

Supplier Communication

To enhance supply chain management efficiency the Company systematically carried out special training for

supply chain talents covering the full procurement process risk and compliance management and the application

of frontier technologies thus building a compound professional talent team. It strengthened the supervision and

assessment mechanism for the full procurement process clarified assessment standards dynamically monitored key

nodes and established a responsibility traceability system guaranteeing the standardized and efficient operation of

procurement business.

2025 Special Training Class on Procurement and Whole Life-cycle Business Management and Safety Management of China

Railway Material Trade Group

1122025 Environmental Social and Governance Report and Sustainability Report

Case Supply Chain Ecosystem Conference

On August 7 2025 the Company held the Supply

Chain Ecosystem Conference inviting 131 suppliers to

participate; it released annual procurement demands

awarded plaques to 30 high-quality partners and

carried out special promotions around the Luban

Platform the JWW.com Platform strategic emerging

industries industrial products supply chain finance

and smart logistics. The conference promoted resource

integration assisted in constructing a new efficient

intelligent and sustainable supply chain ecosystem

for the construction industry and accelerated the

transformation of the Company into a digitalized

platform-type integrated service provider.Impact Risk and Opportunity Management

Taking the digitalized platform as a cornerstone the Company implemented systematic identification and penetrating

control of sustainable development risks in the supply chain; empowering sustainable procurement with science and

technology it precisely grasped the opportunities for supply chain transformation and upgrading achieving bidirectional

efforts in risk prevention and control and quality and efficiency improvement.Supplier Management Process

Supplier Admission

Establishing a sound supplier admission and evaluation management system the Company conducts

admission reviews for qualified suppliers focusing on examining suppliers' performance in integrity-

based operation work safety and environmental protection to strictly control source risks; suppliers

passing the review are included in the qualified supplier directory.Supplier Assessment

Regularly conducting comprehensive supplier reviews the Company comprehensively evaluates

supplier performance by combining daily evaluations during the performance process with annual

evaluations and incorporates the evaluation results into the annual assessment system. Based on

the evaluation model of the Luban Platform it conducts dynamic evaluations combining daily and

annual assessments to eliminate unqualified suppliers.Supplier Quality Management

In supplier process management the Company pays particular attention to newly selected suppliers

strictly implements system construction requirements and strengthens clauses such as safety and

quality in contracts with Tier-3 subsidiaries and operation centers conducting official briefings

on centralized procurement plans technical standards safety production responsibilities and

compensation mechanisms..Supplier Exit

Establishing a negative list of suppliers' bad behaviors the Company takes control measures such

as issuing warnings restricting bidding suspending cooperation or revoking qualifications against

suppliers with bad behaviors.

113Jointly Building Harmonious Communities with People-Centered Commitment

Case Supply Chain Financial Services of the JWW.com

The JWW.com under CREC provides users with financial services covering multiple forms such as bill

discounting and accounts receivable financing. Among them the "Jimiaotie" module achieves online

bill inquiry and one-click discounting through direct bank connection; in 2025 it completed 691 discount

transactions amounting to RMB 2.803 billion reducing financing costs by RMB 3.2766 million. The "Payment

Agency" module assists in the rapid realization of accounts receivable based on authentic transactions;

in 2025 it facilitated 397 financing transactions amounting to RMB 951 million realizing cash collection of

RMB 283 million for engineering bureaus. The two types of services effectively alleviated suppliers' financial

pressure improved turnover efficiency reduced transaction costs enhanced supply chain synergy and

assisted in the highly efficient linkage and win-win development of upstream and downstream partners in

the industry chain.Indicators and Targets

The Company implements classified and tiered management of suppliers identifying supply chain risks and opportunities

through processes such as admission and evaluation and tracking rectification through a combination of quantitative

and qualitative targets to achieve closed-loop management. Leveraging the Luban Platform the Company conducts

supplier satisfaction surveys and has established a full closed-loop mechanism for handling complaints and suggestions.Based on feedback it has formulated three improvement initiatives—optimising feedback nodes enhancing platform

functionality and strengthening intelligent services—using technology to streamline processes improve service efficiency

and continuously enhance the supply chain collaboration ecosystem.In 2025

Total number of suppliers Satisfaction rate reached

97966 suppliers 96%

1142025 Environmental Social and Governance Report and Sustainability Report

Building Harmonious Communities

CREC actively fulfills the social responsibilities of a central SOE and anchors the goal of building harmonious communities

characterized by extensive consultation joint contribution and shared governance; deeply integrating into the overall

development of domestic localities and overseas project host areas it makes continuous efforts in emergency rescue

and disaster relief rural revitalization public welfare assistance volunteer services and fulfillment of responsibilities in

overseas localities thereby earnestly benefiting community residents with enterprise development achievements and

joining hands to build harmonious and happy homes.Supporting Rural Revitalization

The Company deeply implements General Secretary Xi Jinping's important discourses on work related to agriculture rural

areas and farmers earnestly fulfills its assistance responsibilities orderly advances the implementation of various tasks

and solidly drives the effective connection between consolidating and expanding the achievements of poverty alleviation

and rural revitalization thereby continuously contributing China Railway's strength to promoting agricultural and rural

modernization and accelerating the building of an agricultural powerhouse. In April 2025 the Company held the annual

work conference on rural revitalization and counterpart support to study and discuss the 2025 fund usage plan and the

implementation scheme for key assisted construction projects; it clarified that centering on the theme of "five major

revitalizations" and focusing on the "four major events" of Tibet assistance it would select optimal assistance projects

strengthen training empowerment and deepen consumption assistance based on its own advantages and the resource

endowments of the assisted areas thereby accomplishing the annual objectives with high quality.Educational Support and Vocational Skills Training

The Company actively responds to the SASAC’s “Central SOEs Talent Development for Rural Revitalisation” initiative

combining motivation-building and capability-building and driving rural development through both education

empowerment and talent cultivation injecting sustainable momentum into rural development and supporting long-term

prosperity.The Company built a drone operation training base at Rucheng Vocational Middle School and established

urgently needed majors such as drones and surveying; with 57 students enrolled in the first session the

teaching results were remarkable it provided a channel for youths in mountainous areas to become

useful talents.Employment rate reached A total investment of

92.9% RMB 4 million

The "Good Driver of Baode" employment brand created in Baode County Shanxi Province adopted an

integrated assistance approach of "training - certification - employment"; by providing special driving

training assisting trainees in obtaining driver's licenses and recommending employment it has driven

over a thousand people to secure employment and significantly increased the average annual income per

household thus becoming a replicable model for skill-based assistance.From July 21 to 27 2025 CREC held the fifth training session on rural

revitalization in Xiamen and Longyan Fujian Province. A total of 45 township

officials and county-level department officials from Rucheng County and

Guidong County Chenzhou City Hunan Province and Baode County

Xinzhou City Shanxi Province participated in the entire training program.

115Jointly Building Harmonious Communities with People-Centered Commitment

Agricultural Support and Industrial Development

The Company leverages the resource endowments of assisted regions develops characteristic agricultural industries

tailored to local conditions and supports industrial revitalisation and increased farmer incomes through technology

introduction value chain extension and industrial integration.In continuously building the distinctive brand of Baimao Tea in Rucheng County Hunan

Province the Company added 30 mu of seedling bases and 1200 mu of high-standard

tea gardens in 2025 established a "parent-subsidiary trademark" system and explored

innovative models such as contract farming; the support case was selected into the Blue

Book on Environmental Social and Governance (ESG) for Listed Companies of Central

State-owned Enterprises.Focusing on the core shortcomings of "insufficient primary industry standardization and

weak secondary industry processing capability" in Guidong County Hunan Province

the Company constructed a full-chain system taking the cold-water rice industry as

a breakthrough point; synchronously introducing smart agricultural technologies to

empower the production end it built a characteristic industrial base for high-mountain

cold-water rice in Heping Terraces increasing the average yield per mu to 625 kilograms

representing a yield increase of over 20% compared to traditional planting models.The 5 MW Pioneer Photovoltaic Power Station invested in Baode County Shanxi Province

cumulatively generated 5.92 million kWh of electricity throughout the year generating

a revenue of RMB 2 million; it built 21000 mu of high-standard farmland benefiting 28

administrative villages across 5 townships.Infrastructure Construction and Livelihood Improvement

Fully leveraging its advantages in infrastructure construction the Company improved traffic conditions strengthened

human settlement environment governance and enhanced village appearances to assist in rural transformation; by

enabling villagers to genuinely experience the new changes of convenient transportation beautiful environments and

affluent lives it made a significant and profound contribution to the rural revitalization.The Yunyang District High-standard Farmland Project of China

Railway No. 10 Engineering Group solves the bottlenecks of mountain

agriculture through systematic construction

1162025 Environmental Social and Governance Report and Sustainability Report

Case Harmonious and Beautiful Rural Water Vein Guarding Plan

In December 2025 CREC and Xinhuanet jointly launched the "Harmonious and Beautiful Rural Water Vein

Guarding Plan" to improve rural water ecological environments and drive rural revitalization. The Company

is committed to significantly improving the water vein health conditions of 1000 villages between 2026

and 2030 and building 100 industrial revitalization demonstration points of "Beautiful Water Villages".Furthermore the Company is dedicated to cultivating a specialized rural water steward team of over

10000 personnel and systematically unearthing and disseminating rural water vein culture thereby driving

the comprehensive enhancement of rural ecological economic and cultural values.Deepening Assistance to Xinjiang and Tibet

Resolutely serving the national strategies of assisting Xinjiang and Tibet CREC deeply cultivates the border areas of

Xinjiang and Tibet; taking the primary business of infrastructure construction as its core it advances the construction of

major transport projects and livelihood projects such as education and medical care with high quality. Strictly guarding

the ecological protection red line during construction the Company actively drives local employment and cultivates skilled

local talents to fortify the foundation of border development thereby assisting coordinated regional development and

rural revitalization.In June 2025 the Tibet Autonomous Region

Hospital constructed by CREC was officially

opened in Lhasa; as one of the "Three

Major Livelihood Projects" supporting Tibet's

development i t mainly undertakes the

diagnosis and treatment of difficult critical

and severe diseases as well as emergency

rescue tasks for sudden public events across

the region achieving the goal of "treating

major diseases within Tibet".Since July 2022 CREC has invested a total of

RMB 76.75 million in counterpart assistance to

Karuo District Qamdo Tibet and dispatched

multiple officials on aid-Tibet missions; it

has focused on building and putting into

operation a batch of infrastructure and public

service facilities such as township schools and

health centers substantially improving the

production and living conditions of the masses

in agricultural and pastoral areas.China Railway participated in the construction

of China’s first “Gobi desert and arid region”

large-scale base outbound transmission

project—the Xinj iang Huadian Tianshan

Northern Foothills Base integrating wind

solar thermal power and energy storage into

a unified system transmitting 14.2 billion kWh

of green electricity to the Central China region

annually equivalent to reducing carbon dioxide

emissions by 11.72 million tons successfully

turning the Gobi Desert into an "energy oasis".

117Jointly Building Harmonious Communities with People-Centered Commitment

Case Earthquake Relief and Post-Disaster Reconstruction in Tingri County Tibet

On January 7 2025 a 6.8-magnitude earthquake On October 22 2025 the resettlement housing

struck Tingri County Tibet resulting in significant project in Cuo'ang Village Tingri County Tibet

casualties and the collapse of numerous buildings. assisted by CREC was comprehensively delivered

CREC promptly established a frontline headquarters and 104 disaster-affected households happily moved

for earthquake relief coordinated the resources into their new homes. Adopting the personalized

and personnel of its projects in Tibet and actively design of "one coordinate per household" and

mobil ized human and material resources for the model of "transparent construction + local

emergency rescue operations thereby ensuring part ic ipat ion" the Company synchronously

the basic living needs and a warm winter for the improved infrastructure such as roads water supply

affected population to the greatest extent possible. power supply and enclosing walls comprehensively

improving the living conditions of residents.

1182025 Environmental Social and Governance Report and Sustainability Report

Emergency Rescue and Disaster Relief

The Company attaches great importance to emergency management continuously advances the base construction

and equipment upgrading of the three national professional emergency rescue teams in Kunming Guiyang and

Tibet and coordinately handles personnel replenishment command system optimization coordination mechanism

improvement infrastructure supporting rule and regulation perfection training and drill strengthening and guarantee

system construction thereby significantly enhancing the bases' capabilities in professional rescue rapid mobility and

comprehensive guarantee. In 2025 the Company went all out in emergency rescue and disaster relief successively

participating in major rescue operations including the Tingri earthquake in Tibet the Myanmar earthquake and the

Junlian landslide in Yibin Sichuan Province earning widespread praise from leaders of the State Council SASAC the

Ministry of Emergency Management and various sectors of society.CREC actively participated in the emergency rescue of the landslide in Junlian Sichuan Province

CREC fully participated in flood control and emergency rescue in Miyun Beijing

receiving a letter of thanks from the Beijing Municipal People's Government

CREC fully supported the fire relief and resettlement in Tai Po Hong Kong

119Jointly Building Harmonious Communities with People-Centered Commitment

Practicing Public Welfare and CharityGuided by a spirit of care the Company actively practices volunteerism by carrying out the “Thousands of PeopleHundreds of Teams” volunteer service initiative. Activities focus on disaster relief donations student support during

examinations elderly care and assistance for persons with disabilities delivering warmth and support and contributing

positive energy to society. In 2025 the Company organised more than 1500 youth volunteer service activities with over

15000 participations by young employees and more than 30000 beneficiaries supported.The 2025 national “HundredS e s s i o n s o f A w a r e n e s s

Ca m p a i g n s o n Ca r e a n d

Protect ion of Left -Behind

Children Entering ConstructionSites” and the central SOEs’“Together Safeguarding theFuture” initiative were held at

a China Railway Construction

Engineering Group project site

China Railway No. 9 Engineering Group sponsored the "Civilization The youth service team of China Railway Sixth Group carries out

Practice in My Action" volunteer activity disability assistance activities

1202025 Environmental Social and Governance Report and Sustainability Report

During International Children's Day

volunteers from China Railway No.

4 Engineering Group went to the

Second Hospital of Anhui Medical

University to carry out condolence

act iv it ies donating over 260

loving gifts to hospitalized children

and engaging in companionship

communication and interactive

activities for which they were

awarded the "Loving Devotion

Award".China Railway Tunnel Group organized a team of youth volunteers to specially visit and console Wei Shijie the "elder of nuclear

weapons" who made outstanding contributions to China's nuclear arsenal cause.Safeguarding Cultural Heritage

The Company actively engages in the protection and inheritance of cultural heritage overcomes the technical difficulties

in the integration of cultural heritage protection and modern science and technology and innovatively applies scientific

protection methods providing a "CREC Solution" for inheriting Chinese civilization and enhancing cultural confidence.Case Scientifically Safeguarding Thousand-Year Buddhist Images and Continuing

the Bloodline of Bashu Civilization

Addressing the compound diseases of over 3000 Tang Dynasty

statues at the Qianfoyan Grottoes in Tongjiang the team of

China Railway Wenbao Technological Innovation innovatively

constructed a "four-in-one" scientific protection system; through

precise diagnosis targeted restoration digital preservation and

dynamic monitoring it achieves a balance between cultural

heritage protection and historical information preservation

allowing the thousand-year-old statues to regain their radiance.The team developed 2 national utility model patents and

formed relevant engineering technical reports assisting the The Qianfoyan Grottoes in Tongjiang after being

construction of the scientific and technological demonstration technically protected by China Railway Wenbao

base for grottoes in Sichuan and Chongqing. The project was Technological Innovation

rated as the only high-quality cultural relic protection project in

Sichuan Province in 2025 becoming a model for central SOEs in

safeguarding the roots of stone civilization.

121Jointly Building Harmonious Communities with People-Centered Commitment

Fulfilling Overseas Responsibilities

Adhering to the principle of extensive consultation joint contribution and shared benefits the Company injects

sustainable momentum into the development of host countries through measures such as employment promotion

technological empowerment talent cultivation emergency rescue and disaster relief volunteer services and ecological

co-construction thereby establishing the image of a responsible and accountable international enterprise.Case The "Demonstration New Village" in the DRC: CREC Assists Rural

Revitalization in the Democratic Republic of the Congo

Responding to the "Hundreds of Enterprises Aiding Thousands of Villages" initiative SICOMINES SARL under

CREC invested USD 14.4 million to build a comprehensive community integrating public facilities roads

water and electricity supply and industrial supporting facilities in Yinge Village. Once completed the project

will directly benefit nearly 200 households; by constructing a "planting-processing-breeding" industry chain

it cultivates the endogenous development momentum of the community and forms a sustainable rural

economic model.In terms of agricultural industry support by providing key means of production and transferring planting

technologies the Company effectively improved land output and farmers' income directly supporting the

livelihoods of about 250 households in 5 communities which generated tangible benefits for guaranteeing

community food security and enhancing agricultural resilience.In the field of health care the Company successfully built and delivered a brand-new hospital and a health

center to the community effectively reducing medical risks elevating the level of maternal and child health

and assisting vulnerable groups thereby overall enhancing the regional capabilities in primary surgical

diagnosis and treatment and maternal and child health care.Furthermore the Company improved the teaching environment and sanitary conditions for teachers and

students and enhanced the safety security and teaching functions of the campus exerting a sustainable

and positive effect on guaranteeing educational continuity maintaining campus safety and supporting

children's development.After the successful delivery of the project the Mayor of Idiofa subsequently awarded an honorary

certificate to the project team to commend their highly efficient execution and organizational capabilities.Furthermore the Dean of Kikwit Hospital also sent a letter of gratitude stating that the project will greatly

elevate the level of regional medical services.The "Revitalizing Agriculture in DRC and Benefiting Yinge Village" Dream Realization Action hired technical

experts to guide Yinge villagers in planting corn

1222025 Environmental Social and Governance Report and Sustainability Report

Adhering to localized operation China

Railway No. 9 Engineering Group employed

over 5000 African staff thereby creating

a large number of direct jobs for the local

communities. Meanwhile through mentorship

programs the Company transferred advanced

construction technologies and management

experience to foreign employees enabling

them to grow into technical cadres.The East Africa Company of China Railway

Construction Engineering Grouptrained

over 400 local technical personnel at the

project sites in Dar es Salaam and Dodoma

Tanzania driving the localized application of

Chinese technical standards overseas.The Dominica International Airport Project of

China Railway No. 5 Engineering Group held

the "Silk Road Youth Walking with China

Railway No. 5 Engineering Group Co. Ltd."

youth volunteer service action at the local

Portsmouth Secondary School.China Railway No. 2 Engineering Group

participates in earthquake rescue in

Mandalay Myanmar

123Future Outlook

Future Outlook

Standing at a new historical starting point as we embark on the journey of the "15th Five-Year

Plan" CREC will remain deeply committed to the nation's most critical priorities. With the goal

of building a world-class enterprise we will focus our efforts on forging a national champion

that shoulders significant responsibilities a trailblazer leading infrastructure development

an industry chain leader driving green transformation a globally respected multinational

corporation and a modern enterprise trusted by society. By actively fulfilling our mission

in supporting major national strategies advancing global infrastructure connectivity and

promoting harmony between humanity and nature we will continue to make new strides.CREC is dedicated to contributing its enduring strength to the sustainable development of the

economy and society as well as to shared prosperity around the world.

1242025 Environmental Social and Governance Report and Sustainability Report

Appendices

Appendix I: Key Performance Table

Indicator 2025 Unit

Scope 1 GHG emissions 6120704 tons of CO2 equivalent

tons of CO equivalent /

Scope 1 GHG emission intensity 0.06 2

RMB 10000

Scope 2 GHG emissions 8033268 tons of CO2 equivalent

Greenhouse tons of CO equivalent /

Scope 2 GHG emission intensity 0.07 2

Gas (GHG) RMB 10000

Total GHG emissions (Scope 1 + Scope 2) 14154000 tons of CO2 equivalent

tons of CO equivalent /

Total GHG emission intensity (Scope 1 + Scope 2) 0.1319 2

RMB 10000

Investment in GHG reduction funds 661.5 RMB million

Air emissions 51.56 tons

Sulfur dioxide (SO2) emissions 0.55 tons

Pollutant Nitrogen oxide (NOX) emissions 5.33 tons

Emisson Volatile organic compound (VOCs) emissions 11.66 tons

Particulate matter (smoke and dust) emissions 34.01 tons

Wastewater discharge 82432600 tons

Hazardous waste emissions 1888 tons

Hazardous waste intensity 0.018 kg/RMB 10000

Waste Non-hazardous waste disposal rate 100 %

Disposal Non-hazardous waste emissions 4857700 tons

Non-hazardous waste intensity 0.044 ton/RMB 10000

Non-hazardous waste disposal rate 100 %

Number of major environmental accidents 0 time

Environmental Number of drills for environmental emergencies 12199 times

Compliance in the year

Management Environmental protection investment 1938 RMB million

Environmental protection training sessions 46 sessions

Total energy consumption 3944602 tons of standard coal

tons of standard coal/

Utilization of Energy intensity 0.036 RMB 10000

Energy

Gasoline consumption 443736 tons

Diesel consumption 1329860 tons

125Appendices

Indicator 2025 Unit

Coal consumption 116060 tons

Natural gas consumption 64930000 m3

Utilization of Heat consumption 45590 GJ

Energy Electricity consumption 9578.41 GWh

Electricity consumption intensity 87.56 kWh/RMB 10000

Consumption of renewable resources 355014 tons of standard coal

Water consumption 371839400 m3

Water

Resource Water intensity 3.40 m3/ RMB 10000

Utilization

Recycled water volume 148736000 m3

Total number of employees 289250 persons

Total number of Full-time 289250 persons

employees by

employment type Part-time 0 persons

Senior professional

titles (including senior 57115 (6128) persons

professional)

Intermediate professional

85681 persons

Number of titles

employees by Assistant-level

level 71997 personsprofessional title

Employees at the clerk

17519 persons

level and below

Others 56938 persons

Total number of Male 241470 persons

Employees employees by

gender Female 47780 persons

Under 35 years old 117043 persons

Total number of

35-50 years old 115648 persons

employees by age

Over 50 years old 56559 persons

Total number of Domestic 283486 persons

employees by

region Overseas 5764 persons

College degree and below 83500 persons

Total number

of employees Bachelor's degree 188414 persons

by educational Master's degree 16898 persons

background

Doctoral degree 438 persons

1262025 Environmental Social and Governance Report and Sustainability Report

Indicator 2025 Unit

Proportion of women in senior management 2.3 %

Total number of ethnic minority employees 12717 persons

Total number of newly recruited employees 9346 persons

Percentage of labor contract coverage 100 %

Average paid annual leave days per person 10 days

Social insurance coverage 100 %

Work-related injury insurance coverage 100 %

Employees Employee turnover rate 2.75 %

Employee Male 89.5 %

turnover rate by

gender Female 10.5 %

Under 35 years old 86.9 %

Employee

turnover rate by 35-50 years old 11.6 %

age

Over 50 years old 1.5 %

Mainland China 98.03 %

Employee

turnover rate by Overseas regions and

region Hong Kong Macao and 1.97 %

Taiwan

Number of employees with newly diagnosed

0 person

occupational diseases

Occupational Major work safety liability accidents 1 incident

Health and

Safety (OHS) Physical examination coverage rate 100 %

Workdays lost due to work-related injuries1 0 day

1 Statistical scope covers employees at China Railway headquarters

127Appendices

Indicator 2025 Unit

Occupational Newly added occupational disease cases 0 person

Health and

Safety (OHS) Investment in work safety 23547 RMB million

Total annual training investment 37896.8 RMB 10000

Number of training sessions conducted 1600 times

Total number of employees trained 289250 persons

Training participation rate 100 %

Percentage Male 83.5 %

of trained

employees by

gender Female 16.5 %

Male 160 hours

Average training

hours by gender

Staff Female 150 hours

Training and

Development Senior management 573 persons

Total number

of employees Middle management 8700 persons

trained by

employee General management 116000 persons

category

Frontline staff 163977 persons

Senior management 190 hours

Average Middle management 185 hours

training hours

by employee

category General management 150 hours

Frontline staff 140 hours

1282025 Environmental Social and Governance Report and Sustainability Report

Indicator 2025 Unit

Total R&D investment 22520 RMB million

R&D investment as percentage of core business

2.06%

revenue

Number of R&D personnel 36912 persons

Proportion of R&D personnel to the total

12.76%

number of employees

National key scientific research projects

7 items

undertaken

Innovation- Number of core papers published 1061 articles

driven

Development Number of patents held 48029 items

Number of patents authorized 8540 items

Number of invention patents 3624 items

Number of overseas patents 194 items

Number of software copyrights obtained 906 items

Contract review rate 100 %

Number of complaints about products and

0 case

services

Product

and Service Number of incidents involving infringement of

0 case

Safety and customer privacy and information security

Quality

Number of complaints from customers 0 case

Total number of suppliers 97966 suppliers

Total number of Chinese suppliers 91948 suppliers

Supply Chain

Security Number of suppliers from Hong Kong Macau

808 suppliers

and Taiwan

Number of overseas suppliers 5210 suppliers

129Appendices

Indicator 2025 Unit

Rural Total investment amount in poverty alleviation and rural

87.60 RMB million

Revitalization revitalization

Social

Total amount of public welfare donations 9.24 RMB million

Contributions

Number of corruption lawsuits filed 15 items

Number of directors receiving anti-corruption training 8 persons

Anti- Average hours of anti-corruption training received by

8 hours

commercial directors

Bribery

and Anti- Number of employees participating in anti-bribery and anti- 136216 persons

corruption corruption training

Average hours of anti-corruption training received by

4 hours

employees

Amount involved in cases caused by the Company's unfair

0 RMB 10000

competition practices

Total assets 2470.58 RMB billion

Operating revenue 1093.49 RMB billion

Amount of newly signed contracts 2750.9 RMB billion

Economic

Performance

Total profit 33.54 RMB billion

Net profit 26.347 RMB billion

Total tax payment 35.078 RMB billion

Number of directors 7 persons

Number of female directors 1 person

Proportion of female directors 14.3 %

Corporate

Governance

Number of Nomination Committee meeting 3 times

Number of Board Meetings held 11 times

Number of Shareholders' Meetings held 1 time

1302025 Environmental Social and Governance Report and Sustainability Report

Appendix II Indicator Index of Guidelines No.14 of Shanghai

Stock Exchange for Self-Regulation of Listed Companies—

Sustainability Report (Trial)

Dimension SN Topics Corresponding Article Report Chapter

Responding to Climate

1 Respond to Climate Change Article 21-Article 28

Change

2 Pollutant Emissions Article 30 Air Emissions Management

3 Waste Management Article 31 Waste Management

Ecosystem and Biodiversity Protecting Natural

4 Article 32

Conservation Ecosystems

Environment Strengthening

Environmental Compliance

5 Article 33 Environmental

Management

Management

6 Energy Utilization Article 35 Energy Management

Water Resource

7 Water Utilization Article 36

Management

8 Circular Economy Article 37 Circular Economy

Supporting Rural

9 Rural Revitalization Article 39

Revitalization

Building Harmonious

10 Social Contribution Article 40

Communities

Strengthening

11 Innovation Drive Article 42

Technological Innovation

12 Ethics in Technology Article 43 Not Applicable

Strengthening Supply

Social 13 Supply Chain Security Article 45 Chain Collaboration

Equal Treatment of Small and Medi- Lawful and Compliant

14 Article 46

um-sized Enterprises Operations

Product and Service Safety and Forging Craftsmanship

15 Article 47

Quality Quality

Data Security and Customer Privacy Information Security and

16 Article 48

Protection Privacy Protection

Fostering Employee

17 Employee Article 50

Growth

Strengthening Supply

18 Due Diligence Article 52

Chain Collaboration

Governance Stakeholder

Related to 19 Stakeholder communication Article 53 Communication

Sustainable

Anti-commercial Bribery and Anti-Commercial Bribery

Development 20 Article 55

Corruption and Anti-Corruption

21 Anti-unfair Competition Article 56 Anti-Unfair Competition

131Appendices

Appendix III Indicator Index of Environmental Social and

Governance Reporting Code issued by the Stock Exchange of

Hong Kong Limited

Environmental Social and Governance Aspects and General

Disclosures & Key Performance Indicators (KPIs) Report Chapter

Environment

Information on:

(a) the policies; and

General (b) compliance with relevant laws and regulations that have

disclosure a significant impact on the issuer relating to air emissions Reducing Pollutant Emissions

discharges into water and land and generation of hazardous

and non-hazardous waste.A1.1 The types of emissions and respective emissions data. Air Emissions ManagementAppendix I Key Performance Table

A1: Emissions A1.3 Total hazardous waste produced and intensity. Waste ManagementAppendix I Key Performance Table

A1.4 Total non-hazardous waste produced and intensity. Waste ManagementAppendix I Key Performance Table

A1.5 Description of emission target(s) set and steps taken to achieve them. Environmental Management System

Description of how hazardous and non hazardous wastes are

A1.6 handled and a description of reduction target(s) set and steps Waste Management

taken to achieve them.General Policies on the efficient use of resources including energy

disclosure water and other raw materials. Energy Management

A2.1 Direct and/or indirect energy consumption by type (e.g. Energy Managementelectricity gas or oil) in total and intensity. Appendix I Key Performance Table

A2.2 Total water consumption and intensity. Water Resource ManagementAppendix I Key Performance Table

A2: Use of

Resources A2.3 Description of energy use efficiency target(s) set and steps taken to achieve them. Energy Management

Description of whether there is any issue in sourcing water that

A2.4 is fit for purpose water efficiency target(s) set and steps taken Water Resource Management

to achieve them.A2.5 Total packaging material used for finished products and with reference to per unit produced. Not Applicable

General Policies on minimising the issuer’s significant impacts on the

disclosure environment and natural resources Protecting Natural Ecosystems A3: Environment

and Natural Description of the significant impacts of activities on the

Resources A3.1 environment and natural resources and the actions taken to Protecting Natural Ecosystems

manage them.Social

Information on:

(a) the policies; and

General (b) compliance with relevant laws and regulations that have

disclosure a significant impact on the issuer relating to compensation

Standardizing Employee

and dismissal recruitment and promotion working hours rest Recruitment

periods equal opportunity diversity anti-discrimination and

B1: Employment other benefits and welfare.Total workforce by gender employment type age group and Standardizing Employee B1.1 geographical region. RecruitmentAppendix I Key Performance Table

B1.2 Employment turnover rate by gender age group and geo-graphical region. Appendix I Key Performance Table

1322025 Environmental Social and Governance Report and Sustainability Report

Environmental Social and Governance Aspects and General

Disclosures & Key Performance Indicators (KPIs) Report Chapter

Information on:

(a) the policies; and

General (b) compliance with relevant laws and regulations that have Strengthening the Foundation of

disclosure a significant impact on the issuer relating to providing a Safety

safe working environment and protecting employees from

B2: Health and occupational hazards.Safety

B2.1 Number and rate of work-related fatalities occurred in each of Strengthening the Foundation of the past three years. Safety

B2.2 Lost days due to work injury. Appendix I Key Performance Table

B2.3 Description of occupational health and safety measures Strengthening the Foundation of adopted and how they are implemented and monitored. Safety

General Policies on improving employees’ knowledge and skills for

disclosure discharging duties at work. Description of training activities. Building Development Platforms

B3: Development B3.1 The percentage of employees trained by gender and employee Building Development Platformsand Training category. Appendix I Key Performance Table

B3.2 The average training hours per employee by gender and Building Development Platformsemployee category. Appendix I Key Performance Table

Information on:

General (a) the policies; and(b) compliance with relevant laws and regulations that have a Standardizing Employee disclosure significant impact on the issuer relating to preventing child and Recruitment

B4: Labor forced labour.Standards

B4.1 Description of measures to review employment practices to Standardizing Employee avoid child and forced labour. Recruitment

B4.2 Description of steps taken to eliminate such practices when Standardizing Employee discovered. Recruitment

General Policies on managing environmental and social risks of the Strengthening Supply Chain

disclosure supply chain. Collaboration

B5.1 Number of suppliers by geographical region. Appendix I Key Performance Table

Description of practices relating to engaging suppliers number

B5.2 of suppliers where the practices are being implemented and Strengthening Supply Chain

B5: Supply Chain how they are implemented and monitored. Collaboration

Management

Description of practices used to identify environmental

B5.3 and social risks along the supply chain and how they are Strengthening Supply Chain

implemented and monitored. Collaboration

Description of practices used to promote environmentally

B5.4 preferable products and services when selecting suppliers and Strengthening Supply Chain

how they are implemented and monitored. Collaboration

Information on:

(a) the policies; and

General (b) compliance with relevant laws and regulations that have a

disclosure significant impact on the issuer relating to health and safety Forging Craftsmanship Quality

advertising labelling and privacy matters relating to products

and services provided and methods of redress.B6.1 Percentage of total products sold or shipped subject to recalls for safety and health reasons. Not Applicable

B6: Product

Responsibility B6.2 Number of products and service related complaints received and how they are dealt with. High-Quality Customer Service

B6.3 Description of practices relating to observing and protecting intellectual property rights. Protecting Intellectual Property

B6.4 Description of quality assurance process and product recall procedures. Protecting Intellectual Property

B6.5 Description of consumer data protection and privacy policies Information Security and Privacy and how they are implemented and monitored. Protection

133Appendices

Environmental Social and Governance Aspects and General Disclosures &

Key Performance Indicators (KPIs) Report Chapter

Information on:

General (a) the policies; and Anti-Commercial Bribery

disclosure (b) compliance with relevant laws and regulations that have a significant impact on the issuer relating to bribery extortion fraud and and Anti-Corruption

money laundering.Number of concluded legal cases regarding corrupt practices brought Anti-Commercial Bribery

B7: Anti-corruption B7.1 against the issuer or its employees during the reporting period and the and Anti-Corruption

outcomes of the cases. Appendix I Key Performance Table

B7.2 Description of preventive measures and whistle-blowing procedures Anti-Commercial Bribery and how they are implemented and monitored. and Anti-Corruption

B7.3 Description of anti-corruption training provided to directors and staff. Appendix I Key Performance Table

General Policies on community engagement to understand the needs of the

disclosure communities where the issuer operates and to ensure its activities take

Building Harmonious

into consideration the communities’ interests. Communities

B8: Community

Investment B8.1 Focus areas of contribution. Appendix I Key Performance Table

B8.2 Resources contributed to the focus area. Appendix I Key Performance Table

Climate-Related Disclosure Indicators Related Chapter

Disclose the governing body or individual responsible for oversight of climate-

related risks and opportunities including how competency is available the

Governance frequency and manner of being informed about risks and opportunities how Responding to Climate they are considered in decision-making oversight of target setting and progress Change — Governance

towards targets as well as the management's role in relevant processes and

integration with internal functions.Strategy-Business model Describe the current and anticipated effects of climate-related risks and

and value chain opportunities on the business model and value chain identifying areas of

Responding to Climate

concentration. Change — Strategy

Disclose strategies and plans to address risks and opportunities including changes

Strategy-Strategy and to the business model adaptation or mitigation efforts transition plans methods Responding to Climate

decision-making to achieve climate targets plans of resource allocation for actions and progress Change — Strategy

against previous plans.Strategy-Financial

position financial Disclose the current and anticipated financial impacts of climate-related risks and

performance and cash opportunities on the issuer's financial position financial performance and cash

Responding to Climate

flows flows during the reporting period.Change — Strategy

Strategy-Resilience Disclose the Company's assessment of its climate resilience and the conduct of Responding to Climate climate-related scenario analysis. Change — Strategy

Disclose the processes and policies used to identify assess prioritise and monitor Responding to

Risk Management climate-related risks and opportunities as well as how these risks and opportunities Climate Change —

are integrated into the company's overall risk management framework. Risk and Opportunity Management

Disclose the absolute gross greenhouse gas emissions for Scope 1 Scope 2

Metrics and Targets- and Scope 3 during the reporting period. The disclosure should specify the Responding to Climate

Greenhouse gas measurement methodologies input data assumptions and reasons for any Change — Indicators

emissions changes. Additionally disclose Scope 2 emissions using the location-based method and Targets

and indicate the categories included in Scope 3.Disclose qualitative and quantitative climate-related targets including metrics

used to set the target purpose scope of application time frame baseline period

Metrics and Targets- interim targets target type and linkage to international agreements. Disclose the Responding to Climate

Climate-related targets methodology for setting and reviewing targets metrics for monitoring progress Change — Indicators toward targets and analysis of target performance and trends. For greenhouse and Targets

gas emission targets disclose the types of gases covered scope and gross or net

target amount.

1342025 Environmental Social and Governance Report and Sustainability Report

Appendix IV Terms and definitions

Short Name Full Name

1 CREC/Company/We China Railway Group Limited

2 China Railway First Group China Railway First Group Co. Ltd.

3 China Railway No. 2 Engineering Group China Railway No. 2 Engineering Group Co. Ltd.

4 China Railway No. 3 Engineering Group China Railway No. 3 Engineering Group Co. Ltd.

5 China Railway No. 4 Engineering Group China Railway No. 4 Engineering Group Co. Ltd.

6 China Railway No. 5 Engineering Group China Railway No. 5 Engineering Group Co. Ltd.

7 China Railway Sixth Group China Railway Sixth Group Co. Ltd.

8 China Railway Seventh Group China Railway Seventh Group Co. Ltd.

9 China Railway No. 8 Engineering Group China Railway No. 8 Engineering Group Co. Ltd.

10 China Railway No. 9 Group China Railway No. 9 Group Co. Ltd.

11 China Railway No. 10 Engineering Group China Railway No. 10 Engineering Group Co. Ltd.

12 China Railway Major Bridge Engineering Group China Railway Major Bridge Engineering Group Co. Ltd.

13 China Railway Tunnel Group China Railway Tunnel Group Co. Ltd.

14 China Railway Electrification Engineering Group China Railway Electrification Engineering Group Co. Ltd.

China Railway Wuhan Electrification Engineering

15 China Railway Wuhan Electrification Engineering Group Co. Ltd.

Group

16 China Railway Construction Engineering Group China Railway Construction Engineering Group Co. Ltd.

17 China Railway Guangzhou Engineering Group China Railway Guangzhou Engineering Group Co. Ltd.

18 China Railway Beijing Engineering Group China Railway Beijing Engineering Group Co. Ltd.

19 Shanghai Civil Engineering Co. Ltd. of CREC Shanghai Civil Engineering Co. Ltd. of CREC

20 China Railway Investment Group China Railway Investment Group Co. Ltd.

21 China Railway South Investment Group China Railway South Investment Group Co. Ltd.

22 China Railway Communications Investment Group China Railway Communications Investment Group Co. Ltd.

23 China Railway Yunnan Construction Investment China Railway Yunnan Construction Investment Co. Ltd.

China Railway City Development and Investment

24 China Railway City Development and Investment Group Co. Ltd.

Group

25 China Railway (Shanghai) Investment China Railway (Shanghai) Investment Co. Ltd.

26 China Tiegong Investment & Construction Group China Tiegong Investment & Construction Group Co. Ltd.

China Railway (Guangzhou) Investment & China Railway (Guangzhou) Investment & Development Co. Ltd.

27

Development (China Railway Group Limited General Contracting Subsidiary)

28 China Railway Eryuan Engineering Group China Railway Eryuan Engineering Group Co. Ltd.

29 China Railway Liuyuan Group China Railway Liuyuan Group Co. Ltd.

135Appendices

Short Name Full Name

China Railway Engineering Design and Consulting

30 China Railway Engineering Design and Consulting Group Co. Ltd.

Group

China Railway Major Bridge Reconnaissance & Design China Railway Major Bridge Reconnaissance & Design Institute

31

Institute Co. Ltd.

32 China Railway Academy China Railway Academy Co. Ltd.

33 China Railway Huatie Engineering Design Group China Railway Huatie Engineering Design Group Co. Ltd.

34 China Railway Changjiang Transport Design Group China Railway Changjiang Transport Design Group Co. Ltd.

China Railway Water Conservancy & Hydropower China Railway Water Conservancy & Hydropower Planning and

35

Planning and Design Group Design Group Co. Ltd.

36 China Railway International Group China Railway International Group Co. Ltd.

37 China Overseas Engineering Group China Overseas Engineering Group Co. Ltd.

38 CREC International Engineering Branch CREC International Engineering Branch

39 China Railway Hi-Tech Industry China Railway Hi-Tech Industry Corporation Limited

40 China Railway Real Estate Development Group China Railway Real Estate Development Group Co. Ltd.

41 China Railway Resources Group China Railway Resources Group Co. Ltd.

42 China Railway Trust China Railway Trust Co. Ltd.

43 China Railway Finance China Railway Finance Co. Ltd.

44 China Railway Capital China Railway Capital Co. Ltd.

45 China Railway Materials Trade Group China Railway Materials Trade Group Co. Ltd.

46 CREC Cloud Net Information Technology CREC Cloud Net Information Technology Co. Ltd.

136

免责声明:用户发布的内容仅代表其个人观点,与九方智投无关,不作为投资建议,据此操作风险自担。请勿相信任何免费荐股、代客理财等内容,请勿添加发布内容用户的任何联系方式,谨防上当受骗。

相关股票

相关板块

  • 板块名称
  • 最新价
  • 涨跌幅

相关资讯

扫码下载

九方智投app

扫码关注

九方智投公众号

头条热搜

涨幅排行榜

  • 上证A股
  • 深证A股
  • 科创板
  • 排名
  • 股票名称
  • 最新价
  • 涨跌幅
  • 股圈